FORD WSK-M2P137-A3-2010 PAINT PERFORMANCE ENGINES AND ENGINE ACCESSORIES 96 h SALT SPRAY TO BE USED WITH FORD WSS-M99P1111-A 《发动机和发动机附件的96 h盐雾试验涂料性能 与福特WSS-M99P1111-A 一起使用[使用 福.pdf
《FORD WSK-M2P137-A3-2010 PAINT PERFORMANCE ENGINES AND ENGINE ACCESSORIES 96 h SALT SPRAY TO BE USED WITH FORD WSS-M99P1111-A 《发动机和发动机附件的96 h盐雾试验涂料性能 与福特WSS-M99P1111-A 一起使用[使用 福.pdf》由会员分享,可在线阅读,更多相关《FORD WSK-M2P137-A3-2010 PAINT PERFORMANCE ENGINES AND ENGINE ACCESSORIES 96 h SALT SPRAY TO BE USED WITH FORD WSS-M99P1111-A 《发动机和发动机附件的96 h盐雾试验涂料性能 与福特WSS-M99P1111-A 一起使用[使用 福.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 ENGINEERING MATERIAL SPECIFICATIONDate Action Revisions 2010 12 14 N-STATUS A1/A2 Replaced by WSS-M2P177-C1; A3 Replaced by WSS-M2P177-C2 G. Weber, NA 2003 08 21 Revised Para 3.0 inserted; Para 3.1, 3.2, 3.7, 3.8, 4 deleted 1990 02 01 C01031532 Released CE Herriott concurred J Schult Printed copies
2、 are uncontrolled Copyright 2010, Ford Global Technologies, Inc. Page 1 of 6 PAINT PERFORMANCE, ENGINES, AND ENGINE WSK-M2P137-A1 ACCESSORIES, 24 h SALT SPRAY PAINT PERFORMANCE, ENGINES, AND ENGINE WSK-M2P137-A2 ACCESSORIES, 48 h SALT SPRAY PAINT PERFORMANCE, ENGINES, AND ENGINE WSK-M2P137-A3 ACCESS
3、ORIES, 96 h SALT SPRAY NOT TO BE USED FOR NEW DESIGN 1. SCOPE These specifications define the performance requirements for paints or powder coat systems with adequate appearance and durability for engines and engine accessories and/or parts within the engine compartment. WSK-M2P137-A1 For engines an
4、d parts requiring 24 h corrosion resistance or functional requirements. WSK-M2P137-A2 For engines and parts requiring 48 h corrosion resistance or functional requirements. WSK-M2P137-A3 For engines and parts requiring 96 h corrosion resistance or functional requirements. 2. APPLICATION These specifi
5、cations were released originally to describe the performance of finishes where resistance to corrosion, fuel, hot oil and coolant is required. 3. REQUIREMENTS 3.0 STANDARD REQUIREMENTS FOR PRODUCTION MATERIALS Material suppliers and part producers must conform to the Companys Standard Requirements F
6、or Production Materials (WSS-M99P1111-A). 3.3 SYSTEM COMPONENTS 3.3.1 Substrate As specified on the Engineering Drawing. 3.3.2 Cleaning The surface to be coated must be free from oil or alkaline residues, fingerprints, rust, dirt, moisture, and other foreign materials. ENGINEERING MATERIAL SPECIFICA
7、TIONWSK-M2P137-A1/A2/A3 Printed copies are uncontrolled Copyright 2010, Ford Global Technologies, Inc. Page 2 of 6 3.3.3 Coating Material 3.3.3.1 Pretreatment A preliminary shot blasting or pickling operation may be required on castings, forgings, scaled steel. Zinc phosphate pretreatment is recomme
8、nded, but is not mandatory. The required performance may be achieved by other techniques. Where zinc phosphate is used it should be as follows: Zinc phosphate coating per WSK-M3P1-C for cold rolled steel, pre-coated, electroplated zinc or zinc alloy coated steel and zinc die castings. Chromium oxide
9、 coating per WSK-M6P2-B is used for aluminum. Zinc phosphate coating per WSK-M3P1-C shall be used if steel and aluminum parts are processed concurrently. The aluminum tolerance of the process used shall not be exceeded and all requirements of both WSK-M3P1-C and this specification shall be met by bo
10、th steel and aluminum parts. Light weight amorphous iron phosphate is not permitted. Machined surfaces, which on assembly mate with other surfaces, are to be masked or capable of satisfactory machining after coating. 3.3.3.2 Coating System The quality required is that obtainable with best commercial
11、 practice to meet the performance requirements of this specification. Air dried or stoved finishes are permitted. Any suitable method of coating application may be used. Coating must be sufficient to meet all performance requirements of this specification. Durability is obtained by a) Quality of mat
12、erials used b) Variation in film thickness 3.3.3.3 Cathodic Electrocoat As specified on the Engineering Drawing Ford Engineering approved materials. 3.3.3.4 Primer, (Where necessary to achieve specified appearance and/or performance). Ford Engineering approved materials. ENGINEERING MATERIAL SPECIFI
13、CATIONWSK-M2P137-A1/A2/A3 Printed copies are uncontrolled Copyright 2010, Ford Global Technologies, Inc. Page 3 of 6 3.3.3.5 Top Coat Air drying, forced drying or stoving coating. This may be one coat or two coat synthetic resin based system, powder coat, water based, or solvent borne coating. Any c
14、oating must satisfy Manufacturing operational requirements and be a Ford Engineering approved material. Note: Engines oversprayed with approved clear lacquer WSK-M1J207-A or equivalent must meet the requirements of this specification on lacquer covered and bare metal areas. 3.3.3.6 Powder Coat As sp
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- FORDWSKM2P137A32010PAINTPERFORMANCEENGINESANDENGINEACCESSORIES96HSALTSPRAYTOBEUSEDWITHFORDWSSM99P1111A

链接地址:http://www.mydoc123.com/p-750509.html