REG NASA-LLIS-0229-1992 Lessons Learned - Flight Schedules.pdf
《REG NASA-LLIS-0229-1992 Lessons Learned - Flight Schedules.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0229-1992 Lessons Learned - Flight Schedules.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0229Lesson Info:a71 Lesson Number: 0229a71 Lesson Date: 1992-11-25a71 Submitting Organization: KSCa71 Submitted by: Lisa L. MusgraveSubject: Flight Schedules Description of Driving Event: The original STS operations baseline plan defined required capabilities for the STS syste
2、m before it was designed. The operational system would fly 6 flights the first year, 15 the second, 24 the third, and by the sixth year a total of 60 flights per year. To meet this flight rate, turnaround was to be completed in 14 days. The vision of the operational space shuttle was clearly much la
3、rger than the resource base eventually established to create the capability. The 1985 mission operations were successful in spite of significant remanifesting and perturbations. However, all trends prior to the STS 51-L mishap indicated that the milestones required to support preparations for the 19
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS02291992LESSONSLEARNEDFLIGHTSCHEDULESPDF

链接地址:http://www.mydoc123.com/p-1017880.html