1、中级系统集成项目管理工程师-专业英语(二)及答案解析(总分:112.00,做题时间:90 分钟)一、B单项选择题/B(总题数:2,分数:112.00)Estimating schedule activity costs involves developing an _ of the cost of the resources needed to complete each schedule activity. Cost estimating includes identifying and considering various costing alternatives, for exampl
2、e, in mostapplication areas, additional work during a design phase is widely held to have the potential for reducing the cost of the execution phase and product oprations, the cost estimating process considers whether the expected savings can offset the cost of the additional design work. cost estma
3、tes are generally expressed in units of _ to facilitate comparisons both within and across projects, the _ describes important information about project requirement that is considered duing cost estimating.(分数:82.00)(1). A. accuracy B. approximation C. specification D. summary(分数:2.00)A.B.C.D.(2). A
4、. activity B. work C. currency D. time(分数:2.00)A.B.C.D.(3). A. project scope statement B. statement of work C. project management plan D. project policy(分数:2.00)A.B.C.D.(4).The _ technique involves using project characteristics in a mathematical model to predict total project cost. models can be sim
5、ple or complex. A. reserve analysis B. cost aggregation C. parametric estimating D. funding limit reconciliarion(分数:2.00)A.B.C.D.(5)._ involves comparing actual or planned project practices to those of other projects to generate ideas for improvement and to provide a basis by which to measure perfor
6、mance. These other projects can be within the performing organization or outside of it, and can be within the same or in another application area. A. Metrics B. Measurement C. Benchmarking D. Baseline(分数:2.00)A.B.C.D.(6)._ is the budgeted amount for the work actually completed on the schedule activi
7、ty or WBS component during a given time period. A. Planned value B. Actual cost C. Earned value D. Cost variance(分数:2.00)A.B.C.D.(7).Estimating schedule activity costs involves developing an _ of the cost of the resources needed to complete each schedule activity. A. accuracy B. approximation C. spe
8、cification D. summary(分数:2.00)A.B.C.D.(8).In approximating costs, the estimator considers the possible causes of variation of the cost estimates, including _. A. budget B. risk C. plan D. contract(分数:2.00)A.B.C.D.(9)._ is one of the quality planning outputs. A. Scope base line B. Cost of quality C.
9、Product specification D. Quality checklist(分数:2.00)A.B.C.D.(10)._ is the apptication of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements. A. Quality assurance (QA) B. Quality planning C. Quality control (QC) D. Quality costs(分数:2
10、.00)A.B.C.D.(11).Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes. _ are the techniques and tools in performing quality control.Statistical sampling Run chart Control chartsCritic
11、al Path Method Pareto chart Cause and effect diagrams A. B. C. D. (分数:2.00)A.B.C.D.(12).Plan Quality is the process of identifying quality requirements and standards for the project and product, and documenting how the project will demonstrate compliance. _ is a method that analyze all the costs inc
12、urred over the life of the product by investment in preventing nonconformance to requirements, appraising the product or service for conformance to requirement, and failing to meet requirements. A. Cost-Benefit analysis B. Control charts C. Quality function deployment D. Cost of quality analysis(分数:
13、2.00)A.B.C.D.(13).Project Quality Management must address the management of the project and the _ of the project, while Project Quality Management applies to all projects, regardless of the nature of their product, product quality measures and techniques are specific to the particular type of produc
14、t produced by the project. A. performance B. process C. product D. object(分数:2.00)A.B.C.D.(14).Project Quality Management processes include all the activities of the _ that determine quality policies, objectives and responsibilities so that the project will satisfy the needs for which it was underta
15、ken. A. performing organization B. project management team C. project D. customer(分数:2.00)A.B.C.D.(15).The project team members should also be aware of one of the fundamental tenets of modem quality management: quality is planned, designed and built in, not _. A. check-in B. inspected in C. executed
16、 in D. look-in(分数:2.00)A.B.C.D.(16).The project _ is a key input to quality planning since it documents major project deliverables, the project objectives that serve to define important stakeholder requirements, thresholds, and acceptance criteria. A. work performance information B. change requests
17、C. scope statement D. process analysis(分数:2.00)A.B.C.D.(17)._ involves using mathematical techniques to forecast future outcomes based on historical results. A. Trend analysis B. Quality audit C. Defect repair review D. Flowcharting(分数:2.00)A.B.C.D.(18).Performing _ involves monitoring specific proj
18、ect results to determine if they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory results. A. quality planning B. quality assurance C. quality performance D. quality control(分数:2.00)A.B.C.D.(19).Results of quality control measurement are used _. A. As
19、 an input to quality planning B. To prepare a control chart C. As an input to quality assurance D. To prepare an operational definition(分数:2.00)A.B.C.D.(20)._ is responsible for the attraction, selection, training, assessment, and rewarding of employees, while also overseeing organizational leadersh
20、ip and culture, and ensuring compliance with employment and labor laws. A. Human resource management B. Strategic analysis C. Team management D. RACI(分数:2.00)A.B.C.D.(21)._ are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of
21、project execution or project completion. A. Project manager B. Project stakeholders C. Sponsor D. Project team member(分数:2.00)A.B.C.D.(22).The project manager must maintain an effective communication link with the customers satisfaction with the progress of the project. The project manager maintains
22、 this link through _. A. periodic project reports, periodic visits to the customer, and telephonic exchanges B. subordinates, project team members, and the project sponsor C. one-time reports, weekly reports, and monthly reports D. the telephone, facsimile, and data transmission(分数:2.00)A.B.C.D.(23)
23、.A project manager is called to an informal meeting with the customer and a problem is raised. This problem has major implications for the project managers company, but the customer wants to pursue a solution at the meeting, because The project manager should _. A. tell the customer that he will not
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 中级 系统集成 项目 管理 工程师 专业 英语 答案 解析 DOC