1、11-10 23 08 11 - 1 SECTION 23 08 11 DEMONSTRATIONS AND TESTS FOR BOILER PLANT PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Procedures for on-site demonstration and testing of equipment and systems, including temporary facilities. B. Instruction of Government operating personnel. C. All demonstratio
2、ns, instructions and testing must be completed prior to Government acceptance for beneficial use. D. Plumbing and emergency power systems are not included. 1.2 DEFINITIONS A. Start-Up: Initial inspection, cleaning, lubrication, adjustment, and operation of equipment and systems by the contractor wit
3、h the assistance of the representatives of the equipment manufacturers. B. Pre-Tests: The final stage of the start-up procedure. This occurs after all adjustments have been made except for minor fine-tuning that can be done during the pre-test. Serves as verification that the systems are ready for t
4、he final test. Witnessing of pre-test by Resident Engineer (RE) is not required. C. Final Tests: Tests, witnessed by the RE/COTR or their representative, which demonstrate that all equipment and systems are in compliance with requirements. At VA expense, VA may utilize the services of an independent
5、 testing organization or consultant to witness the tests. 1.3 RELATED REQUIREMENTS A. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION: Operating and maintenance manuals B. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION: Demonstration, instruct
6、ions and testing of temporary equipment C. Section 23 05 51, NOISE and VIBRATION CONTROL FOR BOILER PLANT: Sound and vibration levels; sound tests and vibration testing of rotating equipment D. Section 23 21 11, BOILER PLANT PIPING SYSTEMS: Leak testing of piping systems, pressure testing of non-boi
7、ler safety valves E. Section 23 10 00, FACILITY FUEL SYSTEMS: Leak testing of oil tanks and underground oil piping systems F. Section 23 52 39, FIRE-TUBE BOILERS: Demonstration and testing of fire tube boilers, burners, controls and accessories G. Section 23 52 33, WATER-TUBE BOILERS: Demonstration
8、and testing of water tube boilers, burners, controls and accessories Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-11-10 23 08 11 - 2 H. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT: Demonstration and testing of feedwater deaerator I. Sectio
9、n 23 09 11, INSTRUMENTATION and CONTROL FOR BOILER PLANT: Demonstration and testing of boiler plant instrumentation, controls and computer work station J. Section 23 08 00 COMMISSIONING OF HVAC SYSTEMS: Requirements for commissioning, systems readiness checklists, and training 1.4 QUALITY ASSURANCE
10、A. Experienced, trained technical service personnel who are representatives of the equipment manufacturers and system designers shall demonstrate, provide instructions, pre-test and final test, as specified, the following equipment: 1. Boilers and economizers 2. Burners 3. Control systems. 4. Instru
11、mentation. 5. Deaerating feedwater heater /6. Steam turbines/ B. Experienced technicians shall demonstrate and provide instructions on the following equipment: 1. Pumps and piping systems 2. Ventilation and heating systems 3. Compressed air systems 4. Control and safety valves C. The person responsi
12、ble for programming the computer workstation shall demonstrate and provide instructions on hardware, software and programming. D. The RE, upon request, will provide a list of personnel to receive instructions and will coordinate their attendance at agreed-upon times. E. All safety devices shall comp
13、ly with the VHA Boiler Plant Safety Manual. 1.5 SUBMITTALS A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Names and qualifications of personnel performing demonstrations, instructions and tests. C. Certification that pre-testing is complete. Copies of boi
14、ler-burner and feedwater deaerator pre-test data as specified. D. Preliminary schedule of all demonstrations, instructions and final tests two weeks prior to proposed dates. E. Provide reports within three weeks after satisfactory completion of demonstrations, instructions, and tests. List date, typ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2308112010DEMONSTRATIONSANDTESTSFORBOILERPLANTPDF

链接地址:http://www.mydoc123.com/p-1074905.html