ATIS 0300061-2014 NPA Code Relief Planning and Notification Guidelines (Reissued with the resolution of Issue 780).pdf
《ATIS 0300061-2014 NPA Code Relief Planning and Notification Guidelines (Reissued with the resolution of Issue 780).pdf》由会员分享,可在线阅读,更多相关《ATIS 0300061-2014 NPA Code Relief Planning and Notification Guidelines (Reissued with the resolution of Issue 780).pdf(47页珍藏版)》请在麦多课文档分享上搜索。
1、 ATIS-0300061 NPA CODE RELIEF PLANNING AND NOTIFICATION GUIDELINES Reissued with the resolution of Issue 780 September 5, 2014 Page 2 Copyright 2014 by the Alliance for Telecommunications Industry Solutions, Inc. All rights reserved. The NPA Code Relief Planning i.e. two-way 7-digit dialing across N
2、PAs might involve several rate centers and many NXX codes in multiple NPAs. Additionally, the relief planning model used by NANPA cannot take into account the protected routes when projecting the lives of new NPA relief alternatives because the model assumptions are based on the premise that all NXX
3、s available for assignment can be assigned to all rate centers. A high number of protected routes may impact the availability of NXX codes in specific rate centers (usually high-demand rate centers), which directly impacts the exhaust timeframe of an area code. As a result, NPA relief planning may s
4、tart prematurely or may not permit for the standard intervals for relief implementation. In the long term, the plan shall result in the most effective use possible of all codes serving a given area. Ideally, all of the codes in a given area shall exhaust about the same time in the case of splits. In
5、 practice, this may not be possible, but severe imbalances, for example, a difference in NPA lifetimes of more than 10 years, shall be avoided. 5.1 Determine the Expected NPA Exhaust Period - Through the use of historical growth data as well as expected changes (e.g. pooling) to NXX demands in the f
6、uture, NANPA should project to the best of its ability the expected quarter of exhaust of the NPA. Every practical source of data, including the NRUF survey results should be used as an aid in this projection. Projection results should be reported to the industry as soon as the NRUF or other analysi
7、s results are available. Once the earliest likely exhaust date is determined, NANPA should suggest a mandatory dialing date six months prior to the exhaust date if the recommended relief is an overlay. If the recommended relief is a geographic split, the end of the recorded announcement period shoul
8、d be at least six months prior to the earliest likely exhaust date. 2Per letter dated 10-29-97 from NANC Chairman to INC Moderator. 3In the case of an NPA overlay, cross NPA boundary calls originating from the overlay must be dialed on a 10-digit basis. NPA Code Relief Planning and, b) The NPA is no
9、t in jeopardy. 5.12 NPA Relief Planning Life Cycle The life cycle of an NPA relief planning and implementation project may vary widely, depending on the local regulatory process. It typically involves the following tasks or events: NANPAs notification of the start of the relief planning process to t
10、he industry; The industrys review of the IPD; The process of the industry reaching consensus on a relief recommendation(s) to the appropriate regulator; The filing of the relief petition with the regulator; The regulatory decision process (which may include regulatory hearings as well as public hear
11、ings); and The order from the regulator. The timing between the above tasks varies, and these tasks or events may be interrupted or delayed. Typical delays or interruptions may include: The industry postpones the filing of the relief petition; The relief petition becomes eligible for withdrawal (see
12、 Section 5.10); The regulator does not immediately act on the petition; After issuing a relief order, the regulator subsequently determines that relief is not needed and issues an order of “suspension until further notice”; or The regulator dismisses the relief petition. NPA Code Relief Planning eac
13、h state or province, each metropolitan area and each industry segment will have unique characteristics which could introduce concerns not included here. The following items are examples of issues which, based on past industry experiences, could create impediments to a successful and efficient implem
14、entation effort. 7.1 Regulatory Involvement - Involvement of the appropriate regulatory authority staff during NPA code relief planning may expedite the process of addressing public policy concerns throughout the process. 7.2 Timing and Schedules - Issues related to timing and scheduling will vary w
15、ith the type of relief method to be implemented as well as the level of difficulty of the required changes. In general, the relief implementation should be in place six months prior to the projected exhaust of the NPA, but in extraordinary situations, at least three months before the existing NPA wo
16、uld exhaust under the highest growth projections. 7.3 Customer Calling Patterns - Existing and planned local calling areas should be considered during the planning process and retained, wherever practical, along with their existing or planned dialing arrangements. This may prevent regulatory policy
17、delays during implementation and/or unexpected changes to the final plan 7.4 Rate Center Consolidations Any pending rate center consolidation plans should be considered during a relief planning meeting. Once a regulator makes a decision on rate center consolidation, the Relief Planner should obtain
18、applicable documentation. 7.5 LNP Technical Considerations Any technical issues related to LNP should be considered during a relief planning meeting. Since the introduction of LNP, industry experience shows that 9See FCC 01-362 81-94. NPA Code Relief Planning and/or b) are materially affected by dec
19、isions made via the consensus process during NPA relief planning activities for the affected NPA. ANI CONVERSION The process by which the NPA portion of the calling partys automatic number identification (ANI) from end offices located in the new NPA changes from the old NPA to the new NPA. Audit The
20、 accumulation and evaluation of evidence about documented information of an auditee to determine and report on the degree of compliance with INC industry guidelines. Auditee The SP/NANPA/PA that is the subject of an audit. Auditor The FCC or its other designated agents perform audits of US numbering
21、 resources (FCC 00-429 90). State Commissions also may conduct audits. (FCC 01-362 101). CLASS Custom Local Area Signaling Service (CLASS) is one of an identified group of network-provided enhanced services. Note: A CLASS group for a given network usually includes several enhanced service offerings,
22、 such as incoming-call identification, call trace, call blocking, automatic return of the most recent incoming call, call redial, and selective forwarding and programming to permit distinctive ringing for incoming calls. CO Code Administrator Entity(ies) responsible for the administration of the NXX
23、s within an NPA. In the United States and its territories, this is currently the NANPA. See also 47 CFR 52.15. Code Holder An assignee of a pooled or non-pooled NXX that is assigned by the CO Code Administrator. The responsibilities of an assignee for a pooled NXX are defined in Section 4.2.1 of the
24、 Thousands Block Number (NXX-X) Pooling Administration Guidelines (TBPAG) and for a non pooled NXX are defined in Section 6.3 of the Central Office Code (NXX) Assignment Guidelines (COCAG). A given Code Holder is identified in the LERG Routing Guide as the NPA-NXX-A (Assignee) OCN record holder. Con
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ATIS03000612014NPACODERELIEFPLANNINGANDNOTIFICATIONGUIDELINESREISSUEDWITHTHERESOLUTIONOFISSUE780PDF

链接地址:http://www.mydoc123.com/p-540975.html