1、Designation: B 215 08Standard Practices forSampling Metal Powders1This standard is issued under the fixed designation B 215; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicat
2、es the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope*1.1 These practices describe two procedures for obtainingsamples of metal powders for
3、subsequent testing:1.1.1 Practice AFor powders being transferred fromblenders or storage tanks.1.1.2 Practice BFor powders already packaged in con-tainers.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of
4、this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:B 243 Terminology of Powder Metallurgy23. Terminology3.1 Definitions Definitions of powder metallurgy termscan be foun
5、d in Terminology B 243. Additional descriptiveinformation is available in the Related Materials section of Vol02.05 of the Annual Book of ASTM Standards.3.2 Description of Terms (see Fig. 1):3.2.1 incrementquantity of powder obtained by a sam-pling device at one time from a single lot.3.2.2 gross sa
6、mplequantity of powder adequate for thetests to be performed, consisting of all the increments takenfrom a single lot.3.2.3 composite sampleblended entire gross sample.3.2.4 test samplequantity of powder taken from the com-posite sample for determining a single property or for prepar-ing the test pi
7、eces. It should normally be taken by splitting thecomposite sample.3.2.5 test portion (test specimen)defined quantity of pow-der taken from the test sample on which the test is performedor from which test pieces are produced.4. Significance and Use4.1 Since many tests are performed using very smalla
8、mounts of powder, it is most important that the test portionsbe obtained in a standardized manner. The practices describedhere take into account the possibility of segregation of themetal powder during and after filling of containers.PRACTICE AFOR POWDERS BEING TRANSFERRED FROMBLENDERS OR STORAGE TA
9、NKS5. Apparatus5.1 Rectangular Receptacle, capable of being moved com-pletely across the stream of flowing powder at a constant speedand having a length and width greater than the stream of1These practices are under the jurisdiction of ASTM Committee B09 on MetalPowders and Metal Powder Products and
10、 are the direct responsibility of Subcom-mittee B09.02 on Base Metal Powders.Current edition approved Nov. 1, 2008. Published December 2008. Originallyapproved in 1946. Last previous edition approved in 2004 as B 215 04.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact
11、ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.FIG. 1 Scheme of Sampling1*A Summary of Changes section appears at the end of this standard.Copyright ASTM International, 100 Barr Harbor Dri
12、ve, PO Box C700, West Conshohocken, PA 19428-2959, United States.powder. It must be large enough so that no overflow of powderoccurs when collecting the sample.5.2 Small Blender.5.3 Sample Splitter, see Fig. 2.5.4 Spinning Riffler, see Fig. 3.6. Procedure6.1 Pass the rectangular receptacle at a cons
13、tant speedcompletely through the stream of flowing powder. If the entirecontents of one lot of powder are being packed in a singlecontainer, take increments when the container is14 ,12 , and34filled. If several containers are to be filled by one lot of powder,take the first increment when the first
14、container is12 filled, thesecond increment in the middle of the run, and the thirdincrement near the end of the run. Additional increments maybe agreed upon by the parties concerned. The total amountfrom all increments shall be adequate for the tests to beperformed. Combine the increments to obtain
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMB2152008STANDARDPRACTICESFORSAMPLINGMETALPOWDERS 金属粉末 取样 标准 实施 规程 PDF

链接地址:http://www.mydoc123.com/p-460636.html