AIR FORCE MIL-T-8606 C-1973 TUBING STEEL CORROSION-RESISTANT (18-8 STABILIZED AND EXTRA LOW CARBON)《(18-8极低碳稳定)防腐钢制油管》.pdf
《AIR FORCE MIL-T-8606 C-1973 TUBING STEEL CORROSION-RESISTANT (18-8 STABILIZED AND EXTRA LOW CARBON)《(18-8极低碳稳定)防腐钢制油管》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-T-8606 C-1973 TUBING STEEL CORROSION-RESISTANT (18-8 STABILIZED AND EXTRA LOW CARBON)《(18-8极低碳稳定)防腐钢制油管》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、1 .“. .y- -i,a, L.MIL-T-8606C18 June 19735UPESSEDINGMIL-T-8606B22 May 1967M2LITASY SPECIFICATION* TUBING, STEEL, CORROSION-SESISTANT (18-B STABILIZEDAND EXTSA LOW CASBON)Test MethodsStd No. 151forIProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. -MI
2、L=T.8606CI . .uI . _. .+D=STD-183 ”-”-”-”-Continuous Identification Msrking of,1q.onand .Stee1P.ductsMilitaryMIL-STSL163 Steel Mill Products, Preparation forIShipment and StorageMIL-STO-753 Corrosion-Resistant Steel Parts,sampling, Inspection and Testingfor Surface Passivation1 MS33S34 Standard Dime
3、nsions fO? Streamlineand Oval Tubular ShapesANA Desiqn StandardAND101o2 Tubing . Standard Dimensions forRound Seamless Alloy Steel(Copies of specifications, standards, drawings, and publicationsrequired by suppliers in connection with specific procurementfunctions should be obtained from the procuri
4、ng activity or asdirected by the contracting officer. )a712.2 Other publications. The follosiing documents form a part ofthi specification to the extent specifiad herein. Unless otherwiseindicatsd, the issue in effect on date of invitation for bids orrequest for proposal shall apply.u AMSRICAN NATIO
5、NAL STANDARDS INSTI (ANSI)S46.1 Surface Texture (Surface Roughness, Waviness and Lay)(Application for copies should be addressed to the American NationslStandsrds Institute, Inc. , 1430 BrOadway, New yOrk, New yOrk 10018- )AMSRICAN sOCIETY POR lESTING AND MATSRIALS (ASTM)A370 Mechanical Testing of S
6、teel Products(Application for copies should be addressed to the American societyfor Testing and Msterials, 1916 Race Street, Philadelphia,Pennsylvania 19103. )2. w*Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T.86WC(Technical society and techn
7、ical association specifications andstandards are generally available for reference from libraries.They are also distributed among technicel groups and using Federalagencies. )3. RSQUI-NTS3.1 Materials. The steel shell be manufactured by the electric-furnace process and shall conform to this specific
8、ation, Heat-treatingequipment used in connection with tubing production shall be capableof meeting the temperature control requirements of section 3 ofMILH-6875 . Heating shall be accomplished in an atmosphere whichwill provide a smooth gray or bright surface free from carburization,nitriding, or ot
9、her deleterious surface effeets.3.1.1 Chemil composition. The chemical camp. sition shall conformto teble I.Table I . Chemical composition limits.CheckElement COmpO sition limits fpercent ) Anal ysistolerant304L 347 321 (w rcent Carbon 0.03 (Max) 0.08 (max ) 0.08 (max) +0.01Manganese 2.00 (Max) 2.00
10、 (Max) 2.00 (Max) +0.04Phosphorus 0.040” (ma%) 0.C40 (C however, tubing shallnot be sized by metal removal methods. (See 6.1.1) 4. QUALIN ASSURAN(13 PROVISIONSa714 .1 Responsibility for inspection. Unless otherwise specified inthe contract or purchase order, the supplier is responsible for theperfor
11、mance of all inspection requirements as spscified herein.Except as otherwise specified in the contract or order, the supplier=Y use his O- Or any other facilities suitable for the performanceof the inspection requirements specified herein, unless disapprovedby the Governmnt . The Government reserves
12、 the right to perform anyo f the inspections set forth in the specification where such inspect.ions are deemed necessary to assure supplies and services conform toprescribed requirements .w6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I;. lfIL-T-8
13、606c.“1.* 4.2 Classification of Inspections. Al1 inspections and exmninationsspecified herein are classffied as quality conformance inspections.* 4.3 Inspection lot. A lot shall consist of tubing of one size and wallthickness from one heat of steel, one method of manufacture, and annealedin the sams
14、 charge (batch anneal), or annealed at the Ems temperature,time, and atmosphere, withnut interruption within a 4 hour period(continuous ameal).*”4.4 Examination of product. Each length of tubing shal1 be visuallyexmined for compliance with surface condition and workmanship require-,ments. Samples se
15、lected frcm each lot at randnm in accordance withtable IV shall be examined for conforpxanceto dimensions and tolerance,identification marking, and preparat inn for delIvery.Table IV. Samulim nlan.Lot size 3emple(tubes) sizelt03 All4 to 25 426 to 6S 666 to 180 13181 to 300 20301 to 800 32Over 800 50
16、 Applied to the number ofo0001231111234tubes found defective.I 4.5 Chemical analysis4.5.1 Samplinq. A sample for chemical analysis shall be selected,as specified in mathod 111 of Fed Test Method Std No. 151, torepresent each heat in the shipment.4 .5.1.1 Waiver Samples for chemical analysis may be w
17、aived,provided ;l of the material under inspection can be identifiedas being nade from a heat previously analyred and found to conformto the chemical composition specified herein.4 .5.2 Analysis. Analysis shall be by Method 111 or 112 FederalTest Method Standard No. 151. In the event of a dispute, a
18、nalysisshall be by Method 111, as applicable.7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-T-8606CI 4.6 Mechanical prow rtiesI 4.6. I %mpIinQ. IXVO samples shall be selected to represent each2,000 feet of tubing of each lot up to 5,000 feet, a
19、nd two additionalsamples from each additional .S,000 feet of the lot.+4.6.2 ecimens. One epecimn shslI be cut from each pieces of tubingcomvrisina the senmle. %ecimens shall consist of a full section oftubing, when practcable, -or may be machinedNo. 2 in Supplement II of ASTM A370.a714 .6.3 Method S
20、pecimens shall be tested as.4.7 Flanqinqto confo mu to specimendetailed in ASTM A370. samules shall be select-4.7.1 Sa I inq. Unless otherwise specified, .ed at random from various lengths of tubing in accordance with tablev.Table V. Sampling planI 1 Il-at size Accept able No.(Tubes) samule size rej
21、ectable1 to 25 4 026 to 65 6 066 to 180 8 0181 to 300 9 0301 tO aoo 10 0Over 800 15 04 .7.2 ecimens. Flanging test specimens shall be cut from eachpiece of tubing comprising the sample. Specimens shall be full crosssections of tubing not less than 4 inches in length.4 .7.3 Uethod. Specimsna shall ha
22、ve a flange turned to a positionpeqendcular to the body of the tubing by means of a flare tool anddie block. The height of the flange shall be not lese than 15 per-cent of the nominal diameter for tubing 2-1/2 inches or less indiameter, and not less than 10 percent of the nominal diameter forlarger
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILT8606C1973TUBINGSTEELCORROSIONRESISTANT188STABILIZEDANDEXTRALOWCARBON188 极低碳 稳定 防腐 钢制 油管 PDF

链接地址:http://www.mydoc123.com/p-428683.html