ABS 101 CORR-2014 GUIDE FOR 'DYNAMIC LOADING APPROACH’ FOR FLOATING PRODUCTION STORAGE AND OFFLOADING (FPSO) INSTALLATIONS.pdf
《ABS 101 CORR-2014 GUIDE FOR 'DYNAMIC LOADING APPROACH’ FOR FLOATING PRODUCTION STORAGE AND OFFLOADING (FPSO) INSTALLATIONS.pdf》由会员分享,可在线阅读,更多相关《ABS 101 CORR-2014 GUIDE FOR 'DYNAMIC LOADING APPROACH’ FOR FLOATING PRODUCTION STORAGE AND OFFLOADING (FPSO) INSTALLATIONS.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 ABSGUIDE FOR DYNAMIC LOADING APPROACH FOR FPSO INSTALLATIONS .2010 1 GUIDE FOR DYNAMIC LOADING APPROACH FOR FLOATING PRODUCTION, STORAGE AND OFFLOADING (FPSO) INSTALLATIONS MAY 2010 CORRIGENDA/EDITORIALS 1 February 2014 Page No. Paragraph Comments Foreword ii Foreword In second paragraph, reference
2、 “Section 1-1-2 of the ABS Guide for Building and Classing Floating Production Installations (FPI Guide)” to read “Section 1-1-2 of the ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. ii Foreword In second and third paragraphs, reference “FPI Guide” to read “FPI R
3、ules”. (2 places) Section 1 Introduction 1 1/1 In first paragraph, reference “ABS Guide for Building and Classing Floating Production Installations (FPI Guide)” to read “ABS Rules for Building and Classing Floating Production Installations (FPI Rules)”. 1 1/1 In first, second, third, and fifth parag
4、raphs, reference “FPI Guide” to read “FPI Rules”. (4 places) 1 1/3.1 Reference “FPI Guide” to read “FPI Rules”. (2 places) 2 1/3.1 In first paragraph and Item i), reference “FPI Guide” to read “FPI Rules”. (3 places) 4 1/5 In Item ii), reference “FPI Guide” to read “FPI Rules”. 4 1/5 In second parag
5、raph, reference “FPI Guide” to read “FPI Rules”. 5 1/5 In last paragraph, delete “published in December 2006”. Section 2 Load Cases 8 2/7.1 In Note, reference “FPI Guide” to read “FPI Rules”. 11 2/13 Reference “FPI Guide” to read “FPI Rules”. Section 3 Environmental Conditions 12 3/1 In first paragr
6、aph, reference “FPI Guide” to read “FPI Rules”. 15 3/7.1 Reference “FPI Guide” to read “FPI Rules”. (2 places) 16 3/7.5 In first paragraph, reference “FPI Guide” to read “FPI Rules”. (2 places) Corrigenda/Editorials 1 February 2014 2 ABSGUIDE FOR DYNAMIC LOADING APPROACH FOR FPSO INSTALLATIONS .2010
7、 Page No. Paragraph Comments Section 8 Internal Liquid Tank Pressure 30 8/1 Reference “FPI Guide” to read “FPI Rules”. 30 8/1 Reference “Section 5A-3-2/11 of the FPI Guide” to read “5A-3-2/11 of the FPI Rules”. 31 8/9 Reference “Section 5A-3-2/11 of the FPI Guide” to read “5A-3-2/11 of the FPI Rules
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS101CORR2014GUIDEFOR DYNAMICLOADINGAPPROACH FORFLOATINGPRODUCTIONSTORAGEANDOFFLOADINGFPSOINSTALLATIONSPDF

链接地址:http://www.mydoc123.com/p-400487.html