1、Designation: F 962 04Standard Specification forOil Spill Response Boom Connection: Z-Connector1This standard is issued under the fixed designation F 962; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers design criteria requirements,design geometry, material characteristics, and desirable fea-tures for oil spil
3、l response boom connections. These criteria areintended to define minimum mating characteristics and are notintended to be restrictive to a specific configuration.2. Referenced Documents2.1 ASTM Standards:2F 818 Terminology Relating to Spill Response BarriersF 1523 Guide for Selection of Booms in Ac
4、cordance withWater Body Classifications3. Material Characteristics3.1 End connector and cross pin materials shall be corrosionresistant in sea water and such other environments as theintended service may require. If dissimilar metals are used,care shall be used in design to avoid galvanic corrosion.
5、3.2 Any material is acceptable for construction of the boomconnector provided consideration is given to such factors asweight, mechanical strength, chemical resistance, flexibility,and conditions of the environment in which it is to be used.4. Design Requirements4.1 The minimum tensile strength of a
6、 boom-to-boomconnection shall equal or exceed the minimum fabric tensilestrength specified in Table 1 of Guide F 1523.4.2 When the connector is designed as an integral part of theboom, it shall ensure distribution or transfer of the tensionmember loads from one boom section to the next through oraro
7、und the end connector in such a manner that the integrity ofthe joint is not broken.4.3 The connector or adapter shall not take more than 0.04in. permanent set when a 250-lb load, distributed over 3 in., isapplied. The load shall be applied at the location that results inmaximum deflection and shall
8、 be resisted by supports placed12in. from each end as shown in Fig. 1.4.4 In addition to the dimensional requirements shown inFig. 2, the self-locking cross-pin/lanyard assembly shall havethe following characteristics:4.4.1 Its assembled strength shall resist a tensile load of 180lbs placed upon the
9、 closed toggle by the test fixture to whichthe cross pins lanyard is attached without deformation asshown in Fig. 3.4.4.2 It shall have a ring or lanyard loop of a minimumdiameter of 1-12 in. for the convenience of pulling the pin fromthe boom connectors.4.4.3 The toggle shall turn freely and shall
10、latch in eitherdirection.4.4.4 The cross-pins spring shall be captured or locked tothe assembly and shall exert a force on the toggle of between16 and 22 lbs when connectors are assembled.4.4.5 When the cross-pins spring is compressed fully, thereshall be a clearance of18 in. between the short end o
11、f the toggleand the mated connector as shown in Fig. 2.4.4.6 The cross-pins overall length shall be minimized andits ends rounded or chamfered so as to minimize wear and tearon adjacent stored booms or injury to boom handlers.4.5 Pinholes, designed to accommodate the38 in. diameterself-locking pin,
12、shall be incorporated at the design water line(DWL) and, if required, a location as determined in 4.5.1 or4.5.2 and shown in Fig. 4.4.5.1 For any connector with 7.0 - 12.9 in. of connectormaterial below the DWL pinhole, a second pinhole shall belocated 6.000 6 0.0015 in. below the DWL pinhole as sho
13、wnin Fig. 4(a).4.5.2 For any connector with 13.0 in. or more of connectormaterial below the DWL pinhole, a second cross-pin hole shallbe located 12.000 6 0.0015 in. below the DWL pinhole asshown in Fig. 4(b).4.6 Where one half of a connector set mates with one havingthe geometry defined herein but i
14、s of other dimensions, it shallmeet the following design requirements:4.6.1 Possess adequate mechanical strength.4.6.2 Minimize oil leakage.4.6.3 Be sexless (neither male/female).4.6.4 Be full height of boom of which it is a part.4.6.5 Not impair stability of the boom.1This specification is under th
15、e jurisdiction of ASTM Committee F20 onHazardous Substances and Oil Spill Response and is the direct responsibility ofSubcommittee F20.11 on Control.Current edition approved Nov. 1, 2004. Published February 2005. Originallyapproved in 1986. Last previous edition approved in 1999 as F 962 99.2For ref
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF9622004STANDARDSPECIFICATIONFOROILSPILLRESPONSEBOOMCONNECTIONZCONNECTOR 漏油 反应 连接 标准规范 连接器 PDF

链接地址:http://www.mydoc123.com/p-537625.html