REG NASA-LLIS-0421-1996 Lessons Learned Voyager II Instrument Boom Deployment Anomaly (1977).pdf
《REG NASA-LLIS-0421-1996 Lessons Learned Voyager II Instrument Boom Deployment Anomaly (1977).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0421-1996 Lessons Learned Voyager II Instrument Boom Deployment Anomaly (1977).pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0421Lesson Info:a71 Lesson Number: 0421a71 Lesson Date: 1996-07-08a71 Submitting Organization: JPLa71 Submitted by: J.A. RobertsSubject: Voyager II Instrument Boom Deployment Anomaly (1977) Abstract: The Voyager II Science Boom failed to indicate, by microswitch, that it had d
2、eployed completely. The design of deployment mechanisms should consider susceptibility to jamming by foreign objects. Deployment clearance verification testing should be repeated if any related changes are incorporated.Description of Driving Event: (Relevant Historical Lesson(s) Learned)On August 21
3、, 1977, the Voyager II Science Boom failed to indicate, by microswitch, that it had deployed completely. Analysis of the spacecraft dynamics during jettison of the expended Solid Rocket Motor (SRM) case indicated that the science boom folding strut was not locked and that the boom momentarily refold
4、ed due to impulse from the SRM case separation. Subsequent star mapping using the scan platform-mounted TV cameras ascertained that the boom was within a tenth of a degree of the fully deployed position.Exhaustive tests were conducted to assess candidate causes. The possibilities investigated includ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS04211996LESSONSLEARNEDVOYAGERIIINSTRUMENTBOOMDEPLOYMENTANOMALY1977PDF

链接地址:http://www.mydoc123.com/p-1018068.html