NAVY MIL-T-82379-1969 TRAINING SYSTEM SUBMARINE PERISCOPE GENERAL SPECIFICATION FOR《潜艇潜望镜训练辅助器材的一般规格》.pdf
《NAVY MIL-T-82379-1969 TRAINING SYSTEM SUBMARINE PERISCOPE GENERAL SPECIFICATION FOR《潜艇潜望镜训练辅助器材的一般规格》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-T-82379-1969 TRAINING SYSTEM SUBMARINE PERISCOPE GENERAL SPECIFICATION FOR《潜艇潜望镜训练辅助器材的一般规格》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-T-82379(TD) 1 April. 1969 t. MI L ITARY SPEC I FI CAT I ON TRAINING SYSTEM, SUBMARINE PERISCOPE; GENERAL SPEC1 FICATION FOR This specification has been approved by the Naval Training Devi ce Center, Department of the .Navy. 1, SCOPE design, development, fabrication and testing of a Submarine Per
2、iscope . Training System (SPTS) for integration into fixed-base Submarine Attack Center Trainers (see 6 .l) . 2. APPLICABLE DOCUMENTS -_ 1.1 This specification establishes the requirements ,for the . k 2.1 The following documents of the issue in effect on the date of invitation for bids or request f
3、or proposal, form a part of this specification to the extent specified herein: SPECIFICATIONS Mi 1 i tary- MIL-T-23991 STANDARDS Federal FED-STD-59 5 Training Devi ces, Mi 1 i tary; General Speci fi cation for Colors Mi 1 i tary MIL-STD-470 MI L - STD- 4 71 MI L-STD- 721 Maintainabi 1 i ty Program R
4、equi remnts (For Systems and Equipments) Mai n tai nabi 1 i ty Demons trat i on Definitions of Effectiveness Term for Reliability, Maintainability, Human Factors, and Safety Re1 i ab i 1 i ty Predi ct i on -. . MIL-STD-756 1-j TXIS lNlcw!Efa mmW:s A /# B the materials, parts and processes used in th
5、e design and fabrication of the submarine periscope training system (SPTS) , hereinafter referred to as the SPTS, shall be in accordance with MIL- T- 2399 1 . 3.2 Design.- Except for the “climatic conditions“ requirement, the “equipment weights“ requirement, the “surface vessel installation“ require
6、ment, and the “subiliarine installation“ requi rement; the SPTS design shall be in accordance with MIL-T-23991 and as specified in 3.2.1 through 3.2.4.1 of this specification. Description,- The SPTS shall be an operator trainer having the capability of providing training in the manual and tactical o
7、per- ation of a submarine periscope. The SPTS shall be designed for instal- lation and integration into a Submarine Attack Center Trainer such as, Device 21A37/4 at New London; Device 21A38 at Pearl Harbor; or Device 21A39 at Charleston. 3.2.1 2 *., Licensed by Information Handling ServicesMIL-T-237
8、7 67 I 977770b 0407974 1 - MIL -T-82379 (TD) . 3.2.2 Climatic conditions,- The SPTS shall withstand the following ci i hat i c con67rti os : (a) Temperature: (1) Operating 60“ to 90“ F (2) Nonoperating and storage: -10“ to t14O“F to temperature changes (b) Relative humidity - Up to 90 percent conden
9、sation due (c) Barometric pressure: (1) Operating: From 31.35 to 24.9 inches of mercury (2) Nonoperating: From 31.35 to 5.5 inches of mercury. .3,2,3 Mechani cal. - 3.2.3.1 Weight.- The SPTS shall be designed so that the distributed 3.2.3.2 Vibration and shock protection.- The SPTS shall be vibra- w
10、eight of the equipment does not exceed 250 pounds per square foot. tion isolated, to prevent transmittal of shock or vibration to the lens elements of the simulated periscope and target channels. Electronic components, chassis or cabinets that are subject to damage or other undesirable effects, such
11、 as frequency or amplitude drift or noise niodulation, shall be mounted on suitable shock or vibration absorbing devices to eliminate any adverse effects in the perfoqnance of these components or the SPTS. 3.2.4 Electrical and electronic.- 3.2.4.1 Primary power source (line voltage and frequency) .-
12、 The SPTS shall be designed to operate from 120/208 v, 60 H z, 3 phase pgwer. 3.3 Reliability.- Reliability shall be in accordance with the reliability requirements of MIL-T-23991 and as specified in 3.3.1 through 3.3.3 of this specification, maintain an effecti ve and timely re1 i abi 1 i ty progra
13、m i n accordance with MIL-STD-785, planned and developed in conjunction with all other contractor functions necessary to ensure requi red i nhewnt re1 i abi 1 i ty . 3.3.1.1 Program plan.- The contractor shall prepare a Program Plan that describes in detail the following reliability elements of MIL-
14、STD-785 considered necessary to ensure effective management of the re1 i abi 1 i ty program: 3.3.1 Reliability program.- The contractor shall establish and I 3 Licensed by Information Handling Services- -i. MIL-T-2379 b7 97779Ob 0407775 3 = MI L-T-82379 (TD) Reliability organization I Managenent and
15、 control Program review Apportionment and mathemati cal models Re1 i ab i 1 i ty predi c t i on Design revi ews Supplier and subcontractor reliability programs Maintainability Manufacturing controls and moni tori ng Failure data collection, analysis and corrective action Periodic and final reports P
16、arts reliability. The plan, as approved by the procuring activity, shall become the basis of contractual compliance. All reliability terms used by the contractor, as well as the procuring agency will be as defined in MIL-STD-721. Re1 iabi li ty predictions prepared by the contractor shall be in acco
17、rdance with MIL-STD-756. 3.3.2 Reliability goals.- The SPTS shall include all practicable Develop- features that will result in reliable and stable operation. ment procedures shall include, but not be limited to, the following: (a) Review of system requirements to establish an accurate picture of al
18、l parameters which may affect performance (b) Operational environment (c) Evaluation of proposed design to ensure that suitable features have been incorporated that will result in reliable s tab1 e equi pment operati on (d) Estimation of inherent reliability and operational reliability (e) Analysis
19、of proposed design to obtain component reliability allocation and allowable failure rates of components (f) Optimum use of redundancy techniques. 4 Licensed by Information Handling Services-_ _ -_;_ , MIL-T-82379 (TD) MIL-T-2377 b7 m 77qq70b OylJ777b 5 m The total system reliability objective shall
20、be to achieve a minimum mean-time-between-failures (MTBF) of 200 hours at the 90 percent level of statistical confidence. System and subsystem objectives shall be based on an eight hour utilization period. 3.3.3 Availability and utilization.- The SPTS shall be designed to operate with maximum availa
21、bility during a 12 hour day, 5 days per week. percent, based on the availability model as specified in the availability requirements of MIL-T-23991. The availability for a 60 hour week shall not be less than 99.7 3.4 Maintainability.- Maintainability shall be in accordance with the mai ntainabi 1 i
22、ty requi rements of MIL-T-23991 and as speci fied in 34.1 through 3.4.4 of this specification. The goals for maintainability shall be as follows: (a) Mean Corrective-Maintenance Downtime ( ment. consonance with the computing system gneerated target information. The image motion shall be smooth and w
23、tthout apparent step changes. and without apparent step changes as the periscope rotates in the clock- wise or counterclockwise direction at rates of from O to 60.degrees per second. 3.6.2.4.1 Periscope rotation.- The target track shall appear smooth . 3.6.2.4.2 Range.- Each target shall be capable
24、of being positioned anywhere within the simulated ocean area in increments of 8 yards and accurate to within plus or minus 8 yards of the computing system generated target range. from O to 360 degrees in increments of 0.05 degree and accurate to within plus or minus 0.15 degree. 3.6.2.4.4 Aspect ang
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILT823791969TRAININGSYSTEMSUBMARINEPERISCOPEGENERALSPECIFICATIONFOR 潜艇 潜望镜 训练 辅助 器材 一般 规格 PDF

链接地址:http://www.mydoc123.com/p-982902.html