NAVY MIL-P-21343 (2)-1985 PUMPS CENTRIFUGAL SUBMARINE TRIM AND DRAIN (SERIES TYPE ONLY)《(仅只模式组)潜水的倾斜排流的离心泵》.pdf
《NAVY MIL-P-21343 (2)-1985 PUMPS CENTRIFUGAL SUBMARINE TRIM AND DRAIN (SERIES TYPE ONLY)《(仅只模式组)潜水的倾斜排流的离心泵》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-P-21343 (2)-1985 PUMPS CENTRIFUGAL SUBMARINE TRIM AND DRAIN (SERIES TYPE ONLY)《(仅只模式组)潜水的倾斜排流的离心泵》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、! - MIL-P-ZL343. (2) 43 - 7797706 0273884 8 E -35-07 HIL-P=21343(SHIPS) AMENDMENT 2 23 August 1985 SUPERSEDING AMENDMENT 1 1 September 1964 MILITARY SPECIFICATION PUMPS, CENTRIFUGAL, SUBMARINE TRIM AND DRAIN (SERIES TYPE ONLY) This amendment forms a part of Military Specification MIL-P-Z1343(SIPS),
2、dated 9 May 1958, and is approved for use within the Naval Sea Systems Command, Department of the Navy and is available for use by all Depart- ments and Agencies of the Department of Defense. PAGE 1 2.1: Under Military Specifications add: “MIL-1-45208 - Inspection System Requirements.“ PAGE 2 2.1: D
3、elete: “NAVY DEPARTMENT General Specifications for Inspection of Material.“ * 3.1: Delete and substitute: “3.1 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspection (see 4.1.1 and 6.2).“ PAGE 12 * 4.1: Delete “Qualification“ and subs
4、titute “First article“. * 4.1.1: Delete and substitute: “4.1.1 First article tests at a laboratory. First article tests shall be conducted at a laboratory satisfactory to the Naval Sea Systems Command. head,.capacity and other characteristics of units for first article tests shall be as specified by
5、 the Naval Sea Systems Command.“ The * 4.1.2: Delete. * 4.1.3: Delete. FSC 4320 DISTRIBUTION STATEMENT A Approved for public release; distribution unlimited 1 of 3 THIS DOCUMENT CONTAINS .3 PAGES . ?; .i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-
6、,-MIL-P-21343(SHIPS) AMENDMENT 2 PAGE 13 I 4.2.2: Delete and substitute: “4.2.2 continuous nonstop run of at least 30 minutes to check operation and smoothness. of running. necessary to prevent injury.“ Each pump shall be tested at designed maximum operating speed by a While running at this speed th
7、e pump need not be loaded except as 4.2.3, second sentence: Delete. 4.3.3, lines 1 and 2: Delete “as selected by the Government inspector,“ PAGE 14 4.3.11: Delete and substitute: “4.3.11 Where shock tests are conducted at a Government laboratory, copies of the applicable master drawings shall accomp
8、any the units.“ PAGE 15 4.4, second sentence: Delete and substitute: “Ordinarily material analysis and physical test specimens will not be required; however, procedures shall be employed to assure that parts are made of the same materials and by the same processes as for assembled pumps.“ * 4.5: Del
9、ete and substitute: “4.5 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. fied in the contract or purchase order, the contractor may use his own or any ot
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILP2134321985PUMPSCENTRIFUGALSUBMARINETRIMANDDRAINSERIESTYPEONLY 仅只 模式 潜水 倾斜 离心泵 PDF

链接地址:http://www.mydoc123.com/p-980629.html