ANSI ASME PTC 6-2004 Steam Turbines (Erratum 2 2006).pdf
《ANSI ASME PTC 6-2004 Steam Turbines (Erratum 2 2006).pdf》由会员分享,可在线阅读,更多相关《ANSI ASME PTC 6-2004 Steam Turbines (Erratum 2 2006).pdf(116页珍藏版)》请在麦多课文档分享上搜索。
1、Performance Test CodesAN AMERICAN NATIONAL STANDARDSteam TurbinesASME PTC 6-2004(Revision of ASME PTC 6-1996)Intentionally left blank ASME PTC 6-2004(Revision of ASME PTC 6-1996)Steam TurbinesPerformance Test CodesThree Park Avenue New York, NY 10016AN AMERICAN NATIONAL STANDARDDate of Issuance: Oct
2、ober 31, 2005This Code will be revised when the Society approves the issuance of a new edition. There will be noaddenda issued to ASME PTC 6-2004.ASME issues written replies to inquiries as code cases and interpretations of technical aspects of thisdocument. Code cases and interpretations are publis
3、hed on the ASME Web site under the CommitteePages at http:/www.asme.org/codes/ as they are issued.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American National Stan-dards.
4、 The Standards Committee that approved the code or standard was balanced to assure that individuals from com-petent and concerned interests have had an opportunity to participate. The proposed code or standard was made avail-able for public review and comment that provides an opportunity for additio
5、nal public input from industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with an
6、y itemsmentioned in this document, and does not undertake to insure anyone utilizing a standard against liability for infringe-ment of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expressly advisedthat determination of the validity of any such patent
7、 rights, and the risk of infringement of such rights, is entirely theirown responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted as gov-ernment or industry endorsement of this code or standard.ASME accepts responsibility for o
8、nly those interpretations of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise, without the prior wr
9、itten permission of the publisher.The American Society of Mechanical EngineersThree Park Avenue, New York, NY 10016-5990Copyright 2005 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTSNotice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiForeword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viiiCommitee Roster . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
11、. . . . . . . . . . . . . . . . . . . . xCorrespondence With the PTC 6 Committee . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiiSection 1 Object and Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1 Object . . .
12、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3 Full-Scale and Alternative Tests . . . . . .
13、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4 Conformance to Code . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21-5 Additional Requirements and References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
14、 2Section 2 Definitions and Description of Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32-1 Symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .32-2 Abbreviations . . . . . . . . . . . . . . . .
15、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32-3 Subscripts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .42-4 Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16、. . . . . . . . . . . . . . . . . . . .62-5 Table for Conversion to SI Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6Section 3 Guiding Principles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73-1 Planning f
17、or Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73-2 Items on Which Agreement Shall be Reached . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73-3 Timing of Acceptance Test . . . . . . . . . . . . . . . . . . . . . . . . .
18、. . . . . . . . . . . . . . . . . . . . 83-4 General Test Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93-5 Isolation of the Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 103-6 Location
19、of Turbine Valve Points . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113-7 Number of Test Runs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 123-8 Testing Conditions . . . . . . . . . . . . . . . . . . . . . . . . .
20、 . . . . . . . . . . . . . . . . . . . . . . . . . . 123-9 Frequency of Observations and Duration of Test Runs . . . . . . . . . . . . . . . . . . . . . . . 143-10 Calibration of Instruments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 153-11 Steam Pressu
21、re and Temperature Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . 173-12 Corrections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .173-13 Methods of Comparing Test Results . . . . . . . . . . . . . . . . . . . . .
22、 . . . . . . . . . . . . . . . . 173-14 Tolerances . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19Section 4 Instruments and Methods of Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204-1 General . . . . . .
23、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204-2 Measurement of Mechanical Output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 214-3 Measurement of Feedwater Pump Power . . . . . . . . . . . . . . . . . .
24、. . . . . . . . . . . . . . . 224-4 Measurement of Electrical Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 244-5 A-C Generator Test Instruments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 274-6 D-C Generator Test Instruments
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASMEPTC62004STEAMTURBINESERRATUM22006PDF

链接地址:http://www.mydoc123.com/p-432074.html