VA 23 09 11-2010 INSTRUMENTATION AND CONTROL FOR BOILER PLANT.pdf
《VA 23 09 11-2010 INSTRUMENTATION AND CONTROL FOR BOILER PLANT.pdf》由会员分享,可在线阅读,更多相关《VA 23 09 11-2010 INSTRUMENTATION AND CONTROL FOR BOILER PLANT.pdf(74页珍藏版)》请在麦多课文档分享上搜索。
1、11-10 23 09 11 - 1 SECTION 23 09 11 INSTRUMENTATION AND CONTROL FOR BOILER PLANT SPEC WRITER NOTES: 1. Delete between /-/ if not applicable to project and delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this section are gage
2、pressure unless otherwise noted. 3. Specification requirements are based on single burner boilers that operate on natural gas and/or fuel oil. PART 1 GENERAL: 1.1 DESCRIPTION: Automatic controls, instruments, monitoring and data management systems and accessories for the boilers, burners and other b
3、oiler plant mechanical equipment. The specification classifies the systems into automatic boiler and burner control systems, burner management systems (flame safeguard), and data management and instrumentation systems. 1.2 RELATED WORK: A. Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GEN
4、ERATIONB. Section 23 05 51, NOISE and VIBRATION CONTROL FOR BOILER PLANT. B. Section 23 21 11, BOILER PLANT PIPING SYSTEMS: Piping for controls and instrumentation panel. C. Section 23 52 39, FIRE-TUBE BOILERS: Feedwater controls and instrumentation furnished with fire tube boilers. D. Section 23 52
5、 33, WATER-TUBE BOILERS: Instrumentation furnished with water tube boilers. E. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT: Air compressors and accessories for pneumatic control. F. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT Automatic controls for water level in the feedwater deaera
6、tor storage tank and the condensate storage tank. G. Section 23 10 00, FACILITY FUEL SYSTEMS: Tank level monitors and leak detection systems for oil tanks and underground oil piping systems (diesel fuel, burner fuel). H. Section 23 08 11, DEMONSTRATIONS and TESTS FOR BOILER PLANT. I. Section 26 29 1
7、1, LOW-VOLTAGE MOTOR STARTERS. J. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS. Requirements for commissioning, systems readiness checklists, and training Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 23 09 11 - 2 1.3 QUALITY ASSURANCE: A.
8、 The boiler and burner control, monitoring, data gathering, instrumentation and associated systems specified in this section shall be provided by one company that has been in business at least three years engineering, designing and servicing industrial and institutional boiler control and instrument
9、ation systems similar to those specified herein, as a primary business. That company shall furnish all components and provide complete calibration, programming, start-up, testing, demonstrations, instructions and training services. B. Submit documented evidence, including start-up and acceptance tes
10、t data, and references, that the company has performed satisfactory work on at least six systems similar to those specified. For instance, submit experience information on systems involving parallel positioning combustion control and on variable speed forced draft fan drives, if these systems are sp
11、ecified. C. If new burners are part of the contract, the burner manufacturer shall be responsible for the burner management system (flame safeguard), including interlocks, all accessories and for coordination with other control and monitoring systems. D. Equipment Experience Requirements: Refer to S
12、ection 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION. E. Code Approval: 1. All burner management and combustion control systems and devices shall comply with NFPA 85. Locations and arrangements of safety devices on fuel trains shall comply with diagrams included in “Annex A” in the cod
13、e. 2. All burner management controls and interlock devices shall be UL listed and FM approved. All controllers that include burner management functions shall be UL listed and FM approved. 3. Parallel positioning combustion control systems shall comply with UL 1998. 4. Computer-based electronic equip
14、ment shall conform to the requirements of FCC Part 15, Subpart J, for Class A computing devices governing radio frequency electromagnetic interference (EMI) while continuing to operate normally. 5. All electrical wiring shall be in accordance with NFPA 70. F. Personnel: All work shall be done by pro
15、perly trained, skilled technicians who are regularly employed and qualified in the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 23 09 11 - 3 installation, programming, start-up, calibration, and testing of the systems provided, and who will
16、be directed by experienced engineers employed by the equipment supplier. Personnel must have three years minimum experience with industrial and institutional boiler plant controls and instruments similar to those being furnished for this project. 1.4 SUBMITTALS: A. Submit in accordance with Section
17、01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES. B. Certificates of compliance with Article, QUALITY ASSURANCE (Articles 1.3.A, B, D refer to paragraph below. b. Provide separate dedicated controllers for each boiler and for the master steam pressure control. Fuel/air control loops, including flu
18、e gas recirculation (FGR) and oxygen trim may be incorporated into one station for each boiler. Boiler/economizer outlet draft and boiler water level control shall have separate stations for each item on each boiler. /All control items for one boiler may be shown on one touchscreen./ SPEC WRITER NOT
19、E: The requirement for VFDs is the option of the VAMC based on cost effectiveness. c. Variable frequency drives on forced draft fan motors. 5. Refer to the paragraphs which follow for complete detailed requirements. 6. Refer to Par. 2.2 for burner management controls. SPEC WRITER NOTES: 1. The contr
20、ollers specified are non-proprietary. These controllers, when they become obsolete, often can be replaced by those of another manufacturer and can be serviced by any properly trained controls technician. 2. The system specified is a separate control “platform” from the burner management system. This
21、 simplifies the control arrangement, servicing, and testing. B. Controllers: Multiple-loop programmable microprocessor or programmable logic (PLC) proportional-integral-differential (PID) solid state electronic controllers shall control all functions except burner management. 1. Accuracy: 0.1% analo
22、g inputs and outputs. 2. Resolution: 16 bit input and output. 3. Environment: 0 to 50 degrees C, 15% to 95% RH, non-condensing. 4. As a minimum, each controller shall have capability for four analog and four digital inputs, two analog and four digital outputs, and two PID loops. Provided by IHSNot f
23、or ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 23 09 11 - 8 5. Memory retention for twelve months minimum for power failure or for storage as spare parts. 6. Membrane push buttons with tactile feedback. 7. Displays shall be a combination of English language, colo
24、r graphics, and digital with 0.5 percent resolution, visible from wide angle. 8. Bumpless manual/automatic transfer. 9. High and low alarms for all inputs. 10. Programming: Controllers shall have capability for quick (5 - 10 minutes) reloading of memory by operating personnel upon memory loss. Provi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2309112010INSTRUMENTATIONANDCONTROLFORBOILERPLANTPDF

链接地址:http://www.mydoc123.com/p-1074906.html