1、CDM Considerations and Opportunities in Cambodia: Energy Efficiency, Transport & Renewable Energy,Andrew Williamson Advisor to Department of Energy Technique (Ministry of Industry, Mines and Energy,National Workshop on Capacity Development for the Clean Development Mechanism 26-27 March 2003,Structu
2、re of Presentation,Key questions How can CDM help projects in Cambodia? How do CDM projects work? What opportunities exist in Cambodia?,Energy Efficiency,Transport,Renewable Energy,CDM considerations International Case Study Opportunities in Cambodia,CDM Project Requirements,A CDM project must be RE
3、AL (it will actually reduce emissions) Measurable (the emission savings can be quantified) Additional (the savings would not have happened without the project) Sustainable (defined by host country to include environmental + community benefits, technology transfer etc),Energy Efficiency CDM Considera
4、tions (1),The main types of EE projects are:,Demand Side Example: Retrofit new efficient lighting, reduce energy losses in process, introduce new efficient appliances,Supply Side Example: Improve efficiency of generator, upgrade transmission line and transformers to reduce losses, upgrade steam boil
5、er for greater efficiency,Fuel Switching Example: Replace coal boilers with gas-fired units, use biofuels instead of diesel. (* NOT nuclear!),Energy Efficiency (EE) projects usually reduce the energy demand per unit of output and thus offer other benefits of cost saving and production efficiency EE
6、projects for CDM can involve either upgraded or new equipment CDM Transaction costs are high so often need to group many projects under one CDM project to make viable EE projects are difficult to baseline, monitor + verify, and special guidelines have been produced to assist calculation Must first e
7、stablish Emissions Baseline the greenhouse emissions which would have occurred in business as usual, ie: if the CDM project was not done. Small projects (up to 15MW generation capacity or 15GWh/yr of equivalent energy savings) have special simplified rules and calculations,Energy Efficiency CDM Cons
8、iderations (2),Monitoring and Verification need to prove that savings are real throughout the project This can be difficult and costly, especially when many emission sources are involved (easier on single large projects where performance can be measured directly) THUS vital for effective training an
9、d management of operators (includes ensuring that operation manuals for new equipment are provided in Khmer language) Emissions Leakage refers to situation where old replaced equipment is sold to someone who uses it elsewhere resulting increased emissions elsewhere (so it reduces the overall effecti
10、veness of project).,Energy Efficiency CDM Considerations (3),Energy Efficiency - International Case Study Bangladeshi Brick Kilns,Project 20 new Brick Kilns Higher efficiency than standard kilns (new “Hoffman” design) Uses natural gas rather than coal,Project Partners,Baseline assumes most likely sc
11、enario for brick production over next 10 yrs in Bangladesh Monitoring will involve metering of actual gas consumption + calculation of brick production,Kiln Owners 20 various companies,CDM Investor,Could be: Owners Association NGO Private Business,(in Developed Country),CDM Operator (organise CDM fi
12、nancing + deliver CERs to Investor),$,$,CERs,CERs,Energy Efficiency - International Case Study Brick Kilns in Bangladesh,Energy Efficiency - Cambodian Opportunities (1),Breweries and Bottling Distillery (cassava?) Water Purification Laundries Brick Kiln Garment Factories Rice Mills Sugar Refinery Fo
13、od Processing,Industrial Sector types of operators,Animal Feed Factory Plywood Manufacturing Cement Works (?) Paper Mill Sewerage Pumping Cigarette Factories Plastics manufacturer Galvanized Iron Roofing Paint Factory,Opportunities Industrial Sector Lighting improve design (new fittings + reflectors
14、), new technology (tri-phosphor fluorescents, high pressure sodium), control (timers, sensors), skylights + light wells/shelves Boilers improved design, insulate ducting, steam traps, heat recovery to pre-heat feed water Refrigeration new refrigerants + lubricants, optimise settings, controls (timer
15、s, sensors), duct layout + zoning, new technology Compressed Air leak stop program (must be ongoing), efficient nozzles, unit sizing, optimise control (staging, timers, variable speeds etc), position intake for cool air Electric Motors replace with high efficiency motors, variable speed drives, opti
16、mise control (timers, sensors, idle shut-off),Energy Efficiency - Cambodian Opportunities (2),Energy Efficiency - Cambodian Opportunities (3),Hospitals Hotels Banks Office Buildings Government Offices Warehouses Restaurants Markets and Shops Schools,Opportunities Building Design orientation + exteri
17、or awnings + facades + landscaping to reduce solar gain, insulation, natural lighting, natural ventilation, building materials to reduce air-con load, interior colours to reduce lighting load, double-glazed windows, air-locks + air curtains + revolving doors to minimise air leaks Lighting improve de
18、sign, new technology (fittings + reflectors, low-energy ballasts, dimmable fluorescents), automate control (timers, sensors), zoning Water Heating centralised units, solar and gas rather than electric, heat pumps, insulate ducting, heat recovery from air-con, reduce water use (efficient nozzles, tap
19、s, showers), optimise settings (reduce temp) Air Conditioning new refrigerants + lubricants, optimise settings, controls (timers, sensors), duct layout + zoning, new technology, avoid individual control-setting, ceiling fans where possible,Commercial Buildings,Energy Efficiency - Cambodian Opportuni
20、ties (4),Cogeneration (or “Combined Heat and Power”(CHP),Anywhere with both electrical and heating or cooling needs Especially: industrial plants and commercial buildings Service can be offered by existing IPP (delivers electricity AND steam / cool air!) Scenario 1: Garment Factory Electricity gener
21、ated by on-site diesel generators Modified so hot water recovered directly from water jacket” or heat exchangers to pre-heat the factory boilers Big saving in energy costs and emissions from coal-fired boilers Scenario 2: Commercial Building Electricity generated by on-site diesel generator Air cond
22、itioning compressors driven directly by second shaft on diesel engine OR: absorption chillers use the recovered heat from engines (as above) to generate cool air,Energy Efficiency - Cambodian Opportunities (5),Houses Apartment Blocks Rural cottages,Opportunities Building Design orientation + exterio
23、r awnings + facades + landscaping to reduce solar gain, natural lighting, natural ventilation (flow-through, heat exhausts), building materials to reduce cooling load Cooking gas cooking if possible, efficient wood + coal stove designs, area with good ventilation + separate from living areas (to avo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CDMCONSIDERATIONSANDOPPORTUNITIESINCAMBODIAENERGYPPT

链接地址:http://www.mydoc123.com/p-379397.html