ABS 160 CORR-2010 GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS《海上移动装置建造入级指南》.pdf
《ABS 160 CORR-2010 GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS《海上移动装置建造入级指南》.pdf》由会员分享,可在线阅读,更多相关《ABS 160 CORR-2010 GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS《海上移动装置建造入级指南》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 1 GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS JULY 2008 CORRIGENDA/EDITORIALS 1 May 2010 CORRIGENDA/EDITORIALS 1 August 2012 CORRIGENDA/EDITORIALS 5 December 2012 CORRIGENDA/EDITORIALS 11 March 2013 CORRIGENDA/EDITORIALS 1 Feb
2、ruary 2014 Page No. Paragraph Comments Chapter 1 Scope and Conditions of Classification Section 2 Classification Symbols and Notations 3 1-2/1.5 Reference “Chapter 7” to read “Chapter 8”. 6 1-2/15 Reference “Section 4-3-5 of the Steel Vessel Rules” to read “the ABS Guide for Dynamic Positioning Syst
3、ems”. Chapter 1 Scope and Conditions of Classification Section 4 Plans and Design Data to be Submitted 11 1-4/1 Reference “5-1/1.7” to read “5-1/1.9”. 11 1-4/3 References “4-1/1.7, 4-2/1.7, 4-3/1.5 and 5-2/1” to read “4-1/1.7, 4-2/1.7, 4-3/1.5, 5-2/1.3 and 6-1/1.5.1”. Chapter 1 Scope and Conditions
4、of Classification Section 5 Operating Manual 13 1-5/1 References “3-1-2/1.3, 3-2-3/7.1.2 and 3-2-3/7.3.2 of the MODU Rules” to read “3-1-3/1.3 and 4-1-1/7.7 of the MODU Rules”. 13 1-5/1ii) References “3-1-2/1.11 and 3-2-3/5.7 of the MODU Rules” to read “3-1-3/1.11 and 3-2-3/5.7 of the MODU Rules”. 1
5、4 1-5/1v) Reference “3-1-2/1.11 of the MODU Rules” to read “3-1-3/1.11 of the MODU Rules”. 14 1-5/1vii) Reference “3-1-2/1.3.3(a) of the MODU Rules” to read “3-1-3/1.3.3(a) of the MODU Rules”. 14 1-5/1.3 In first paragraph, “ensure” to read “verify”. Chapter 2 General Section 2 Environmental Loading
6、s 21 2-2/1 In second paragraph, reference “Section 3-1-2 of the MODU Rules” to read “Section 3-1-3 of the MODU Rules”. Chapter 2 General Section 3 Material Selection 23 2-3/1 In second paragraph, reference “Section 3-1-3 of the MODU Rules” to read “Section 3-1-4 of the MODU Rules”. Corrigenda/Editor
7、ials 1 February 2014 2 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 Page No. Paragraph Comments Chapter 2 General Section 3 Material Selection 23 2-3/Table 1 Revise 2-3/table 1 as follows: Section of MODU Rules Material Characteristics 3-1-4/1.3 Toughness 3-1-4/1.5 Materials Other
8、than Steel 3-1-4/1.7 Service Temperature 3-1-4/1.9 Hull Steel Grades 3-1-4/3 Selection of Grades 3-1-4/5 Chapter 3 Hull Construction and Equipment Section 1 Plans and Design Data to be Submitted 28 3-1/3 Revise last two bullets to be paragraphs, as follows: 3 Calculations The following calculations
9、are to be submitted. Structural analysis, including fatigue analysis Resultant forces and moments from wind, waves, current, mooring and other environmental loadings Effects of icing on structural loadings and stability Wind resistance area of exposed structural elements Stability calculations, both
10、 intact and damaged Calculations substantiating adequacy of structure to transmit forces between legs and hull through the jacking or other self-elevating system Evaluation of the units ability to resist overturning while bearing on the sea bed Submitted calculations are to be suitably referenced Re
11、sults from model tests or dynamic response calculations may be submitted as alternatives or substantiation for required calculations. Chapter 3 Hull Construction and Equipment Section 2 Hull Structures and Arrangements 33 3-2/11.3 Reference “Subsection 6-1-1/33 of the Steel Vessel Rules and any part
12、 of Section 6-1-1 applicable to non-self-propelled units” to read “Subsection 6-1-1/33 of the Steel Vessel Rules including 6-1-5/31 for non-self-propelled units”. Chapter 3 Hull Construction and Equipment Section 3 Stability and Watertight/Weathertight Integrity 35 3-3/1 Reference “3-3-1/1 of the MO
13、DU Rules” to read “3-3-2/1 and 3-3-1/3 of the MODU Rules”. 35 3-3/3 Revise last sentence of first paragraph to read “For purposes of these calculations, the configuration of the unit is to reflect the actual condition of the unit during afloat operation, such as the operation of cranes and the posit
14、ion of legs for self-elevating units.”. Corrigenda/Editorials 1 February 2014 ABSGUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS .2008 3 Page No. Paragraph Comments Chapter 3 Hull Construction and Equipment Section 3 Stability and Watertight/Weathertight Integrity 36 3-3/3 In second paragraph,
15、 reference “3-3-1/3 of the MODU Rules” to read “3-3-2/3 of the MODU Rules”. 36 3-3/5 In last paragraph, reference “3-3-1/9.1 of the MODU Rules” to read “3-3-2/5.1 of the MODU Rules”. 36 3-3/7 In first paragraph, reference “3-3-1/1.3.2 of the MODU Rules” to read “3-3-2/1.3.2 and 3-3-2/1.3.3 of the MO
16、DU Rules”. 36 3-3/7 In fourth paragraph, reference “3-3-1/7 of the MODU Rules” to read “3-3-2/3.5 of the MODU Rules”. 37 3-3/Table 3 Revise references in 3-3/Table 3 as follows: Section of MODU Rules Self-Elevating Units 3-3-2/3.5.1 Column-Stabilized Units 3-3-2/3.5.2 37 3-3/9 Reference “3-3-1/9 of
17、the MODU Rules” to read “3-3-2/5 of the MODU Rules”. 37 3-3/Table 4 Revise references in 3-3/Table 4 as follows: Section of MODU Rules Weathertight Integrity 3-3-2/5.1 Watertight Integrity 3-3-2/5.3 Penetrations 3-3-2/5.5 Chapter 4 Machinery and Systems Section 1 Machinery, Equipment and Their Insta
18、llation 8 (Notice 4) 4-1/1.5 Revise to read: “Compliance with the provisions of Section 4-3-5 of the Steel Vessel Rules is required for main propulsion thrusters in all cases and for propulsion assist thrusters and athwartship thrusters, where an optional notation in accordance with 1-2/13 or 1-2/15
19、 is desired. Dynamic positioning systems, including their thrusters, are to comply with the ABS Guide for Dynamic Positioning Systems.” 9 (Notice 4) 4-1/1.9 In second paragraph, reference “Section 4-9-4 of the Steel Vessel Rules” to read “Section 4-9-6 of the Steel Vessel Rules”. Chapter 4 Machinery
20、 and Systems Section 2 Pumps and Piping Systems 47 4-2/1 In first paragraph, reference “See also 4-1/1.7” to read “For definitions of terms, refer to 4-2-1/3 of the MODU Rules”. Chapter 4 Machinery and Systems Section 3 Electrical Installations 53 4-3/1.5 Reference “4-3/3.1, 4-3/5.1, 4-3/7.1 and 4-3
21、/9.3.2” to read “4-3/3.1, 4-3/5.1, 4-3/9.3.2, and 4-3/11.3”. 55 4-3/Table 2 Revise “Main Source of Power” to read “Main Service Source of Power”. 56 4-3/5.1.3 In last line, reference “6-2-4/11.1 and 4-3-3/9.1 of the MODU Rules” to read “6-2-5/9.3 and 4-3-3/9.1 of the MODU Rules”. 56 4-3/5.1.3 In las
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS160CORR2010GUIDEFORBUILDINGANDCLASSINGMOBILEOFFSHOREUNITS 海上 移动 装置 建造 指南 PDF

链接地址:http://www.mydoc123.com/p-400637.html