1、05-11 23 07 11 - 1 SECTION 23 07 11 HVAC AND BOILER PLANT INSULATION SPEC WRITER NOTE: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. References to pressures in this Section are gage pressure unle
2、ss otherwise noted. Designer Note: This specification has links connected to 0ther documents in VA “Technical Information Library (TIL).” These links provide the designer with easy access to these documents while editing this specification. These links must be deleted before the specification is fin
3、alized for a particular project. To delete these links make sure macros are installed on your system, and if not do the following: Click on Tools. Go to Macro and click on Security. Check the Medium Security Level. Close the specification, if open. Open the specification (again) and follow the promp
4、ts on the screen. Click on Enable Macros when first prompt appears. Delete the links only if specification is ready to be included in the project. PART 1 - GENERAL 1.1 DESCRIPTION A. Field applied insulation for thermal efficiency and condensation control for 1. HVAC piping, ductwork and equipment.
5、/2. Boiler plant mechanical systems including burner fuel oil storage and handling facilities but excluding outside steam distribution./ /3. Re-insulation of HVAC piping, ductwork and equipment, plumbing piping and equipment and boiler plant piping, breeching and stacks and equipment after asbestos
6、abatement./ B. Definitions 1. ASJ: All service jacket, white finish facing or jacket. 2. Air conditioned space: Space having air temperature and/or humidity controlled by mechanical equipment. 3. Cold: Equipment, ductwork or piping handling media at design temperature of 16 degrees C (60 degrees F)
7、or below. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 07 11 - 2 4. Concealed: Ductwork and piping above ceilings and in chases, /interstitial space, / and pipe spaces. 5. Exposed: Piping, ductwork, and equipment exposed to view in finish
8、ed areas including mechanical/, Boiler Plant/ and electrical equipment rooms or exposed to outdoor weather. Attics and crawl spaces where air handling units are located are considered to be mechanical rooms. Shafts, chases, /interstitial spaces, / unfinished attics, crawl spaces and pipe basements a
9、re not considered finished areas. 6. FSK: Foil-scrim-kraft facing. 7. Hot: HVAC Ductwork handling air at design temperature above 16 degrees C (60 degrees F);HVAC equipment or piping handling media above 41 degrees C (105 degrees F)/; Boiler Plant breechings and stack temperature range 150-370 degre
10、es C(300-700 degrees F) and piping media and equipment 32 to 230 degrees C(90 to 450 degrees F)/. 8. Density: kg/m3 - kilograms per cubic meter (Pcf - pounds per cubic foot). 9. Runouts: Branch pipe connections up to 25-mm (one-inch) nominal size to fan coil units or reheat coils for terminal units.
11、 10. Thermal conductance: Heat flow rate through materials. a. Flat surface: Watt per square meter (BTU per hour per square foot). b. Pipe or Cylinder: Watt per square meter (BTU per hour per linear foot). 11. Thermal Conductivity (k): Watt per meter, per degree C (BTU per inch thickness, per hour,
12、per square foot, per degree F temperature difference). 12. Vapor Retarder (Vapor Barrier): A material which retards the transmission (migration) of water vapor. Performance of the vapor retarder is rated in terms of permeance (perms). For the purpose of this specification, vapor retarders shall have
13、 a maximum published permeance of 0.1 perms and vapor barriers shall have a maximum published permeance of 0.001 perms. 13. HPS: High pressure steam (415 kPa 60 psig and above). 14. HPR: High pressure steam condensate return. 15. MPS: Medium pressure steam (110 kPa 16 psig thru 414 kPa 59 psig. Prov
14、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 07 11 - 3 16. MPR: Medium pressure steam condensate return. 17. LPS: Low pressure steam (103 kPa 15 psig and below). 18. LPR: Low pressure steam condensate gravity return. 19. PC: Pumped condensate
15、. 20. HWH: Hot water heating supply. 21. HWHR: Hot water heating return. 22. GH: Hot glycol-water heating supply. 23. GHR: Hot glycol-water heating return. 24. FWPD: Feedwater pump discharge. 25. FWPS: Feedwater pump suction. 26. CTPD: Condensate transfer pump discharge. 27. CTPS: Condensate transfe
16、r pump suction. 28. VR: Vacuum condensate return. 29. CPD: Condensate pump discharge. 30. R: Pump recirculation. 31. FOS: Fuel oil supply. 32. FOR: Fuel oil return. 33. CW: Cold water. 34. SW: Soft water. 35. HW: Hot water. 36. CH: Chilled water supply. 37. CHR: Chilled water return. 38. GC: Chilled
17、 glycol-water supply. 39. GCR: Chilled glycol-water return. 40. RS: Refrigerant suction. 41. PVDC: Polyvinylidene chloride vapor retarder jacketing, white. 1.2 RELATED WORK /A. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT: Insulation containing asbestos material. / /B. Section 02 82 13.13, GLOVE
18、BAG ASBESTOS ABATEMENT: Insulation containing asbestos material. / C. Section 07 84 00, FIRESTOPPING: Mineral fiber and bond breaker behind sealant. /D. Section 11 41 21, WALK-IN COOLERS and FREEZERS: Insulation used in refrigerators and freezers. / E. Section 23 05 11, COMMON WORK RESULTS FOR HVAC:
19、 General mechanical requirements and items, which are common to more than one section of Division 23. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 07 11 - 4 /F. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION:
20、General requirements pertaining to mechanical Boiler Plant work. / G. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT /H. Section 23 21 11, BOILER PLANT PIPING SYSTEMS: Boiler plant piping. / I. Section 23 21 23, HYDRONIC PUMPS J. Section 23 22 13, STEAM and CONDENSATE HE
21、ATING PIPING K. Section 23 22 23, STEAM CONDENSATE PUMPS L. Section 23 50 11, BOILER PLANT MECHANICAL EQUIPMENT M. Section 23 51 00, BREECHINGS, CHIMNEYS, and STACKS N. Section 23 64 00, PACKAGED WATER CHILLERS: Compressor, evaporator and piping. O. Section 23 23 00, REFRIGERANT PIPING: Requirements
22、 for refrigerant piping and fittings. P. Section 23 21 13, HYDRONIC PIPING and Section 23 22 13, STEAM and CONDENSATE HEATING PIPING: Piping and equipment. Q. Section 23 21 13, HYDRONIC PIPING: Hot water, chilled water, and glycol piping. R. Section 23 31 00, HVAC DUCTS AND CASINGS: Ductwork, plenum
23、 and fittings. S. Section 26 32 13, ENGINE GENERATORS: Exhaust stacks and muffler. T. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS. Requirements for commissioning, systems readiness checklists, and training. 1.3 QUALITY ASSURANCE A. Refer to article QUALITY ASSURANCE, in Section 23 05 11, COMMON
24、WORK RESULTS FOR HVAC / and Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANT and STEAM GENERATION/. B. Criteria: 1. Comply with NFPA 90A, particularly paragraphs 4.3.3.1 through 4.3.3.6, 4.3.10.2.6, and 5.4.6.4, parts of which are quoted as follows: 4.3.3.1 Pipe insulation and coverings, duct
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2307112011HVACANDBOILERPLANTINSULATIONPDF

链接地址:http://www.mydoc123.com/p-1074903.html