SANS 10120-2 C-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section C Site .pdf
《SANS 10120-2 C-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section C Site .pdf》由会员分享,可在线阅读,更多相关《SANS 10120-2 C-1982 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 2 Project specification Section C Site .pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SAW 0120 : Part 2 Sect inn C-1982 Site clrarance PART 2 : PROSKCI SPECLBICATEON SECPION C CONTENTS Clause 1. 2. 3. 3.1 3.2 3.2.1 3.2.2 3.2.3 3.2.4 3.2.5
4、3.3 3.4 Pai:e Numher ESSENTLAL PROJECT SLECIPCCATION CLAUSES 1 ESSENTIAL DATA . 1 ADDITIONAL CLAIISI!S . 1 General 1 Normal Projects 1 Nois6 nuisance 1 Clearing and soil s tahilixat ion : e-lrthworks suhj ect tcr wind erosion . . . . . . . . . . . . . . . 2 Clearing and disposal hy controllecl burni
5、ng 2 Trees of borderlinr. dimensions . 3 Sportsfields, gardens, orcliards, etc 3 Subeconomic Projects . 4 Labour-Based Projects . 4 First Revision May 1982 This section of the cnde supersedcs SARS 0120 : Part 2 : Section C-1980 Approved by tlie COUIICI I. OF l7113 S(1UTII A121ZIGIW BUREAU OF SPAN1)A
6、RDS SAM 0120 : I.rt 2 Sect ion C-1982 Site clear;nce SARS 1200 C : SITE CLEARANCE a) Aumher PSC clanscs in Portion 2 of the project specification in the sequence in which the clauses to which they relate appear 111 SARS 1200 C. b) The claust? runher(s) !:1ve11 at the brginnlnp, or after th Ic!aclinp
7、, of a clause ls/are, wnlws otherwise statrd, the numher(s) oC the rclevaut clanse(s) oE SARS 1200 C. ESSENTLAL PROJECT SPEC IFICAtLON CLhIJSIIS Set out suitable clauses in Portion 2 of the project speciCicatCon provide essential Information as follow: a) (Subclauses 5.3(c), 8.2.1 and 8.2.8) State t
8、he requiredlents for the removal of any structure that cannot reasonably be demolLshed and cleared by means oE the plant specified in Sihclause 5.3(c) OF SARS 1200 C, and schedrle suitable items. b) (Subclause 5.6) Where topsoil cannot be moved clLrectly to Its Einal position or stockpiled in windro
9、ws, state how and where it is to he stnckpiled. c) (Subclause 5.7) Where applicable, designate any particular flora that are to be conserved in terms of Subclause 5.7 of SARS 1200 C. ESSENTIAL DATA The availability of certain essential data may aCfect the prices tendered. Except where such data have
10、 been given in the schedule or in the tender drawings, set out fiuitahle clauses covering items sucli as the following in Portion 2 of the project specification: a) (Subclauses 3.1 and 8.2.1) Iihen applicable, designate disposal areas on the drawings or iri a nritable project specification cl;use. b
11、) (Subclause 5.2.3.2) Where the engineer intends to designa te individual trees Eor preservation. state the penalty to be paid by the contractor if he damages or removes a designated inctividual tree. c) (Suhclause 5.4) State the requirements where the depth from the original ground level to the rxd
12、 bed or other finished surface is such that it is nucessary to remove stumps and matted roots to a depth greater than 200 mm below the cleared surf.ice before compaction. d) (Subclause 5.8) State any particular steps that must be taken to preserve adjacent structures and any particular methods of de
13、molition that will he unaccep table in part icular situat ions, e.g. blasting. e) (Subclause 8.2.3) Where the terms IJC Subclauses 8.2.1 and 8.2.2 of SARS 1200 C are tu be superseded by those of Subclause 8.2.3 set out the reasons for adopting such a method of measuriment. f) (Subclause 8.2.9) Where
14、 the locatlon of disposal sites is not at the discretion oE the contractor and action regarding disposal sites has not bern taken under Suhclause 3.1 or 8.2.1 of SARS 1200 C. provide an item in the schedtle to cover the carting of material. ADDITIONAL CI,AUSI.:S. GENERAL. Where it is necessary to am
15、plify or otherwise to vary the terms oE SARS 1200 C to render them suitable for use in projects to be carried out in particular locations or under particular circum- stances. include suitable PSC clauses in Portion 2 of the project speciEication to deal with matters in addition to those covered by C
16、lauses 1 and 2. NORMAL PROJECPS NOTE: To meet requirements imposed by various norms of economic development, projects are classif 1-d as normal, prtastige, subeconomic, and Iabour-based projects (see Clarscz 4 of Section 0 of Part 3 of the code). Noise Iluisance (Suhclanse 4.1 of SABS 1200 A). Where
17、 demolition is to take place in a built-up urban area state restricttons on the days of the week and the timr of day when work will he permitted. Tn addition, if SABS 1200 AA) forms part of the contract, include in the project specification the contents of Suhclause 4.1 of SABS 1200 111 by means of
18、a clause such as PSC 1.1 below or, if SAW 1200 Al) forms part oE the contract, draw the contractors attention to the reqttirements of that subclause by means of a clausc such as PSC 1.2 below. PSC 1.1 Noisr cnntrrs. The demo1 Lt inn required nder this Cont ract will he rep,arcli=d as t.ikLnp, place
19、in a hullt-up area, ad the Contractrs attention is dr.wn to Regt11.1tion 11 17 or Chapter 111 of the regulnt ions framed under the Factories. Machinery and Iluildinp, Work Act. 1941 (Act 22 of 1941). The Contractor shall prnvide and use suitable nrd effective silencing devices for pneumatic tools an
20、t1 other plant that would otherwlsu c.usr .an equivalent noise level excerdlng 85 dn(A) during the demolLtinns ancl associated works. Alternatively he shall, by means of barriers, eErectively isolate the source of any such noise in order to comply with the said regula t ions. PS(: 1.2 Noise control.
21、 The demolition rquired under this Contract will he rrgartlcd as takLng place in a huilt-np area and the terms OF Suhclause 4.1 or SA115 1200 A shall apply. 1) General. 2) General (smal. l works). SABS 0120 : Part 2 Section C-l982 Site clearance 3.2.2 Clearing ancl Soi l Stab l liza t inn : Kart liw
22、orks Suhj 13c t tu 14i1id Erns inn (Subclause 5.3) . Where soil stabLliaation is the mans by which it is aimed to control dust and wind-blown sand after initial site levelling and, if possil,lt., to restore n site to its original appearance, consider the inclusitn nf tlie following Subclauses PSC 2.
23、1 and PSC 2.2 or PSC 3.1-3.3: PSC 2.1 Site cle;lrance and drffit control. Site clearance covers tlie removal of a1 l debris (including itms such as old tyres and vehlcle parts), vegetation, and topsoll (together with .l1 1 roots and vegrtat Lnn) down tn a mLnLmwn 11cpth nf 150 mm. 1)rhris tlmt canno
24、t be convurtt4 lntt mulch (See PSC 2.2) sliall he hnried Ln areas designated hy tlie Engineer and in an approved mannrr or, if no such areas are designated, removed frnm tlie Site to the rubbish dwnp of tlie nearest local authority under arrangements made 11y the Contractor. The hulk eartliworks sha
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101202C1982CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART2PROJECTSPECIFICATIONSECTIONCSITEPDF

链接地址:http://www.mydoc123.com/p-1028474.html