UL SUBJECT 723S-2006 Outline of Investigation for Drop-Out Ceilings Installed Beneath Automatic Sprinklers (Issue 3)《安装在自动洒水器下的跳开式天花板调查大纲 发布编号 3》.pdf
《UL SUBJECT 723S-2006 Outline of Investigation for Drop-Out Ceilings Installed Beneath Automatic Sprinklers (Issue 3)《安装在自动洒水器下的跳开式天花板调查大纲 发布编号 3》.pdf》由会员分享,可在线阅读,更多相关《UL SUBJECT 723S-2006 Outline of Investigation for Drop-Out Ceilings Installed Beneath Automatic Sprinklers (Issue 3)《安装在自动洒水器下的跳开式天花板调查大纲 发布编号 3》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULDecember 5, 20061SUBJECT 723SOUTLINE OF INVESTIGATIONFORDROP-OUT CEILINGS INSTALLED BENEATH AUTOMATIC SPRINKLERSIssue Number: 3DECEMBER 5, 2006Summary of TopicsThis new issue of SU 723S is being
2、issued through ULs electronicpublishing system to ensure format uniformity between the PDF andHTML versions of the document. No substantive changes have beenincorporated in the document.The UL Foreword is no longer located within the UL Standard. For informationconcerning the use and application of
3、the requirements contained in thisStandard, the current version of the UL Foreword is located onULStandardsInfoNet at: http:/ 2006 UNDERWRITERS LABORATORIES INC.UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULDECEMBER 5, 2006SUBJECT 723S2No Te
4、xt on This PageUL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULCONTENTSGENERAL1 Scope .4PERFORMANCE2 General 43 Fire Exposure Test 43.1 Facilities .43.2 Control tests .53.3 Drop-out ceiling tests .53.4 Acceptance criteria .5DECEMBER 5, 2006 SU
5、BJECT 723S 3UL COPYRIGHTED MATERIAL NOT AUTHORIZED FOR FURTHER REPRODUCTION ORDISTRIBUTION WITHOUT PERMISSION FROM ULGENERAL1 Scope1.1 These requirements cover drop-out ceilings assemblies intended for installation beneath sprinklers.During fire conditions, the drop-out ceiling panels are intended t
6、o drop from their supports to expose thesprinklers to the fire.1.2 Drop-out ceilings covered by these requirements are intended to be installed in accordance withSection 4-4.16 in the Standard for the Installation of Sprinkler Systems, NFPA 13.PERFORMANCE2 General2.1 The installation of drop-out cei
7、lings shall not delay the operation time of automatic sprinklers by morethan 33-1/3 percent, compared with their operation time without the ceiling installed.3 Fire Exposure Test3.1 Facilities3.1.1 The tests are to be conducted in a room having a ceiling height of 15 feet, 9 inches. A ceiling area20
8、 by 18 feet shall be partitioned with vertical plywood baffles extending 4 feet below the ceiling. Thebaffles are to be sealed tightly at a joint. A nominal 1 inch thick (3/4 inch) wood support shall be attachedaround the inside of the baffles such that the top of the support is 2 feet below the tes
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ULSUBJECT723S2006OUTLINEOFINVESTIGATIONFORDROPOUTCEILINGSINSTALLEDBENEATHAUTOMATICSPRINKLERSISSUE3 安装

链接地址:http://www.mydoc123.com/p-1069476.html