AIR FORCE AFM 32-1094-2009 CRITERIA FOR AIR FORCE PRECISION MEASUREMENT EQUIPMENT LABORATORY DESIGN AND CONSTRUCTION.pdf
《AIR FORCE AFM 32-1094-2009 CRITERIA FOR AIR FORCE PRECISION MEASUREMENT EQUIPMENT LABORATORY DESIGN AND CONSTRUCTION.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE AFM 32-1094-2009 CRITERIA FOR AIR FORCE PRECISION MEASUREMENT EQUIPMENT LABORATORY DESIGN AND CONSTRUCTION.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、BY ORDER OF THE AIR FORCE MANUAL 32-1094SECRETARY OF THE AIR FORCE 1 NOVEMBER 1998Civil EngineeringCRITERIA FOR AIR FORCE PRECISION MEASUREMENTEQUIPMENT LABORATORY DESIGN AND CONSTRUCTIONNOTICE: This publication is available digitally on the SAF/AAD WWW site at: http:/afpubs.hq.af.mil. If youlack ac
2、cess, contact your Publishing Distribution Office (PDO).OPR: HQ AFCESA/CESM Certified by: HQ AFCESA/CES(Mr Alvin L. Day) (Col Lance C. Brendel)Supersedes AFM 88-4CH10, 19 June 1974. Pages: 28/Distribution: FThis manual implements AFPD 32-10, Installations and Facilities. It prescribes criteria for d
3、esign andconstruction of Precision Measurement Equipment Laboratories (PMEL) on Air Force installations. Refer to TO00-20-14 for operational procedures and operating environmental requirements. This manual does not apply to theAir National Guard. Users should send comments and suggested improve-ment
4、s on AF Form 847,Recommendation for Change of Publication, through major commands (MAJCOM) and HQ AFCESA/CESM,139 Barnes Dr Suite 1, Tyndall AFB FL 32403-5319 to HQ USAF/ILEC, 1260 Air Force Pentagon, WashingtonDC 20330-1260.SUMMARY OF REVISIONSThis is the initial publication of AFMAN 32-1094, which
5、 replaces AFM 88-4, Chapter 10.Certified Current 11 December 2009Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2 AFMAN 32-1094 1 NOVEMBER 1998Section A Purpose and Responsibilities 31. Purpose . 32. Responsibilities 3Section B Facility Design 33. D
6、esign Approach. 3Figure 1. Example PMEL Layout 44. Space Requirements. 4Table 1. PMEL Minimum Area Requirements Worksheet 5Table 2. Additional Equipment Area Requirements 55. Acceptance Testing Criteria. 6Section C General Facility Requirements. 66. Site Evaluation. 67. Building. 7Section D Material
7、s and Methods of Construction 88. Type N Construction 89. Clean Construction Protocol. 810. Structural Elements 811. Minimizing Vibration. 812. Vapor Barriers . 913. Finishes . 914. Wainscots 915. Air Lock Doors 916. Floor Covering in Calibration/Repair Areas and Air Locks. 917. Ceilings . 9Section
8、E Heating, Ventilation, and Air Conditioning (HVAC) for Calibration/Repair Areas 1018. Standards for Facility Environmental Control. 1019. HVAC Design Considerations 1020. Facility HVAC Design Features. 1121. Calibration Area Environmental Control. 12Section F Electrical Power 1222. Power Distributi
9、onq. 1223. Electrical Utility Room. 1324. Emergency Electrical Power Disconnects 1325. Antenna Ports 1326. Grounding 1327. Backup Power 1328. Electrical Receptacles 1329. Electrical Feeds 1430. Main Power Panels and Main Electrical Feeds 1431. Internal Electromagnetic Interference (EMI)/Radio Freque
10、ncy Interference (RFI) Control 1432. Calibration/Repair Area. 14Section G Lighting. 1433. Illuminance1434. Emergency Lighting. 1435. Explosion Proof Lighting. 14Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-AFMAN 32-1094 1 NOVEMBER 1998 3Section H
11、Support Areas . 1436. Design Considerations 14Section I 68 Degree Rooms and Other Special Requirements 1637. Modular Prefabricated PMEL Rooms. 1638. RADIAC Calibration Areas . 1739. Force and Pressure Measurement Areas 1740. Liquid Flow Calibration Area. 1741. Azimuth Reference. 18Section J Commissi
12、oning 1942. Standards. 19Attachment 1-Glossary of References and Supporting Information. 20Attachment 2-Tables of Design/Commissioning Criteria 23Section APurpose and Responsibilities1. Purpose. Many PMELs built or renovated in recent years have not met minimum operating environmentstandards. These
13、facilities cannot be certified by the Air Force Metrology and Calibration Program, resulting inloss of calibration capability at the bases. This manual provides Air Force Civil Engineer standards for design andconstruction of Precision Measurement Equipment Laboratories. Use it as a guide for site s
14、election and design of anew metrology laboratory, or for modification of an existing facility. Only those requirements which directly affectthe accuracy and integrity of the measurements made and are unique to a calibration laboratory are addressed.Criteria in this manual must not be used as sole ju
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEAFM3210942009CRITERIAFORAIRFORCEPRECISIONMEASUREMENTEQUIPMENTLABORATORYDESIGNANDCONSTRUCTIONPDF

链接地址:http://www.mydoc123.com/p-427263.html