ASTM E3073-2017 Standard Guide for Development of Waste Management Plan for Construction Deconstruction or Demolition Projects《制备建设 破坏或拆除工程废弃物管理计划的标准指南》.pdf
《ASTM E3073-2017 Standard Guide for Development of Waste Management Plan for Construction Deconstruction or Demolition Projects《制备建设 破坏或拆除工程废弃物管理计划的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM E3073-2017 Standard Guide for Development of Waste Management Plan for Construction Deconstruction or Demolition Projects《制备建设 破坏或拆除工程废弃物管理计划的标准指南》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E3073 17Standard Guide forDevelopment of Waste Management Plan for Construction,Deconstruction, or Demolition Projects1This standard is issued under the fixed designation E3073; the number immediately following the designation indicates the year oforiginal adoption or, in the case of re
2、vision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 The purpose of this guide is to facilitate development ofa waste management plan for construction,
3、 deconstruction, ordemolition projects (hereafter, construction waste management(CWM) plan).1.2 This guide applies to CWM plans developed forconstruction, renovation, deconstruction, and demolition ofbuildings, factories, parking structures, and any other structure,as well as above- and below-ground
4、 infrastructure.1.3 This guide includes CWM plan guidance for the wastesgenerated on-site during construction, deconstruction, anddemolition projects.NOTE 1For example, included is any waste generated during theseactivities such as structural and finish materials and construction chemi-cals; constru
5、ction product and materials packaging; construction officewaste, including paper documents; wastes from site development work,such as excavated soils, rocks, vegetation, and stumps; and other ancillaryitems, such as broken tools, safety materials/personal protectiveequipment, and food and beverages
6、and their packaging. The list of itemsabove is offered for illustration purposes only; it is not intended to be fullyinclusive of all materials from a construction, deconstruction, or demoli-tion project that are suitable for reuse, repurposing, manufacturerreclamation, composting, and recycling.1.4
7、 Waste generated in the manufacture, preparation, orfabrication of materials before delivery to the job site are not inthe scope of this guide.1.5 This guide does not change or substitute for any federal,state, or local statutory or regulatory provisions or require-ments related to the handling, con
8、trol, containment, transport,or disposition of any particular material.1.6 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety, health, and environmental practices
9、and deter-mine the applicability of regulatory limitations prior to use.1.7 This international standard was developed in accor-dance with internationally recognized principles on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Reco
10、m-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standard:2E2114 Terminology for Sustainability Relative to the Perfor-mance of Buildings3. Terminology3.1 DefinitionsFor definitions related to sustainability re-lated to th
11、e performance of buildings, see Terminology E2114.3.2 Definitions of Terms Specific to This Standard:3.2.1 comingle, vto blend multiple types of waste into asingle container.3.2.1.1 DiscussionIn the case of comingled materials, athird party will sort and quantify the amount of each materialor group
12、of material types, with the goal of sending eachstream for reuse, recycling, or other disposition. Material typemay be paper, recyclable plastics, unrecyclable plastics, and soforth, and may vary with the local capabilities to recycle, reuse,or carry out other dispositions. Even with comingling, som
13、eon-site separation may be required.3.2.2 construction waste management (CWM) plan,ndocument that describes the intended actions to managediscarded materials based on consideration of the type andvolume of materials, region, infrastructure available, andlife-cycle analysis (when available) and track
14、s the materials tobe managed.3.2.2.1 DiscussionTracked material pathways may in-clude landfills, combustion facilities (waste to energy, invasivespecies control, and biomass production facilities) reuse,repurposing, manufacturer reclamation, composting, recycling,and other methods.1This guide is und
15、er the jurisdiction of ASTM Committee E60 on Sustainabilityand is the direct responsibility of Subcommittee E60.01 on Buildings and Construc-tion.Current edition approved Dec. 1, 2017. Published January 2018. DOI: 10.1520/E3073-17.2For referenced ASTM standards, visit the ASTM website, www.astm.org,
16、 orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis internationa
17、l standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
18、13.2.3 recycling facility, nfacility performing recyclingoperations in compliance with federal, state/provincial, andlocal regulations or third-party, independent certification.3.2.3.1 DiscussionThe purpose of the third-party, inde-pendent certification is to verify and validate the operations ofthe
19、 facility, including the rate at which materials are beingdiverted, as well as to bring consistency to how recycling ratesare calculated and reported across facilities.3.2.4 sort on-site (source-separation), vsorting of wastesaccording to material classification at the construction site.3.2.4.1 Disc
20、ussionWaste is often sorted on-site to allowquantification of each general type of material that is removedfrom the site.4. Significance and Use4.1 There are many reasons to implement a CWM plan. Thefocus of this guide is development of CWM plans that describeintended waste management methods and pr
21、econstruction andconstruction procedures to facilitate the optimal handling ofdiscarded materials.4.2 A CWM plan includes, but is not limited to, require-ments for documentation of the types and amounts of materialgenerated, final disposition of the materials, and supportingevidence or statements as
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME30732017STANDARDGUIDEFORDEVELOPMENTOFWASTEMANAGEMENTPLANFORCONSTRUCTIONDECONSTRUCTIONORDEMOLITIONPROJECTS

链接地址:http://www.mydoc123.com/p-532315.html