ARMY MIL-C-60940-1968 CUP LEAD ASSEMBLY FOR FUZES PD M551& M533《M551及M533型PD铅装载引信雷管》.pdf
《ARMY MIL-C-60940-1968 CUP LEAD ASSEMBLY FOR FUZES PD M551& M533《M551及M533型PD铅装载引信雷管》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-60940-1968 CUP LEAD ASSEMBLY FOR FUZES PD M551& M533《M551及M533型PD铅装载引信雷管》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-60940 (MU) 10 January 1968 MILITARY SECIFICATION CUP, IZAD ASSEMBLY FOR FUZES, PDj M551 AND M533 1. scorn 1.1 This specification covers one type of lead cup assembly designated a8 Lead Cup Assembly for use in Fuzes, PD, M551 and M533. 2. APPLICABLE DOCU“S 2.1 The following documents of the iss
2、ue in effect on date of invitation for bids or request for proposcl, form a part of this specification to the extent specified herein: SPECIFICATIONS JAN-0-155 - Graphite For use In Ammunition) MILITARY MIGR-398 - RDX MU-A-2550 - Ammunition and Special Weapons; General MIL-L-10287 - Green Lacquer MI
3、L-C-20470 - Calcium Resinate MIL-P-45486 - Pellets, RDX ML-1-45607 - Inspection Equipment, Supply and Specification for Maintenance of STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105) FSC: 1375 P Provided by IHSNot for ResaleNo reproduction o
4、r networking permitted without license from IHS-,-,-MIL-STD-109 MIL-STD-1168 MIL-STD-1169 MIL-STD-1235 Quality Assurance Terms End Definitions Lot Numbering of Ammunition Packaging, Packing and Mcrking for Shipment of Inert Ammunition Components Single and Multilevel Continuous Sampling Procedures a
5、nd Tables for Inspection by Attributes DRAWINGS U. S. ARNY MUNITIONS COMMAND 8876218 - Lead Cup Assembly PUBLICATIONS U. S. ARMY MUNITIONS COMMAND ET - 8876218 - Equipment Tabulation (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific poc
6、urernent functions should be obtained from the procwing activity or as directed by the Contracting Officer.) part of this specification to the extent specified herein. Unless otherwise indicated, the issue in effect on the date of invitation for bids or request for proposal shall apply. 2.2 Other pu
7、blications.- The folowirg documents form a CODZ OF FEDERAL FBGULATIONS 49-CFR 171-178 - Interstate Comzerce Commission Rules and Regulations for the Trmsportation of Explosives and Other Dangerous Articles (The Interstate Commerce Commission Regulations are now E part of the Code of Federal Regulati
8、ons (1949 Edition and revisions) availeble from the Superintendent of Docxments, U. S. Govelinment Printing Office, Washington, D.C. 2C402. publications should cite, “49 CFR 171-178, (latest revision).) Orders for the above 2 Provided by IHSNot for ResaleNo reproduction or networking permitted witho
9、ut license from IHS-,-,- _ MIL-C-60740 13 7779706 0342307 2 MIL-C-60940 (MU) 3. REQUIREMENTS 3.1 Material.- Materials shall be in accordance with the applicable drawings and specifications, RDX - MIL-R-398, Type B, Class C Calcium Resinate - MIL-C-20470, Type II, except that Graphite - JAN-G-155, Gr
10、ade I or II the material shall pass a number 100 United States Standard Sieve 3.2 Lead cup assembly.- The lead cup assembly shall comply with all requirements specified on Drawing 8876218 and with all requirements specified in applicable specifications. Including the surface of the RDX shall be free
11、 of all cracks or laminations prior to application of the green lacquer. 3.4 Moisture content.- The moisture content of the RDX composition at the time and site of loading shall not exceed 0.20 percent when determined as specified in 4.4.5. Functioning.- The lead cup assembly shall be capable of hig
12、h order initiation by an M55 detonator across a minimum air gap of 0.J65 inches when tested-in accordance with 4.4.7. High order detonation will be evidenced by a depression in the lead block approximately 51 16 tnch in diameter and a minimum of ,125 Inches in depth. 3.3 Cracks or laminations.- The
13、lead cup assembly, 3.5 3.6 Workmanship.- All parts and assemblies shall be fabricated, loaded and assembled in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, grease, rust and other foreign matter. be InJurious to any part, nor shall the parts be contaminated
14、by the cleaning agents. Exterior surface coatings shall be con- tinuous except for a few light scratches not exposing base material. and tests.- The Contractor shall forward copies of the results of any of his examinations or tests to the designated address as required by the contract, the specifica
15、tion, or as requested by the Contracting Officer. (See 6.5) The cleaning method used shall not All required marking shall be neat and sharply defined. Submission of results of contractor-conducted examinations 3.7 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license
16、 from IHS-,-,-MIL-C-60940 (MU) 4. QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance provisions.- Unless otherwise specifled in the contract or purchase order, the eupplier Is responsible for the performance of all Inspection requirements as specified herein. Except as otherwise specified, t
17、he supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed r
18、equirements. MIL-STD-109 In order to define terms used herein. of MU,-A-2550 shall apply. of product is submitted to the Government for acceptance, the contractor shall supply the following Information accompanied by a certificate which attests that the information provided is correct and applicable
19、 to the product being submitted: a. A statement that the lot complies with all of the quality assurance provisions specified within this specification. b. Number of units of product inspected. C. Results obtained, by defect code, for all inspections performed. d. Drawing, specification number and da
20、te, together with an identification and date of changes. e. Certificates of conformance on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contractual documents. f. g. Date submitted. Reference shall be mad
21、e to The provisions Submission of product.- At the time the completed lot. 4.1.1 Number of items in the lot. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his
22、 principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. 4.2 First article inspection.- Not applicable. 4 I. Provided by IHSNot for ResaleN
23、o reproduction or networking permitted without license from IHS-,-,-MIL-C-bo740 33 W 7779706 0342333 O a NIL-C- 60940 4.3 Inspection provisions.- 4.3.1 Lot formation.- The term “lot“ as used throughout this speclflcation refers to an inspection lot, which is defined as an essentially homogeneous col
24、lection of units of product from which a representative sample is drawn and inspected to determine conformance of the lot with applicable requirements. The sample selected shall represent only that quantity of units from which the sample was drawn and shall not be construed to represent any prior or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC609401968CUPLEADASSEMBLYFORFUZESPDM551M533M551 M533 PD 装载 引信 雷管 PDF

链接地址:http://www.mydoc123.com/p-441965.html