1、Designation: D 4436 08Standard Test Method forRock Bolt Long-Term Load Retention Test1This standard is issued under the fixed designation D 4436; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number i
2、n parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 The objective of this test method is to determine thetime over which rock bolt tension decreases from the installedvalue to a designated minim
3、um value.1.2 This test method is applicable to any anchor systemwhich is not fully encapsulated immediately upon installation,including mechanical, cement grout, resin (epoxy, polyester,and the like) or other similar systems.1.3 The values stated in inch-pound units are to be regardedas standard. Th
4、e values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.4 All observed and calculated values shall conform to theguidelines for significant digits and rounding established inPractice D 6026.1.4.1 The method used to
5、 specify how data are collected,calculated, or recorded in this standard is not directly related tothe accuracy to which the data can be applied in design or otheruses, or both. How one applies the results obtained using thisstandard is beyond its scope.1.5 This standard does not purport to address
6、all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D 653 Terminology
7、Relating to Soil, Rock, and ContainedFluidsD 3740 Practice for Minimum Requirements for AgenciesEngaged in Testing and/or Inspection of Soil and Rock asUsed in Engineering Design and ConstructionD 4435 Test Method for Rock Bolt Anchor Pull TestD 6026 Practice for Using Significant Digits in Geotechn
8、i-cal DataD 6167 Guide for Conducting Borehole Geophysical Log-ging: Mechanical Caliper3. Terminology3.1 See Terminology D 653 for general definitions.3.2 Definitions of Terms Specific to This Standard:3.2.1 loadthe total axial force on the rock bolt.3.2.2 design loadthe load specified for the rock
9、boltduring the life of the project.3.2.3 installation loadthe load on the bolt immediatelyafter installation.3.2.4 stand timethe time required for the bolt load todecrease from the installation load to the design load.4. Summary of Test Method4.1 A rock bolt is installed in the same manner and in th
10、esame material as its intended support use. The load on the boltis monitored over a period of time, usually several weeks.5. Significance and Use5.1 Rock bolts are used for support in a variety of miningand civil engineering situations.3After a bolt is installed, theload generally decreases over tim
11、e due to deterioration of theborehole wall, creep, and other factors. This process may bearrested by fully encapsulating the bolt shortly after installa-tion. This is generally done by pumping the bolt hole full ofcement grout, though synthetic resins may also be used. Therate of load loss determine
12、s the interval during which the boltmust be encapsulated during construction.5.2 The local characteristics of the rock, such as roughnessof the borehole and induced fractures, are significant factors inthe load loss characteristics of the bolt. To obtain realisticvalues, the test holes should be dri
13、lled using the same methodsas those used for the construction boreholes.5.3 In establishing a testing program, the following factorsshould be considered:5.3.1 Load retention tests should be conducted in all rocktypes where construction bolts will be installed. If the rock isanisotropic, for example,
14、 bedded or schistose, the tests should1This test method is under the jurisdiction ofASTM Committee D18 on Soil andRock and is the direct responsibility of Subcommittee D18.12 on Rock Mechanics.Current edition approved July 1, 2008. Published July 2008. Originally approvedin 1984. Last previous editi
15、on approved in 2004 as D 4436 04.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3For additional information
16、see, “Suggested Method for Monitoring Rock BoltTension Using Load Cells,” Suggested Methods for Rock Bolt Testing, InternationalSociety for Rock Mechanics Commission on Standardization of Laboratory andField Tests, 1974.1*A Summary of Changes section appears at the end of this standard.Copyright AST
17、M International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.be conducted in the same orientations relative to the anisotropyas the construction bolts will be installed.5.3.2 In each rock type, at each orientation, and for eachanchor system, a sufficient numbe
18、r of tests should be con-ducted to determine the average and minimum long-termcapacities within a fixed uncertainty band at the 95 % confi-dence level. The allowable uncertainty band depends on theproject and involves such factors as rock quality, expectedproject lifetime, and importance of the area
19、s to be bolted. Theuncertainty band determination will require considerable engi-neering judgment. As a rough guideline, at least six long-termtests for a single set of variables have been found necessary tosatisfy the statistical requirements.5.3.3 The design load and installation load on the rock
20、boltsystem should be predetermined. The installation load is lessthan the anchor capacity, as determined by Method D 4435.The design load is less than the installation load; the amountdepends on rock properties and the minimum time required toencapsulate the bolts. Alternatively, this method can be
21、run fora predetermined time interval based on construction require-ments, and a realistic design load can be determined from thedata.NOTE 1The quality of the result produced by this standard isdependent on the competence of personnel performing it, and thesuitability of the equipment and facilities
22、used. Agencies that meet thecriteria of Practice D 3740 are generally considered capable of competentand objective testing/sampling/inspection/etc. Users of this standard arecautioned that compliance with Practice D 3740 does not in itself assurereliable results. Reliable results depend on many fact
23、ors; Practice D 3740provides a means of evaluating some of those factors.6. Apparatus6.1 Load CellA load cell shall be used to measure thetension in the rock bolt. The cell may be of the mechanical,photoelastic, hydraulic, rubber compression pad, or electronictype. The electronic type is recommended
24、. The cell shall havean accuracy of at least 6200 lbf (6890 N), including errorsintroduced by the excitation and read-out system, and aresolution of least 100 lbf (445 N).6.2 Anchor SystemsThe anchors used for testing shall befrom the manufacturers standard production stock. Mechani-cal anchors shal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD44362008STANDARDTESTMETHODFORROCKBOLTLONGTERMLOADRETENTIONTEST 岩石 长期 负载 保持 试验 方法 PDF

链接地址:http://www.mydoc123.com/p-517045.html