ARMY MIL-C-48654-1986 CARTRIDGE IGNITION M702A1 LOADING ASSEMBLING AND PACKING《M702A1型点火弹的装卸 组装和包装》.pdf
《ARMY MIL-C-48654-1986 CARTRIDGE IGNITION M702A1 LOADING ASSEMBLING AND PACKING《M702A1型点火弹的装卸 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-C-48654-1986 CARTRIDGE IGNITION M702A1 LOADING ASSEMBLING AND PACKING《M702A1型点火弹的装卸 组装和包装》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION MIL-C-48554 17 FEBRUARY 1 CARTRIDGE, IGNITION, M702A1 LOADING, ASSEMBLING AND PACKING This Specification is approved for use within the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1.
2、 SCOPE 1.1 Scope. This specification contains requirements and provides quality assurance provisions for the loading, assembling and packing of the M702A1 Ignition Cartridge for the Light Weight Company Mortar System. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standar
3、ds. Unless otherwise specified (see 6.2) , the Zollowing specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the .solicitation, form a part of this specification to the extent spec i f ied her e in .
4、SPECIFICATIONS MILITARY MIL-P-223 - Powder, Black MIL-P-46425 - Primer, Percussion, M35, Loading MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions , General Spec if icat ion for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes Beneficial eomm
5、tnts (recommcndatiw, additions, deletions) and any pertinent distribution is unlimited. AMSC N/A DISTRIBTIN STATEWNT A. THIS DOCUMENT CONTAINS 26 PAGES. ppp Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48654 (AR) MIL-STD-414 - Sampling Proce
6、dures and Tables for inspection by Variables for Percent Defective 2.1.2 Other Government documents, drawinqs, and publications. and publications form a part of this specification to the extent spec if ied here in . DRAWINGS (See 6.5) The following other Government documents, drawings, US ARMY ARMAM
7、ENT RESEARCH AND DEVELOPMENT CENTER (ARDC) PRODUCT AND PACKAGING DRAWINGS 12630941 - Cartridge, Ignition, M702A1 Loading Assembly 9287826 - Packing and Marking for Box, Fiberboard, Packing, for Cartridge Ignition, M702 INSPECTION EQUIPMENT DRAWINGS 9278622 - Envelope Drawing for Leak Testing of Igni
8、tion Cartridges (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) 2.1.3 Order of precedence. In the event
9、 of a conflict between the text of this specification and the references cited herein, the test of this specification will take precedence. 3 . REQUIREMENTS 3.1 Material. Materials shall be in accordance with 3.2 Assembly. The ignition .cartridge assembly and components applicable drawings and speci
10、fications. shall comply with all requirements specified on Drawing (dwg) 12630941 and with all requirements specified in applicable specifications, associated drawings and standards. 3.3 Moisture content of black powder. The moisture content of the black powder used in loading the ignition cartridge
11、, at the time of loadinq, shall not exceed 0.50 percent. Testing shall be as specified in-4.5.1. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4 Sensitivity. 3.4.1 Nonfunctioning. The primer shall not function under an applied energy value of 8
12、.85 inch ounces minimum (min.) when tested as specified in 4.5.2.1. 3.4.2 Functioninq. The primer shall function under an applied energy value of 82.60 inch ounces maximum (max.) when tested as specified in 4.5.2.2. 3.4.3 Safety drop test. The primer shall not function as a result of the five foot c
13、artridge drop specified in 4.5.2.3. 3.4.4 Cartridqe drop test. The primer shall function when tested as specified in 4.5.2.4. 3.5 Leak test. The loaded cartridges shall satisfactorily pass the leak test specified in 4.5.3. 3.6 Velocity, functioninq and security (proving -qround test). The ignition c
14、artridges shall comply with the following requirements (see 4.5.5) . 3.6.1 Misfires. The ignition cartridges shall function on 3.6.2 Metal part security. There shall be no evidence of the first attempt, without any audible hangf ire . rupture or metal parts separation in the gun bore or in flight. 3
15、.6.3 Velocity and functioning (proving ground). The cartridge assemblies shall function and shall impart a corrected muzzle velocity of not more than 219 feet per second (fps) and not less than 199 fps. In addition, the velocity standard deviation of the lot shall be not greater than 4.0 fps. 3.7 Pr
16、opellant charqe uniformity. The M9 propellant lots shall achieve a velocity of 210 fps (see 4.5.6). This test shall be required when a lapse of six months or more occurs between propellant acceptance and LAP initiation. 3.8 Static pressure. The average internal ignition cartridge pressure plus 4 sta
17、ndard deviations shall not exceed 22,000 psi (see 4.5,7) . 3.9 First article inspection. This specification contains technical provisions for first article inspection. Requirements 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48654 (AR) U
18、for the submission of first article samples by the contractor shall be as specified in the contract. 3.10 Workmanshie. All parts and assemblies shall be fabricated and loaded in a thorough workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other foreign matter. The
19、cleaning method used shall not be injurious to any part nor shall parts be contaminated by the cleaning agent. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions. Unless otherwise specif
20、ied herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Article inspection b. Quality Conformance Inspection 4.3 Fi
21、rst article inspection 4.3.1 Submission. The contractor shall submit a first article sample as designated by the contracting officer for evaltiation in accordance with provisions of 4.3.2. The first article sample shall consist of the components in the quantities indicated in Table I. 4.3.2 Inspecti
22、on to be performed. See MIL-A-48078 and Table 4.3.3 Rejection. See MIL-A-48078 I specified herein. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-48654 13 9797906 0322923 4 al 4 u .4 .:I Er I H Y n p: 4 Y * m ro Co * r rn d r i3 n Y w 8 3 I
23、I 5 I 2 =. Li I - l-l 4 cv r 04 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-HIL-C-4bS4 13 m 7797306 0322722 b MIL-C-48654(AR) 4.4 Quality conformance inspection 4.4.1 Inspection lot formation. Inspection lots shall comply with the lot formation p
24、rovisions of MIL-A-48078. In addition, each inspection lot of ignition cartridges shall contain: a. Metal parts of one lot interfix from one manufacturer. b. Black powder from not more than one lot from one manufacturer. C. Percussion elements from not more than one lot interfix from one manufacture
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILC486541986CARTRIDGEIGNITIONM702A1LOADINGASSEMBLINGANDPACKINGM702A1 点火 装卸 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-441655.html