1、 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 1 GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS JULY 2008 NOTICE NO. 4 August 2012 The following Rule Changes become EFFECTIVE AS OF 1 AUGUST 2012. (See http:/www.eagle.org for the consolidated version of the Guide for Building
2、and Classing Mobile Offshore Units 2008, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction. (See 1-1-4/3.3 of the ABS Rules for Conditions of Classificatio
3、n Offshore Units and Structures (Part 1).) CHAPTER 1 SCOPE AND CONDITIONS OF CLASSIFICATION SECTION 2 CLASSIFICATION SYMBOLS AND NOTATIONS (Revise Subsection 1-2/7, as follows.) 7 Temporary Mooring Equipment and Systems (1 August 2012) Temporary mooring is intended for release at anchor or in an eme
4、rgency while the unit is in the transit mode. The symbol will be placed after the symbols of classification to signify that the equipment for anchoring (temporary mooring) of the unit is in compliance with 3-4-1/3 of the ABS Rules for Building and Classing Mobile Offshore Drilling Units (MODU Rules)
5、. For self-propelled units, symbol is mandatory and all anchoring (temporary mooring) equipment is to be fabricated and tested in presence of and to the satisfaction of the attending Surveyor, and certified in accordance with 6-1-10/Table 1 of the MODU Rules. For non-propelled units fitted with an a
6、nchoring (temporary mooring) equipment, if the optional symbol is requested, equipment is to be fabricated and tested in presence of and to the satisfaction of the attending Surveyor, and certified in accordance with 6-1-10/Table 1 of the MODU Rules. (Revise Subsection 1-2/9, as follows.) 9 Position
7、 Mooring Equipment and Systems (1 August 2012) Position mooring is intended for maintaining position during the operation of the unit. 9.1 Symbol for Position Mooring Equipment The symbol will be placed after the symbols of classification, provided the position mooring equipment, certified by ABS in
8、 accordance with the optional class service requested by the Owner, at least complies with 3-4-1/5 of the MODU Rules and with requirements of the Owners specification. Notice No. 4 August 2012 2 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 9.3 Symbol for Position Mooring System The
9、 symbol will be placed after the symbols of classification to signify that the position mooring systems, certified by ABS in accordance with the optional class service requested by the Owner, are in compliance with Appendix 3-4-A1 of the MODU Rules and 3-4-1/7 of the MODU Rules and with requirements
10、 of the Owners specification. CHAPTER 1 SCOPE AND CONDITIONS OF CLASSIFICATION SECTION 4 PLANS AND DESIGN DATA TO BE SUBMITTED (Revise Subsection 1-4/7, as follows.) 7 Additional Plans (1 August 2012) Where additional class notations or certification under the other Rules, Guides or regulations as d
11、escribed in Section 1-1-5 of the ABS Rules for Conditions of Classification Offshore Units and Structures (Part 1) are requested, submission of additional plans and calculations may be required. CHAPTER 1 SCOPE AND CONDITIONS OF CLASSIFICATION SECTION 5 OPERATING MANUAL 1 (Revise first paragraph of
12、Subsection 1-5/1, as follows.) (1 August 2012) An operating manual which is consistent with the information and criteria upon which classification is based is to be placed aboard the unit for the guidance of the operating personnel. The primary language of the Operating Manual is to be English. Unit
13、s not meeting the criteria of 3-1-3/1.3 and 4-1-1/7.7 of the MODU Rules for unrestricted service are to have the notation Restricted Service placed in the Operating Manual. In cases where units are designed to the criteria for unrestricted service, but where certain additional conditions specified b
14、y the Owner are presented which do not meet the criteria for unrestricted service, the Operating Booklet is to contain a notation Limited Service Condition for such additional condition. Insofar as classification is concerned, the operating manual is to include, as appropriate, the following informa
15、tion: 1.3 (Revise Item 1-5/1.1i), as follows.) i) (1 August 2012) Limiting environmental conditions, including wave height and period, wind velocity, current velocity, service temperature of the unit (see 3-1-1/25 of the MODU Rules), minimum expected sea temperature, sea bed penetration, spud can-so
16、il stiffness, air gap, and water depth; Notice No. 4 August 2012 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 3 CHAPTER 1 SCOPE AND CONDITIONS OF CLASSIFICATION SECTION 6 CONSTRUCTION BOOKLET (Relocate Chapter 1, Section 6 to 7-1/Table 2.) CHAPTER 2 GENERAL SECTION 1 DEFINITIONS 5
17、Types of Unit (Revise Paragraph 2-1/5.1, as follows.) 5.1 Self-Elevating Unit (1 August 2012) A unit with movable legs capable of raising its hull above the surface of the sea and lowering it back into the sea. The hull has sufficient buoyancy to transport the unit to the desired location. Once on l
18、ocation, the hull is raised to a predetermined elevation above the sea surface on its legs, which are supported by the sea bed. The legs of such units may be designed to penetrate the sea bed, may be fitted with enlarged sections or footings, or may be attached to a bottom mat. CHAPTER 2 GENERAL SEC
19、TION 2 ENVIRONMENTAL LOADINGS 1 Loading Criteria (1 August 2012) (Revise first paragraph of Subsection 2-2/1, as follows.) A units modes of operation should be investigated using anticipated loads, including gravity and functional loads together with relevant environmental loads due to the effects o
20、f wind, waves, currents, and where deemed necessary by the Owner or designer, the effects of earthquake, sea bed supporting capabilities, ambient temperature, fouling, ice, etc. Where applicable, the loads indicated herein are to be adhered to for all types of mobile offshore units. The Owner is to
21、specify the environmental conditions for which the plans for the unit are to be approved. These design environmental conditions are to be recorded in the Operating Manual see 1-1-5/1.3i) of the MODU Rules Supplement to the ABS Rules for Conditions of Classification Offshore Units and Structures (Par
22、t 1). Notice No. 4 August 2012 4 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 (Revise 2-2/Table 1, as follows.) TABLE 1 Material Selection (1 August 2012) Section of MODU Rules Material Characteristics 3-1-4/1.3 Toughness 3-1-4/1.5 Materials Other than Steel 3-1-4/1.7 Service Tempe
23、rature 3-1-4/1.9 Hull Steel Grades 3-1-4/3 Selection of Grades 3-1-4/5 Note: Any reference to “drilling” in the MODU Rules is to be interpreted as referring to the type of operation for which the mobile offshore unit is designed and/or intended. CHAPTER 3 HULL CONSTRUCTION AND EQUIPMENT SECTION 1 PL
24、ANS AND DESIGN DATA TO BE SUBMITTED 1 Hull and Design Data (Add new last bullet and revise second-to-last bullet of Subsection 2-3/1, as follows.) (1 August 2012) A description of environmental conditions including the service temperature of the unit (see 3-1-1/25 of the MODU Rules) and minimum expe
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS160NOTICE42012GUIDEFORBUILDINGANDCLASSINGMOBILEOFFSHOREUNITSPDF

链接地址:http://www.mydoc123.com/p-400641.html