NAVY MIL-R-23021 B-1969 ROCKET MOTOR MANUFACTURING INERT PARTS FOR GENERAL SPECIFICATION FOR《火箭发动机插件制造通用规范》.pdf
《NAVY MIL-R-23021 B-1969 ROCKET MOTOR MANUFACTURING INERT PARTS FOR GENERAL SPECIFICATION FOR《火箭发动机插件制造通用规范》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-23021 B-1969 ROCKET MOTOR MANUFACTURING INERT PARTS FOR GENERAL SPECIFICATION FOR《火箭发动机插件制造通用规范》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-R-23021B 13 7797906 0302777 MI L-R-23021 B (OS) 17 July 1969 SUPERSEDING MI L-R-23021 A (OS) 2 March 1967 MI LI TARY SPEC1 F I CATI O N ROCKET MOTOR, MANUFACTURING INERT PARTS FOR, GENERAL SPECIFICATION FOR This specification has been approved by Naval Ordnance Systems Command, Department of the
2、 Navy 1. SCOPE 1 .1 This specification covers the requirements for procurement of inert parts for rocket motors. For the purpose of this specification the terms unit, part, component, and inert assembly are used interchangeably. 2. APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in ef
3、fect on the date of invitation for bid or request for proposal, form a part of this specification to the extent specified herein. S PECI F I CATI O NS Mi I i tary MI L-1-6868 MI L-Q-9858 MI L-1-45208 STANDARDS MI L-STD-105 MIL-STD-129 MI L-STD-453 Inspection Process, Magnetic Partic fe Quality Progr
4、am Reqdirements Inspection System Requirements Sampling Procedures and Tables for Marking for Shipment and Storage Inspection, Radiographic Inspection by Attributes Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-R-2302LB 13 9999906 O302978 T MI
5、 L-R-23021 B (OS) PUBLICATION Bureau of Nava I Weapons WR 43 Preparation of Qual i ty Assurance Provisions (Including Classification of C ha ra c t e ris t i c s) (When requesting any of the preceding documents, give the complete title and desig- nation. Copies of this specification and other unclas
6、sified specifications, standards, and publications required by suppliers in connection with specific procurement functions should be obtained from the Commanding Officer, Naval Supply Depot (CDS) , 5801 Tabor Avenue, Philadelphia, Pennsylvania 191 20 .) 2.2 Other publications. United States Of Ameri
7、ca Standards Institute Y1 4.5 Dimensioning and Tolerancing for Eng neeri ng Drawi ngs (Application for copies should be addressed to the United States of America Standards Institute, 10 East 40th Street, New York, New York 10016). National Bureau of Standards Handbook H28 Screw Thread Standards for
8、Federal Services (Application for copies should be addressed to the Superintendent of Documents, Government Printing Office, Washington, D .C. 20402 .) 3. REQUIREMENTS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo re
9、production or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-R-23021B 13 7777706 030278L T MI L-R-23021 B (OS) 4.2.1 Serialization. The procuring activity shall assign a block of serial numbers a
10、nd an identifying supplier letter for use on the inert assembly. These numbers shall be used in sequence and shall be assigned to the assembled unit after acceptance inspec- tion, The suppliers serial number on component parts shall be recorded to indicate the unit serial number that parts were asse
11、mbled with. Unused seria! numbers shall be re- turned to the procuring activity upon completion of the contract. Parts shall be marked in a manner that will not make the parts unserviceable. 4.3 Discontinuities. Unless otherwise specified, discontinuities shall be inspecfed for in accordance with MI
12、L-1-6868. Areas inaccessible or inappropriate to magnetic particle inspection shall be radiographically inspected in accordance with MIL-STD-453 after the procuring activity has been advised of the areas requiring radiogrophic inspec- tion. 4.4 Preproduction inspection. - Fifteen preproduction units
13、, manufactured in accor- dance with 3.3, shall be submitted to the activity designated by the procuring activity for inspection. Units shull be inspected for conformance to all requirements and tested for functional characteristics including static test fihngs. Failure of any unit to meet appliccble
14、 documentation requirements may result in rejection of the preproduction sample or disqualification of the supplier. Final acceptance of the preproduction sample shall be made by the procuring activity. Further production of the unit by the supplier, prior to completion of these tests or approval by
15、 the procuring activity, shall be at the suppliers risk unless otherwise specified in the contract or order. 4.5 Production quality conformance inspection Production quality conformance inspection shall include the verification of all characteristics classified as Critical or Major. Characteristics
16、classified as Critical or Major shall not be verified by using pro- duction tooling as a mediu of inspection. 4.6 Tests. 4.6.1 Structural . Structural tests shall be peformed as specified on detail drawings. The load requirements shal I be met as specified. 4.6.2 Hydrotest. Hydrotesting shall be per
17、formed in accordance with applicable drawings. The specified testing pressure shall be met for the specified time. Pressure gages shall be accurate to one percent of testing pressure. The unit shall be visually and tactunlly examined during pressure test for any indication of water leakage. Moni- to
18、ring the pressure gage alone fr an indication of low volume leakage is not sufficient. 4.7 Preparation for delivery inspection. - Preservation, packaging, and packing shall conform to section 5. 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R
19、-23021B 13 77777Ob 0302982 1 MI L-R-23021 B (OS) 5. PREPARATION FOR DELIVERY 5.1 Preservation and packaging. Preservation and packaging shall be level A or C, as specified (6.2) . 5.1 .1 Level A. 5.1 .1 .1 Cleaning, drying, and preservation application. Cleaning, drying, and preservation application
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR23021B1969ROCKETMOTORMANUFACTURINGINERTPARTSFORGENERALSPECIFICATIONFOR 火箭发动机 插件 制造 通用 规范 PDF

链接地址:http://www.mydoc123.com/p-981163.html