【计算机类职业资格】PMP资格认证考试-项目质量管理及答案解析.doc
《【计算机类职业资格】PMP资格认证考试-项目质量管理及答案解析.doc》由会员分享,可在线阅读,更多相关《【计算机类职业资格】PMP资格认证考试-项目质量管理及答案解析.doc(18页珍藏版)》请在麦多课文档分享上搜索。
1、PMP 资格认证考试-项目质量管理及答案解析(总分:50.00,做题时间:90 分钟)一、B单项选择题/B(总题数:50,分数:50.00)1.In your project, you are in the process of determining whether the activities being done as part of your project comply with organizational and project policies. This will be done as part of _ .(分数:1.00)A.inspectionB.quality aud
2、itC.quality improvementD.trend analysis2.Since your quality process was not up to the four sigma requirements desired by your customer, some of your products were rejected, and there is a potential that you would not get repeat business from the same customer. From a quality perspective. the costs a
3、ssociated with your products being rejected can also be categorized as _ .(分数:1.00)A.cost of conformanceB.customer retention costsC.failure costsD.performance cost3.Your company deals with manufacturing bearings for the automobile industry. You already have historical information about the errors an
4、d defects that have been identified and you would like to use this information to determine future performance. An appropriate tool which you can use is _ .(分数:1.00)A.scatter diagramB.statistical samplingC.control chartD.trend analysis4.Determining and delivering the required levels of quality is th
5、e responsibility of_.(分数:1.00)A.project sponsorB.project manager/project management teamC.project teamD.all stakeholders in the project5.Quality _ is the application of planned, systematic quality activities to ensure that the project will employ all processes needed to meet requirements.(分数:1.00)A.
6、planningB.assuranceC.improvementD.benchmarking6.When it appears that a design error will interfere with meeting technical performance objectives, the PREFERRED response is to _ .(分数:1.00)A.decrease the performance value to equal the assessed valueB.develop alternative solutions to the problemC.incre
7、ase the specified value to set a new performance goalD.reduce the overall technical complexity of the project7.The project team has added some additional functionality which was not required as part of the project. However the customer is satisfied with the project. From a quality perspective, _ .(分
8、数:1.00)A.this is high quality because it exceeded customer expectationsB.this is not acceptable quality because gold plating was done which is not advisableC.this will mean repeat business from the same customerD.none of the above8.Identifying which quality standards are relevant to the project and
9、determining how to satisfy them should be addressed during _ .(分数:1.00)A.the conceptual phaseB.the planning processC.project implementationD.risk identification9.A control chart has all of the following characteristics EXCEPT:(分数:1.00)A.It illustrates how a process behaves over timB.It is used to de
10、termine whether or not a process is stable or has predictable performancC.It illustrates how various factors might be linked to potential problems or effectD.It can be used to monitor any type of output variabl10.Quality costs include all of the following EXCEPT _ .(分数:1.00)A.appraisalB.preventionC.
11、external failureD.computer operations11.In quality planning:(分数:1.00)A.The primary benefit of meeting quality requirements is the reduced expense associated with project quality management activitieB.Cost-benefits tradeoffs must be considereC.The primary cost of meeting quality requirements is incre
12、ased reworD.Benefits cannot be evaluated in relation to cost12.After project control, organizational process assets are updated. Wherever checklists are used, the completed checklists should become part of the _ .(分数:1.00)A.projects recordsB.project filesC.project quality management planD.lessons le
13、arned documentation13.You are the project manager for a manufacturing company involved with making components for Internal Combustion Engines required for the automobile industry. In the past couple of days, there have been too many defects, and you would like to find out whether unusual events are
14、occurring in your manufacturing process whose causes must be identified and corrected. For this purpose, you should use _ .(分数:1.00)A.inspectionB.Pareto chartsC.statistical samplingD.control charts14.All of the following represent, or result from, the primary benefit of meeting quality requirements
15、EXCEPT _ .(分数:1.00)A.less reworkB.higher productivityC.lower costsD.fewer change orders15.Quality control involves monitoring specific project results to determine if they comply with relevant quality standards. To evaluate quality control outputs, the project team should definitely have a working k
16、nowledge of _ .(分数:1.00)A.prevention and inspectionB.sampling and probabilityC.special causes and random causesD.tolerances and control limits16.As part of the quality audit, the scope statement is checked against the work results to ensure the conformance to the customer requirements. The results s
17、hould be documented and used for _ .(分数:1.00)A.estimating future projectsB.changing the project scopeC.defining future project tasksD.validating the quality process17.The use of quality management processes and activities aims to provide a higher degree of _ .(分数:1.00)A.needs satisfactionB.process c
18、apabilityC.product improvementD.project team performance18.All of the following are true quality statements except:(分数:1.00)A.Quality improvement depends upon better definition and increased awareness of the requirements/specificationB.Project quality management must address both management of the p
19、roject and the product of the projecC.Recognition of key actions required of each team member is necessary to meet quality objectiveD.Computer aided design systems can improve quality, but only at the expense of an increase in the cost of desig19.If two events can not both occur in a single trial, t
20、hey are _ .(分数:1.00)A.false eventsB.mutually exclusiveC.statistically independentD.just in time20.Quality and grade are not the same. A fundamental distinction is that _ .(分数:1.00)A.grade is a category assigned to products or services having the same functional us but different technical characteris
21、ticsB.low quality may not be a problem; low grade is always a problemC.determining and delivering the required levels of quality are not included in the responsibilities of the project manager and the project teamD.determining and delivering the required levels of grade are not included in the respo
22、nsibilities of die project manager and the project team21.Investment in product quality improvement, especially defect prevention and appraisal, can often be borne by _ .(分数:1.00)A.the organizationB.the project management teamC.executive managementD.the project22.The primary driver behind the demand
23、 for continual quality improvement is _ .(分数:1.00)A.an increase in the number of the projects being workedB.widespread public interest in government cost improvement reportsC.the prevalence of media reports on quality circles and other quality improvementD.the need to reduce the cost and ensure the
24、performance of products23.Which of the following is not considered a cost of nonconformance to quality?(分数:1.00)A.ScraB.ReworC.ExpeditinD.Process contro24.What is the meaning of upper control limit and lower control limit in control charts?(分数:1.00)A.Specification limitB.Acceptable range of the vari
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 PMP 资格 认证 考试 项目 质量管理 答案 解析 DOC
