NAVY MIL-I-23252 B-1981 INDICATOR PRESSURE《压力指示器》.pdf
《NAVY MIL-I-23252 B-1981 INDICATOR PRESSURE《压力指示器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-23252 B-1981 INDICATOR PRESSURE《压力指示器》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-I-23252B bb W 77777Ob OL3L707 O F-03-+7 MIL-I-Z3252B(AS) SUPERSEDING MIL-I-23252A(AS) 3 February 1981 . 3 February 1976 MILITARY SPECIFICATION INDICATOR, PRESSuflE This specification is approved for use by Naval Air Systems Command, Department of the Navy, and is available for use by all Departm
2、ents and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification establishes the requirements for the design, manufacture, inspection and testing of pressure indicators. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documents, of the issue in effect on date of
3、invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL BB-N-411 Nitrogen, Technical. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should
4、 be addressed to: Commanding Officer, Naval Air Engineering Center, Engineering Specifications and Standards Department (ESSD) Code 93, Lakehurst, N. J. 08733, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter.
5、 U.S. GOVERNMENT PRINTING OFFICE 1981-703-023/l026 FSC 6685 THIS DOCUMENT CONTAINS 19 PAGES. I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-23252B bb m 7777706 0131i708 2 m MIL-I-23252B(AS) MILITARY DOD-D-1000 MIL-C-5501 MIL-B-22020 STANDARD
6、S MIL I TARY MIL-STD-109 MIL-STD-129 MIL-STD-143 MIL-STD-794 MIL-STD-810 MIL-STD-831 Drawing, Engineering and Associated Lists. Cap and Plug, Protective, Dust and Moisture Seal. Bag, Transparent, Flexible, Sealable, Volatile Cor- rosion Inhibitor, Treated. Quality Assurance Terms and Definitions. Ma
7、rking for Shipment and Storage. Specifications and Standards, Order of Precedence for Parts and Equipment, Procedures for Packaging and Environmental Test Methods. Test Reports, Preparation of. the Selection of. Packing of. DRAWINGS NAVAL AIR SYSTEMS CO- (Code Ident 30003) DL 58A164D556 Receiver Ass
8、embly, Nitrogen. (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be ob- tained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 First article. When specified (
9、see 6.2.1), the contractor shall furnish sample unit(s) for first article inspection and approval (see 4.4 and 6.3). 3.1.1 First article sample. Unless otherwise specified in the contract or pu-rchase order (see 6.2.1), a first article sample of four pressure indicators shall be delivered to the tes
10、ting activity designated in the contract or pur- chase order (see 6.2.1). The first article sample shall be manufactured using the same methods, materials, processes and procedures proposed for production. Any production prior to acceptance of the first article sample is at the con- tractors risk. 2
11、 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-23252B bb m 9999906 0333709 4 m 3.2 Selection and quality Verification of parts and materials. Quality verified parts (see 3.2.1) and materials from approved sources (see 3.2.2) shall be used in
12、the fabrication of the end item. The contractor shall pre- pare test reports of conformance to applicable requirements. 3.2.1 Approval of parts and materials. Parts and materials proposed for use in the fabrication of the end item that are not specified in detail herein or in applicable referenced d
13、ocuments shall be selected from other documents in the order of precedence specified in MIL-STD-143 and shall be approved by the procuring activity prior to use. (vendor) approval and verification of part quality by test. Approval shall be predicated upon source 3.2.2 source approval. The contractor
14、 shall be responsible for ascer- taining that each proposed source for parts and materials maintains a quality control program to ensure consistent delivery of products conforming to appli- cable requirements. When parts or materials are fabricated by the contractor, the area used for that purpose s
15、hall be considered the same as an outside vendor insofar as source approval is concerned. Source approvals by the contractor shall be subject to concurrence by the procuring activity. Source approval will be granted by the procuring activity upon preparation of accept- able evidence of any of the fo
16、llowing: a. Formal on-site survey of the vendors manufacturing facilities. b. The source has been previously approved, and evidence is avail- t able to confirm that acceptable product quality has been main- tained. c. Other evidence of acceptable product quality is available. 3.2.3 Verification of p
17、art quality. Quality verification shall be demon- strated by successful testing of the part to levels of environmental, elec- trical, and physical stresses equal to or greater than those which will be encountered in the system and as required by the part specification. Part quality may be demonstrat
18、ed by any of the following: a. When the part is manufactured and qualified to a military specification which includes requirements equal to or more severe than those of the end item application. b. When the part is manufactured and qualified to a military speci- fication not including all requiremen
19、ts of the application, and additional tests for such requirements have been performed. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I-23252B bb m 77777Ob OL3L7LO O m MIL-I-23252B(AS) c. When the part is not qualified to a military specificat
20、ion, but all tests appropriate to the application have been performed. 3.2.4 Approved source/quality verified parts list (AS/QVPL). An AS/QVPL shall be prepared by the contractor for all subassemblies and parts for ap- proval by the procuring activity. All entries on the AS/QVPL shall be fully subst
21、antiated by the preparation of data to satisfy the requirements of source approval and part test approval as specified herein. Reports of all quality verification testing shall conform to the requirements of MIL-STD-831. The contractor may solicit from the procuring activity information as to the st
22、atus of quality verified parts and approved sources which may have been previously developed. Neither part environmental tests nor part environmental test re- ports are required in those instances where vendors are selected from current AS/QVPLs of other programs. Entries on the AS/QVPL shall identi
23、fy the vendor and the product which is proposed for use inthe pressure indicator by the con- tractor. In the event several sources have previously been approved for the application, the contractor shall specify the source of the parts to be used. Each item listed shall be supported in accordance wit
24、h the provisions of this section. This listing does not supplant or modify the applicable documenta- tion or other Government Qualified Parts Listing. 3.2.4.1 Conditions governing the quality verification of parts. When the contractor proposes to demonstrate the quality verification of parts, as pro
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI23252B1981INDICATORPRESSURE 压力 指示器 PDF

链接地址:http://www.mydoc123.com/p-979793.html