《ASTM E2013-2006 Standard Practice for Constructing FAST Diagrams and Performing Function Analysis During Value Analysis Study《在价值分析研究中制定功能分析系统技术图和进行功能分析的标准操作规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2013-2006 Standard Practice for Constructing FAST Diagrams and Performing Function Analysis During Value Analysis Study《在价值分析研究中制定功能分析系统技术图和进行功能分析的标准操作规程》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 2013 06Standard Practice forConstructing FAST Diagrams and Performing FunctionAnalysis During Value Analysis Study1This standard is issued under the fixed designation E 2013; the number immediately following the designation indicates the year oforiginal adoption or, in the case of rev
2、ision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers a logical structure for the functionanalysis of a building project or process
3、.1.2 This practice provides a system to identify unnecessarycosts of a project.1.3 The values stated in SI units are to be regarded as thestandard. The inch-pound units given in parentheses are forinformation only.1.4 This standard does not purport to address all of thesafety concerns, if any, assoc
4、iated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E 631 Terminology of Building ConstructionsE 833 Terminolo
5、gy of Building EconomicsE 1557 Classification for Building Elements and RelatedSiteworkUNIFORMAT IIE 1699 Practice for Performing Value Analysis (VA) ofBuildings and Building Systems3. Terminology3.1 Definitions:3.1.1 For definitions of terms used in this practice, refer toTerminologies E 631 and E
6、833.4. Summary of Practice4.1 This practice provides an organized approach for deter-mining the needs and desires of the owners/users/stakeholdersduring the Value Analysis (VA) of a project. These needs anddesires are presented as functions of the project.4.2 This practice establishes a logical proc
7、edure for allocat-ing cost to each function.4.3 Function analysis helps design professionals justify thevalue of their concepts. It also provides the owners/users/stakeholders with a justification of their investments.5. Significance and Use5.1 This practice establishes a communication formatthrough
8、 which all owners/users/stakeholders can understand,analyze, revise, and agree on the purposes of the project. Thispractice presents a method by which owners/users/stakeholders needs and desires are compared to the cost tosatisfy those needs and desires. This is done by identifying thelow preference
9、/high cost functions and high preference/lowcost functions. These data will be used in the value analysisstudy as a basis to create alternative solutions.5.2 This practice helps developers, owners, users, stake-holders, planners, contractors, architects, engineers, value ana-lysts, cost professional
10、s, and any one who is responsible for thebudget, construction, maintenance, or operation of the project.5.3 A Practice E 1699 has been published. As part of thevalue analysis study, perform function analysis after thecollection of relevant information and prior to the identificationof alternatives.
11、Function Analysis Systems Technique (FAST)data helps the user identify the alternatives that are highlyvalued with respect to their cost.6. Procedure6.1 Function analysis consists of five sequential steps: (1)select a building component, (2) define the needs and desires(functions), (3) classify func
12、tions, (4) allocate cost to eachfunction, and (5) analyze the importance and expected perfor-mance level of the functions.6.2 Selection of a Building ComponentFor cost-effectiveness, select building components that offer a signifi-cant opportunity for improvement of performance, reduction incost, or
13、 both.1This practice is under the jurisdiction of ASTM Committee E06 on Perfor-mance of Buildings and is the direct responsibility of Subcommittee E06.81 onBuilding Economics.Current edition approved April 1, 2006. Published April 2006. Originallyapproved in 1999. Last previous edition approved in 1
14、999 as E 2013 99.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harb
15、or Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.6.3 Definition of Needs and Desires (Functions)Defineeach significant need or desire of the owners/users/stakeholdersin two words using an active verb and a descriptive noun. Thetwo-word definitions are the functions of the proje
16、ct.6.4 Classification of FunctionsCategorize the functions ofthe building component as basic (essential to meet the owners/users/stakeholders needs) or supporting (enhances the satis-faction of the owners/users/stakeholders needs and desires).6.5 Distribution of Cost to FunctionsDivide cost of eachc
17、omponent into smaller sections based on the specific use ofthe project and distribute cost to each function.6.6 Analysis of Functions:6.6.1 Analyze functions through a structured logical formatcalled Function Analysis Systems Technique (FAST). FAST isa diagramming technique which specifically illust
18、rates therelationships and interrelationships of all functions within aspecific project using a “How-Why” logic pattern. There aretwo FAST variations.6.6.2 One variation, known as Technical FAST, develops acritical path to define the basic needs of the project. Thisdiagram helps the user calculate t
19、he ratio of total cost to criticalfunctions.36.6.2.1 Technical FAST diagramming is effective in a spe-cific situation or element within a project. The situation orelement is an assembly or a portion of a construction design.Terms or functions are oriented to technical activities. ATechnical FAST dia
20、gram has a specific structural form (Fig. 1).6.6.2.2 There are four important concepts in a TechnicalFAST diagram:1. 9How-Why9 Logic Questions2. Scope LineHigher Order FunctionBasic FunctionRequired Secondary FunctionsCausative Function3Certification Examination Guidelines, SAVE International, Dayto
21、n, OH.FIG. 1 Function Analysis Systems Technique (Technical FAST)E20130623. Critical Functions4. Supporting FunctionsDesign ObjectivesAll The Time FunctionsCaused-by/Same-time Functions6.6.2.3 Function analysis requires analyzing why a functionexists and how a function satisfies other functions to c
22、ompletethe link between them. This “How-Why” logic assures that allthe required functions are listed in the FAST diagram.46.6.2.4 Begin the Technical FAST diagramming with ahigher order function of the project and two scope lines. Allfunctions that the selected element fulfills are bounded by thetwo
23、 scope lines. The basic function is on the right of theleft-hand scope line, and the higher order function is on the left.The purpose of the element or project for which a FASTdiagram is developed is the higher order function. The rela-tionship between the higher order function and the basicfunction
24、 is determined by asking “Why” the basic functioncandidate performs as it does. The answer should be the higherorder function. The logic check must be completed by asking“How” the higher order function performs. The logical answermust be the basic function candidate. It is still necessary toconfirm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME20132006STANDARDPRACTICEFORCONSTRUCTINGFASTDIAGRAMSANDPERFORMINGFUNCTIONANALYSISDURINGVALUEANALYSISSTUDY

链接地址:http://www.mydoc123.com/p-530052.html