1、*USACE / NAVFAC / AFCESA UFGS-23 81 47 (April 2008)-Preparing Activity: NAVFAC Superseding UFGS-23 81 47 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated March 2008*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONINGSECTIO
2、N 23 81 47WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS04/08PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 GROUND-LOOP HEAT PUMP SYSTEM DESIGN1.3.1 Calculations1.3.1.1 Methodology1.3.1.2 Design1.3.2 Detail Drawings1.3.3 System Diagrams1.3.4 Soil Thermal Conductivity Testing1.3.5 System Designe
3、r1.4 GROUND SOURCE HEAT PUMP INSTALLER1.5 RELATED REQUIREMENTS1.6 SUBMITTALS1.7 QUALITY ASSURANCE1.7.1 Material and Equipment Qualifications1.7.2 Alternative Qualifications1.7.3 Service Support1.7.4 Manufacturers Nameplate1.7.5 Modification of References1.7.5.1 Definitions1.7.5.2 Administrative Inte
4、rpretations1.7.6 Ground heat exchanger piping system As-Built Drawings1.7.7 System Diagrams1.7.8 Plastic Piping Heat Fusion Requirements1.7.9 Qualifications of Ground Heat Exchanger Fabricators1.7.10 Qualifications of Ground Heat Exchanger Installers1.8 DELIVERY, STORAGE, AND HANDLING1.9 SAFETY REQU
5、IREMENTS1.10 PROJECT/SITE CONDITIONS1.10.1 Verification of Dimensions1.10.2 Drawings1.10.3 Accessibility1.11 COORDINATION OF WORK AND SYSTEM PERFORMANCESECTION 23 81 47 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 2 PRODUCTS2.1 EQUIPMEN
6、T2.1.1 Water-Source Water-to-Air Heat Pumps (WAHP)2.1.2 Water-Source Water-to-Water Heat Pumps (WWHP)2.1.3 Closed Circuit Coolers2.1.4 Plate Heat Exchangers2.1.5 Pumps2.1.5.1 In-Line Pumps2.1.5.2 End Suction Water Pumps2.1.5.3 Pump field assembled factory assembledMnodules2.2 ELECTRICAL WORK2.3 ABOV
7、EGROUND PIPING SYSTEMS2.4 GROUND HEAT EXCHANGER PIPING SYSTEM2.4.1 High Density Polyethylene Pipe2.4.2 Fittings2.4.2.1 Threaded Transition Fittings2.5 PIPING ACCESSORIES2.5.1 Pipe Hangers and Supports2.5.2 Strainers2.5.3 Pressure Gages2.5.4 Pressure/Temperature Test Provisions2.5.4.1 Petes Plug2.5.4
8、.2 Testing Accessories2.5.5 Thermometers2.5.6 Flexible Pipe Connectors2.5.7 Expansion Tanks2.5.8 Air Separators2.5.9 Tracer Wire for Nonmetallic Piping2.5.10 U-Bend Assemblies2.5.11 Pipe Casings2.5.12 Building Surface Penetrations2.5.12.1 Sleeves in Masonry and Concrete2.5.12.2 Waterproof Penetratio
9、ns2.5.12.3 Fire-Rated Penetrations2.5.13 Escutcheon Plates2.6 HEAT TAPE2.6.1 Heat Tape Construction2.6.2 Electrical Accessories2.7 ACCESS DOORS FOR VALVES2.8 AUXILIARY DRAIN PAN, DRAIN CONNECTIONS, AND DRAIN LINES2.9 ANTIFREEZE PROTECTION2.9.1 Biodegradability2.9.2 Properties of the heat transfer fl
10、uid2.9.2.1 Flash Point2.9.2.2 Biological Oxygen Demand (BOD)2.9.2.3 Freezing Point2.9.2.4 Toxicity2.9.2.5 Storage Stability2.9.3 Quality2.10 CHEMICAL FEED PROVISIONS2.10.1 Aboveground Condenser Water Piping System2.10.2 Chilled/Hot Water Piping System2.10.3 Ground Heat Exchanger Piping2.11 PAINTING
11、OF NEW EQUIPMENT2.11.1 Factory Painting Systems2.11.2 Shop Painting Systems for Metal Surfaces2.12 Bentonite GroutSECTION 23 81 47 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.12.1 High Grade Bentonite Grout2.12.2 Thermally-Enhanced Benton
12、ite Grout2.12.3 Cementitious Thermally Enhanced Grout2.13 ControlsPART 3 EXECUTION3.1 INSTALLATION3.1.1 Heat Pump System3.1.2 Connections to Existing Systems3.2 ABOVEGROUND PIPING3.3 EARTHWORK3.4 GROUND HEAT EXCHANGER PIPING3.4.1 Vertical Well Fields3.4.2 Horizontal Well Fields and Header Piping3.4.
13、2.1 Piping at Building Entries3.4.3 Polyethylene Piping3.4.4 Heat Fusion Process3.4.5 Pressurizing3.4.6 Pipe Identification3.4.7 Tracer Wire3.4.8 Threaded Fittings3.5 FIELD PAINTING AND FINISHING3.6 FLUSHING AND PURGING GROUND HEAT EXCHANGER3.7 ADJUSTMENTS3.8 INSTRUCTING OPERATING PERSONNEL3.9 FIELD
14、 QUALITY CONTROL3.9.1 Piping Systems Except for Ground Heat Exchanger and Refrigerant3.9.2 Flow Test of Ground Heat Exchanger Piping3.9.3 Pressure Test of Ground Heat Exchanger Piping3.9.3.1 Hydrostatic Test3.9.4 Refrigerant Piping Pressure Test and Evacuation3.9.5 Equipment Tests3.9.5.1 Field Testi
15、ng3.9.5.2 Field Test Plans3.9.5.3 Field Test Reports3.9.6 Additional Field Testing3.9.7 Soil Thermal Conductivity Testing3.9.7.1 Soil Thermal Conductivity Testing Set-up3.9.7.2 Data Recording and sensor accuracy3.9.7.3 Test Borehole Construction3.9.8 ON-SITE TRAINING- End of Section Table of Content
16、s -SECTION 23 81 47 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA UFGS-23 81 47 (April 2008)-Preparing Activity: NAVFAC Superseding UFGS-23 81 47 (January 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in
17、agreement with UMRL dated March 2008*SECTION 23 81 47WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS04/08*NOTE: This guide specification covers the requirements for water source heat pump systems and ground source closed-loop heat pump systems.This specification is based on two contract approaches for
18、providing these systems: separate design and contractor installed systems (Design-Bid-Build) and contractor design and installed systems (Design-Build or performance based contracting). The designer selects required preference for the contract approach. Contractor design and install is limited to gr
19、ound source closed-loop heat pump systems.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, w
20、hether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended
21、 changes to a UFGS should be submitted as a Criteria Change Request (CCR).Tailoring is provided in this specification for Army, Navy, and Design-Build. The use of tailoring will remove the unwanted specific agency requirements.*SECTION 23 81 47 Page 4Provided by IHSNot for ResaleNo reproduction or n
22、etworking permitted without license from IHS-,-,-NOTES:1. There are two main types of ground source heat pump system: closed loop systems and open systems. Open systems use and dispose of ground water. There are variations of closed loop systems based on the configuration of pipe orientations. This
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS2381472008WATERLOOPANDGROUNDLOOPHEATPUMPSYSTEMS 系统 环路 接地 PDF

链接地址:http://www.mydoc123.com/p-984815.html