1、ANSI/I E E E C57.106-1977 (Rwisiin of IEEE Std 64-1969) guide for acceptance and main tena nce of insu la ti ng oil in equipment October 14, 1977 S“06486 ANSI/IEEE C57.106-1977 (Revision of IEEE Std 64-1969) An American National Standard IEEE Guide for Acceptance and Maintenance of Insulating Oil in
2、 Equipment Sponsor IEEE Transformers Committee of the IEEE Power Engineering Society Approved September 9,1976 IEEE Standards Board Approved June 16,1978 American National Standards Institute Copyright 1977 by The Institute of Electrical and Electronics Engineers, Inc 345 East 47th Street, New York,
3、 NY 10017, USA No part of this publication may be reproduced in any fm, in an electronic retrieval system or othmwise, without the prior written permission of the publisher. Approved September 9,1976 IEEE Standards Board William R. Kruesi, Chairman Irvin N. Howell, Jr, Vice Chairman Ivan G. Easton,
4、Secretary William E. Andrus Irving Kolodny William J. Neiswender Jean Jacques Archambault Benjamin J. Leon Gustave Shapiro Dale R. Cochran Anthony C. Lordi Ralph M. Showers Warren E. Cook John P. Markey Robert A. Soderman Louis Costrell Thomas J. Martin Leonard W. Thomas, Sr Jay Forster Donald T. Mi
5、chael Charles L. Wagner Joseph L. Koepfinger Voss A. Moore William T. Wintringhamt William S. Morgan ?Deceased Corrected edition August 30, 1978 Foreword (This Foreword is not a part of ANSI/IEEE C57.106-1977, Guide for Acceptance and Maintenance of Insulating Oil in Equipment.) This guide was prepa
6、red by the Subcommittee on Insulating Fluids of the Transformers Com- mittee of the IEEE Power Engineering Society. The membership of this subcommittee was: E. L. Raab, Chairman P. G. Benignus J. E. Dind J. A. Forster M. Frydman D. A. Gillies F. W. Heinrichs C. Keil T. G. Lipscomb Z. Zepic R. I. Low
7、e H. B. Margolis E. L. Morrison V. R. Mulhall R. J. Musil L. L. Preston L. J. Savio T. K. Sloat At the time it approved this standard, C57 had the following membership: H. D. Lewis, Chairman C. R. Wilmore, Secretary Organization Represented Bonneville Power Administration . Electric Light and Power
8、Group. . Furnace Equipment Manufacturers Association. . Institute of Electrical and Electronics Engineers . Naval Facilities Engineering Command . National Electrical Manufacturers Association. . Rural Electrification Administration . Tennessee Valley Authority. . Underwriters Laboratories. . U.S. B
9、ureau of Reclamation . Name of Representative George W. Iliff R. P. Bast I. 0. Berkhan I. H. Koponen J. P. Markey (Ait) P. H. Philippidis B. F. Smith S. Bennon W. P. Burt J. C. Dutton D. C. Johnson (Alt) L. W. Long D. E. Massey Leonard W. Johnson L. C. Aicher W. R. Courtade J. D. Douglass W. C. Kend
10、all H. D. Lewis G. W. Mayall (Alt) W. J. McNutt Norman M. Neagle (Alt) R. L. Schwab R. E. Uptegraff, Jr G. C. Wilburn J. C. Arnold, Jr L. R. Smith W. A. Farquhar (Alt) E. J. Huber R. H. Richardson Contents SECTION PAGE 1 . Introduction . 7 2 . 7 3 . Evaluation of Oil Received in New Equipment . Site
11、 and After Filling Such Apparatus . 3.1 Shipping Containers . 8 3.2 Check Tests on Receipt . 8 Handling of Oil by Customer and Placing Oil in Storage . Handling and Testing of Oil for Installing in Apparatus . 3.5 Watercontent . 9 Dielectric Breakdown Voltage . 11 Check Testing of the Oil Before Ene
12、rgizing the Transformer . 11 Standing Before Energizing . 11 Classification of Service-Aged Insulating Oil . 11 Evaluation of Oil for Use in Filtering Apparatus at the Installation 8 3.3 3.4 3.6 3.7 Gascontent . 11 3.8 3.9 9 9 4 . 5 . EconomicFactors . 11 6 . Sampling . 12 7 . Oil Tests and their Si
13、gnificance 12 8 . Testing Procedures 15 . . 8.1 Field Screening . 15 8.2 LaboratorJ! Screening . 15 Oil . 16 9.1 Reconditioning . 16 9.2 Reclaiming . 17 9 . Methods of Reconditioning and Reclaiming Service-Aged Insulating . 10 . Addition of Inhibitors 20 11 . Special Considerations 21 . 11.1 Insulat
14、ing Oil for Circuit Breakers . 21 APPENDIX A1 . General . 23 A2 . Transformer Oil Testing of Used Oil 23 A4 . AmountofTesting . 28 . A3 . Circuit Breaker Oil-Testing of Used Oil . 26 FIGURES Fig 1 . Schematic Diagram of Gravity-Percolation Refining Apparatus . 18 Fig 2 . Schematic Diagram of Trisodi
15、um Phosphate/Fullers Earth Refining Apparatus . 19 Test Limits for Insulating Oil Received in New Equipment . 8 Test Limits for Bulk Shipments of Insulating Oil . 9 Test Limits for Insulating Oil During Filling . 10 TABLES Table 1 Table 2 Table 3 Table 4 Table 5 Test Limits for Insulating Oil After
16、Filling and Recommended Standing Time but Before Energizing . Insulating Oil Tests . 10 12 PAGE Average Reported Values for Continued Use of Transformer Oil . 23 Classification of Service-Aged Transformer Oil . 24 Acceptable Limits for Service-Aged Oil versus Voltage Class . 24 Test Values on New Oi
17、l as Received and on Oil in Equipment Test Limits for Transformer Oil Before and After Reconditioning Field and Laboratory Tests on Circuit Breaker Oil in Service . 26 Field and Laboratory Tests Made on New Circuit Breakers Test Limits for Circuit Breaker Oil Before and After Reconditioning Frequenc
18、y of Test versus Voltage Class Per Cent of Utilities . 24 Prior to Energizing . 25 andReclaiming . 25 Classification of Service-Aged Circuit Breaker Oils . 27 Prior to Energizing . 27 andReclaiming . 27 Reconditioning and Reclaiming of Oil . 28 TABLES Table A1 Table A2 Table A3 Table A4 Table A5 Tab
19、le A6 Table A7 Table A8 Table A9 Table A10 Table All An American National Standard IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment 1. Introduction The reliable performance of oil in an insula- tion system depends upon certain basic oil characteristics which can affect overal
20、l appara- tus characteristics. Such oil characteristics are integral parts of the equipment design for which the manufacturer has final responsibility. The reliable operation of the equipment in service for which the electric power producer has final responsibility also depends on main- taining cert
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEEEC571061977IEEEGUIDEFORACCEPTANCEANDMAINTENANCEOFINSULATINGOILINEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-344768.html