ARMY MIL-M-71213-1995 MOUNT MACHINE GUN MK93 MOD 1 (DUAL MOUNT)《MK93模型1(双重安装)高射机枪安装》.pdf
《ARMY MIL-M-71213-1995 MOUNT MACHINE GUN MK93 MOD 1 (DUAL MOUNT)《MK93模型1(双重安装)高射机枪安装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-71213-1995 MOUNT MACHINE GUN MK93 MOD 1 (DUAL MOUNT)《MK93模型1(双重安装)高射机枪安装》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-M-712L3 9 9999906 2005058 607 = MIL-M-71213 (AR) 28 March 1995 MILITARY SPECIFICATION MOUNT, MACHINE GUN: MK93 MOD1 (DUAL MOUNT) This specification is approved for use by the U.S. Army Armament Research, Development and Engineering Center, and is available for use by all Departments and Agencies
2、 of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements, examinations and tests for the Dual Mount, MK93 MOD1, that mounts both the M2 Heavy Barrel Machine Gun (HBMG), .50 caliber, and MK19 Grenade Machine Gun (GMG), 40MM, in both vehicular (M1025/M1026 High Mob
3、ility Multipurpose Wheeled Vehicle (“V) and ground mounted modes (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless oth
4、erwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS MILITARY MIL-W-13855 - Weapons: Small Arms and Aircraft Armament Subsy
5、stems, General Specification for MIL-W-63150 - Weapons and Support Material Standard Quality Assurance Provisions for Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document, should be addressed to: Commander, U.S. Amy ARDEC,
6、ATTN: AMSTA-AR-EDE-S, Picatinny Arsenal, New Jersey 07806-5000 by using the Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1095 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by
7、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-fl-71213 = 9999906 2005059 543 STANDAFXIS MI LI TARY MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-2073 - DOD Materiel Procedures for Development and Application of Packaging Requirements (Unle
8、ss otherwise indicated, copies of federal and military specifications, standards, and handbooks are available from DODSSP - Customer Service, Standardization Documents Order Desk, 700 Robbins Avenue, Bldg. 4D, Philadelphia, PA 19111-5094.) 2.1.2 Other Government documents, drawinqs, and Dubli- catio
9、ns. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. DRAWINGS (see 6.4) U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC)
10、 6650717 - MK93 MOD1 (Copies of other Government documents, drawings, and publications required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting activity.) 2.2 Order of precedence. In the event of a co
11、nflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. (See contract provisions for additional precedence criter
12、ia.) 3. REQUIREMENTS 3.1 Materials. Materials shall be in accordance with the 3.2 ComDonents and assemblies. The components and applicable drawings and specifications. assemblies shall comply with all requirements specified on Drawing 6650717, all associated drawings, and with all requirements speci
13、fied in applicable specifications and drawings, and with requirements specified on Quality Assurance Provisions (QAPs) as well. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3 First article. When specified in the contract or purchase order (see
14、 6.21, a sample shall be subjected to first article inspection in accordance with the technical provisions herein (see 4.3). 3.4 Performance characteristic. 3.4.1 MK93 MOD1 assemblins: Movement of comoonents. The contractor shall assemble Dual Mounts (Dwg. 6650717) with both M2 HBMG and MK19 GMG and
15、 full ammunition cans of .50 caliber M2 dummy linked rounds and of 40MM M922 dummy linked rounds, respectively, to simulate actual operations. All movements (rotation and sliding) shall be free of any binding; in particular the MK175 Adapter with guns (M2 HBMG and MK19 GMG) shall be able to rotate 3
16、60 degrees in both directions. Operation of the mechanism shall provide for both bold and accurate operator adjustable controlled traverse and elevation over the full range of elevation and depression of +250 mils (+14 degrees) to -250 mils (-14 degrees). Testing shall be as specified in paragraph 4
17、.8.1. 3.4.2 Functioninq. This test shall be performed by the Government at a government test site. With a M2, .50 caliber machine gun and full ammunition box of caliber -50 linked, 4 ball, 1 tracer, ammunition installed and a MK19, 40MM grenade launcher and full ammunition box of 40MM linked M385 TP
18、 rounds, the mounts shall be capable of the full range of movements (i.e., 360 degree pintle azimuth traverse each direction, and full gun elevation and depression) without binding or damage to the gun, mount or support. The mounts shall be capable of the full range of movements without binding, and
19、 shall not be damaged after being subjected to the firing of not less than 100 rounds each of government standard .50 caliber, linked, 4 ball, 1 tracer ammunition and 40MM M385 TP rounds, respectively. Testing shall be as specified in paragraph 4.8.2. 3.4.3 Interchanseabilitv. Unless otherwise speci
20、fied on the applicable drawings or in 6.2, all parts shall be inter- changeable. Testing shall be as specified in paragraph 4.8.3. 3.5 WorkmanshiD. Workmanship shall be in accordance with MIL-W-63150. 4. QUALITY ASSURANCE PROVISIONS 4.1 ResDonsibility for inspection. Unless otherwise specified in th
21、e contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the perfor
22、mance of the inspection requirements specified herein, 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIb-M-7L2L3 9999906 2005063 LTL unless disapproved by the Government. The Government reserves the right to perform any of the inspections set fo
23、rth in this specification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requirements. 4.1.1 Responsibility for compliance. All items shall meet all requirements of Sections 3 and 5. in this specification shall become a part of the contractors overa
24、ll inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract. inspectio
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM712131995MOUNTMACHINEGUNMK93MOD1DUALMOUNTMK93 模型 双重 安装 高射机枪 PDF

链接地址:http://www.mydoc123.com/p-445999.html