1、05-11 23 05 93 - 1 SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC SPEC WRITER NOTES: 1. Delete between /-/ if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. 2. References to pressure in this section are gage
2、pressure unless otherwise noted. PART 1 - GENERAL 1.1 DESCRIPTION A. Testing, adjusting, and balancing (TAB) of heating, ventilating and air conditioning (HVAC) systems. TAB includes the following: 1. Planning systematic TAB procedures. 2. Design Review Report. 3. Systems Inspection report. 4. Duct
3、Air Leakage test report. 5. Systems Readiness Report. 6. Balancing air and water distribution systems; adjustment of total system to provide design performance; and testing performance of equipment and automatic controls. 7. Vibration and sound measurements. 8. Recording and reporting results. B. De
4、finitions: 1. Basic TAB used in this Section: Chapter 37, “Testing, Adjusting and Balancing“ of 2007 ASHRAE Handbook, “HVAC Applications“. 2. TAB: Testing, Adjusting and Balancing; the process of checking and adjusting HVAC systems to meet design objectives. 3. AABC: Associated Air Balance Council.
5、4. NEBB: National Environmental Balancing Bureau. 5. Hydronic Systems: Includes / chilled water, / condenser water, / heating hot water / and glycol-water systems. / 6. Air Systems: Includes all outside air, supply air, return air, exhaust air and relief air systems. 7. Flow rate tolerance: The allo
6、wable percentage variation, minus to plus, of actual flow rate from values (design) in the contract documents. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 05 93 - 2 1.2 RELATED WORK A. Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLA
7、NTS and STEAM GENERATION: General Mechanical Requirements. B. Section 23 05 11, COMMON WORK RESULTS FOR HVAC: General Mechanical Requirements. C. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT: Noise and Vibration Requirements. D. Section 23 07 11, HVAC, PLUMBING, AND BO
8、ILER PLANT INSULATION: Piping and Equipment Insulation. E. Section 23 64 00, PACKAGED WATER CHILLERS: Testing Refrigeration Equipment. F. Section 23 65 00, COOLING TOWERS: Cooling Tower Performance Testing. G. Section 23 36 00, AIR TERMINAL UNITS: Terminal Units Performance. H. Section 23 31 00, HVA
9、C DUCTS AND CASINGS: Duct Leakage. I. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC: Controls and Instrumentation Settings. J. Section 23 82 16, AIR COILS K. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS L. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS M. Section 23
10、 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS N. Section 23 34 00, HVAC FANS O. Section 23 21 23, HYDRONIC PUMPS P. Section 23 22 23, STEAM CONDENSATE PUMPS Q. Section 23 37 00, AIR OUTLETS AND INLETS R. Section 23 81 43, AIR-SOURCE UNITARY HEAT PUMPS S. Section 23 81 46, WATER-SOURC
11、E UNITARY HEAT PUMPS T. Section 23 21 13, HYDRONIC PIPING U. Section 23 52 33, WATER-TUBE BOILERS V. Section 23 52 39, FIRE-TUBE BOILERS W. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS. Requirements for commissioning, systems readiness checklists, and training X. Section 23 05 12 GENERAL MOTOR RE
12、QUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT 1.3 QUALITY ASSURANCE A. Refer to Articles, Quality Assurance and Submittals, in Section 23 05 11, COMMON WORK RESULTS FOR HVAC, Section 23 05 10, COMMON WORK RESULTS FOR BOILER PLANTS and STEAM GENERATION, and Section 23 08 00, COMMISSIONING OF HVA
13、C SYSTEMS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 05 93 - 3 B. Qualifications: 1. TAB Agency: The TAB agency shall be a subcontractor of the General Contractor and shall report to and be paid by the General Contractor. 2. The TAB ag
14、ency shall be either a certified member of AABC or certified by the NEBB to perform TAB service for HVAC, water balancing and vibrations and sound testing of equipment. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the agency loses subj
15、ect certification during this period, the General Contractor shall immediately notify the Resident Engineer and submit another TAB firm for approval. Any agency that has been the subject of disciplinary action by either the AABC or the NEBB within the five years preceding Contract Award shall not be
16、 eligible to perform any work related to the TAB. All work performed in this Section and in other related Sections by the TAB agency shall be considered invalid if the TAB agency loses its certification prior to Contract completion, and the successor agencys review shows unsatisfactory work performe
17、d by the predecessor agency. 3. TAB Specialist: The TAB specialist shall be either a member of AABC or an experienced technician of the Agency certified by NEBB. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the Specialist loses subject
18、 certification during this period, the General Contractor shall immediately notify the Resident Engineer and submit another TAB Specialist for approval. Any individual that has been the subject of disciplinary action by either the AABC or the NEBB within the five years preceding Contract Award shall
19、 not be eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this Section and in other related Sections performed by the TAB specialist shall be considered invalid if the TAB Specialist loses its certification prior to Contract completion and must be perfo
20、rmed by an approved successor. 4. TAB Specialist shall be identified by the General Contractor within 60 days after the notice to proceed. The TAB specialist will be coordinating, scheduling and reporting all TAB work and related activities and will provide necessary information as required by the R
21、esident Engineer. The responsibilities would specifically include: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-05-11 23 05 93 - 4 a. Shall directly supervise all TAB work. b. Shall sign the TAB reports that bear the seal of the TAB standard. The
22、reports shall be accompanied by report forms and schematic drawings required by the TAB standard, AABC or NEBB. c. Would follow all TAB work through its satisfactory completion. d. Shall provide final markings of settings of all HVAC adjustment devices. e. Permanently mark location of duct test port
23、s. 5. All TAB technicians performing actual TAB work shall be experienced and must have done satisfactory work on a minimum of 3 projects comparable in size and complexity to this project. Qualifications must be certified by the TAB agency in writing. The lead technician shall be certified by AABC o
24、r NEBB C. Test Equipment Criteria: The instrumentation shall meet the accuracy/calibration requirements established by AABC National Standards or by NEBB Procedural Standards for Testing, Adjusting and Balancing of Environmental Systems and instrument manufacturer. Provide calibration history of the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- VA2305932011TESTINGADJUSTINGANDBALANCINGFORHVACPDF

链接地址:http://www.mydoc123.com/p-1074902.html