Aviation System Block UpgradesModule N B0-65-PIA-1.ppt
《Aviation System Block UpgradesModule N B0-65-PIA-1.ppt》由会员分享,可在线阅读,更多相关《Aviation System Block UpgradesModule N B0-65-PIA-1.ppt(12页珍藏版)》请在麦多课文档分享上搜索。
1、Aviation System Block Upgrades Module N B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance,Workshop on preparations for ANConf/12 ASBU methodology (Bangkok, 14-18/Nadi, 21-25 May 2012),SIP/ASBU/2012-WP/16 A,2,Module N B0-65 Optimization of Approach Procedures Including Verti
2、cal Guidance,ICAO SIP 2012- ASBU WORKSHOP,3,Limited number of GNSS-based PBN implemented, compared with conventional procedures.,ICAO SIP 2012- ASBU WORKSHOP,Module N B0-65 Baseline,4,PBN-Terminal procedures require no ground-based Nav Aids . Allows designers complete flexibility in determining fina
3、l approach lateral /vertical paths. States can implement GNSS-based PBN approach procedures with basic GNSS avionics with or without Baro VNAV capability, and for aircraft equipped with SBAS/GBAS avionics. Designed for runways with or without conventional approaches providing benefits to PBN-capable
4、 aircraft. Key to maximum benefits is aircraft equipage.,ICAO SIP 2012- ASBU WORKSHOP,Module N B0-65 Change Brought by the Module,5,ICAO SIP 2012- ASBU WORKSHOP,Module N B0-65 Intended Performance Operational Improvement,6,Documents providing background and implementation guidance for ANS providers,
5、 aircraft operators, airport operators and aviation regulators: PBN Manual GNSS Manual Annex 10 PANS-OPS Volume I Manual on Testing of Radio Navigation Aids (Doc 8071) Volume II Quality Assurance Manual for Flight Procedure Design (Doc 9906),ICAO SIP 2012- ASBU WORKSHOP,Module N B0-65 Necessary Proc
6、edures (Air & Ground),7,Avionics PBN approach procedures can be flown with basic IFR GNSS avionics TSO C129 receivers with RAIM Basic IFR GNSS receivers integrated with Baro VNAV functionality to support vertical guidance to LNAV/VNAV minima Aircraft with SBAS avionics (TSO C145/146) can fly approac
7、hes with vertical guidance to LPV minima, as low as ILS Cat I minima Aircraft require TSO C161/162 avionics to fly GBAS approachesGround Systems SBAS-based procedures do not require infrastructure at the airport, but SBAS elements (e.g. reference stations, master stations, GEO satellites) must be in
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AVIATIONSYSTEMBLOCKUPGRADESMODULENB065PIA1PPT

链接地址:http://www.mydoc123.com/p-378771.html