1、DEPARTMENTS OF THE AIR FORCE, THE ARMY THE NAW THE DEFENSE LOGISTICS AGENCY Washington DC 20330-5000 Quality and Reliability Assurance AFR 7418 SECNAVINST 4855.8 DUR 8200.1 1 14 July 1989 AR 702-17 QUALITY IMPROVEMENT AND PRODUCT NONCONFORMANCE REDUCTION This regulation implements DOD policy on nonc
2、onformance reduction and Federal Acquisition Regulation (FAR) Parts 46 and 52 policy on nonconforming material. It establishes policy and requirements to address improving quality through reduction in the cost and incidence of nonconforming products. It complements Total Quality Management (TQM) pol
3、icy on nonconformance prevention which focuses on those actions that should be taken early in the design, development and production of new systems,subsystems, or equip- ment to achieve first-pass conformance and prevent repetitive nonconformances throughout the produc- tion process. This regulation
4、 applies to all DOD Contracting Mices (COS) and Contract Administration Offices (CAOs); however, CAOs will not initiate or continue action under paragraphs 5 or 6 whena contrac- tor has demonstrated satisfactory evidence of continuous process improvement and is achieving low levels of nonconformance
5、. 1. Background: a. It is Government policy to reject material and supplies not conforming in all respects to contract requirements (FAR 46.407). (1) Deviation from this policy is permissi- ble only as authorized in FAR 46.407, when ac- ceptance of such material and supplies is in the best interest
6、of the Government. (2) The act of offering nonconforming ma- terial to the Government by a contractor should be an exception. (3) The consistent offering of nonconform- ances is usually an indication of inadequate con- trol over quality or over specuication of techni- cal requirements. b. CAOs may r
7、eject or accept minor waivers for nonconformances unless authority is with- held by the CO. Federal Acquisition Regulation (FAR) Parts 46 and 52 describe conditions un- der which a contract will be modified to provide an equitable price reduction or other consider- ation when supplies or services in
8、volving minor nonconformance are accepted. c. This regulation harmonizes CAO ap- proaches and assists the Administrative Con- tracting Officer (ACO) in determining appropri- ateness of an equitable price reduction or other e consideration for minor nonconformance. The purposes of seeking considerati
9、on are: (1) The Government has a legal right to the products pecified in the contract. (2) Acceptance of nonconformance can re- lieve financial incentives for improvement and incorrectly communicate to a contractors man- agement and workforce that it is acceptable to produce nonconforming material.
10、(3) Consideration serves to focus manage- ment attention on the cost and consequences of reprocessing or replacing nonconforming mate- rial. d. Contracting Offices are encouraged to: (1) Require contractors to disclose costs as- sociated with the correction and dispositioning of nonconforming materi
11、al. (2) Consider these costs in determining the effectiveness of potential contractors proposed quality programs. Negotiations should reflect improvement in quality performance and re- duction in historical levels of nonconformance costs. (3) Consider contractual incentives for con- tractor quality
12、improvement and nonconform- ance cost reduction beyond that baselined in the negotiated price. No. of Printed Pages: 6 OPR: SAF/AQCM (R. G. Bradley) Approved by: Brig Gen J. D. Slinkard Writer-Editor: L. J. Mazulewicz Distribution: See Page 4 rn 3535789 0554b73 954 rn Provided by IHSNot for ResaleNo
13、 reproduction or networking permitted without license from IHS-,-,-a AFR 74-WAR 72-17ISECNAVINST 4866.#DLAR 8200.11 14 July 1989 (4) Support nonconformance reduction ef- forts by CAOS on existing production contracts. !& Objectives. The objectives of this regula- tion are to reduce or eliminate nonc
14、onforman- ces and promote continuous quality improvement. Continuous quality improve- ment is intended to address sigdicant cost dri- ver$ that prevent full conformance to contract requirements. Continuous quality improve- ment involves appropriate action to: a. Establish goals and practices to impr
15、ove manufacturing process capability. b. Minimize process variability and increase c. Reduce deficiencies during manufactur- d. Correct unrealistic requirements. e. Improve first-pass acceptance rates. f. Reduce cost associated with scrap, rework andrepair. g. Address other criteria and controls tha
16、t can increase productivity, manufacturing or operational efficiency and product utility. product uniformity. ing, test and inspection. 3. Scope. This regulation applies to fmed- price type production contracts with higher-lev- el contract quality requirements as defined by FAR 46.202-3. It applies
17、to contracts at prime contractor facilities, material from offsite feed- er locations, inter-organizational transfers, and subcontracted or supplier items on which mate- rial review is pedormed by the prime contrac- tor. It may also be applied to other contracts, such as those with incentive or awar
18、d provi- sions, that are appropriate for quality improve- ment. a. This regulation applies to minor waivers and deviations processed by CAOS with author- ity to approve or concur in classification of class II engineering changes unless otherwise direcb edbytheC0. b. ContniCtingfices andCAOs will enc
19、our- age prime contractors to implement a noncon- forming material reduction program meeting the same objectives with their major/critical subcontractors and suppliers. 4, Policy: a. The CAO will evaluate a contractors prod- uct nonconformance history as: (1) Evidence of the effectiveness of a con-
20、tnictors engineering, manufacturing, quality asaurance or inspection4 systems to amm- plish their objectives. (2) A measure of the effectiveness of correc- tive action efforts. (3) A condition for accepting minor noncon- formances submitted by the contractor. b. The CAO will ensure efforts under thi
21、s regulation to address continuous process im- provement and product nonconformance reduc- tion are compatible with contract administra- tion delegations and contract requirements. On prime contracts for major defense acquisition programs the CAO will coordinate with the CO when an agreement with th
22、e contractor is planned to address quality improvement for nonconformance reduction. In the event of dis- agreement between the CAO and the CO, the disagreement will be elevated to higher man- agement as necessary to achieve resolution. c. The CAO will not initiate or continue ac- tion under paragra
23、phs 5 or 6 of this regulation for a facility or process for which a contractor has demonstrated to the CAO satisfactory evi- dence of continuous process improvement and is achieving a low level of nonconformance. CAO action related to obtaining consideration and quality improvement for product nonco
24、nform- ance reduction will be suspended selectively or collectively within a contractor facility when the CAO determines: (1) The cost to the Government of process- ing a contract modification will exceed the cost to a contractor in correcting the nonconform- ance or replacing the product with one f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEAFR74181989QUALITYIMPROVEMENTANDPRODUCTNONCONFORMANCEREDUCTION 质量 提高 产品 不合格 降低 PDF

链接地址:http://www.mydoc123.com/p-427257.html