IEEE 76-1974 - IEEE Guide for Acceptance and Maintenance of Transformer Askarel in Equipment.pdf
《IEEE 76-1974 - IEEE Guide for Acceptance and Maintenance of Transformer Askarel in Equipment.pdf》由会员分享,可在线阅读,更多相关《IEEE 76-1974 - IEEE Guide for Acceptance and Maintenance of Transformer Askarel in Equipment.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、o NOT nEMOVEIEEE Std 76-1974Revision of IEEE Std 761958IEE E Guide forAcceptance and Maintenance ofTransformer Askarel in EquipmentPublished by The Institute of Electrical and Electronics Engineers, Inc. 345 East 47th Street, New York, New York 10017March 1, 1974 SH10769IEEE Std 76-1974 Revision of
2、IEEE Std 76-1958 IEEE Guide for Acceptance and Maintenance of Transformer Askarel in Equipment Sponsor Transformers Committee of the IEEE Power Engineering Society Copyright 1974 by The Institute of Electrical and Electronics Engineers,. Inc. No part of this publication may be reproduced in any form
3、, in an electronic retrieval system or otherwise, without the prior written permission of the publisher. Approved May 24, 1973 IEEE Standards Board Robert D. Briskman, Chairman Sava I. Sherr, Secretary Stephen J. Angello Saul Aronow James E. Beehler Richard Brereton Warren H. Cook Louis Costrell Jay
4、 Forster Joseph L. Koepfinper William R. Kruesi Benjamin J. Leon Donald T. Michael Voss A. Moore J. David M. Phelps Saul W. Rosenthal Gustave Shapiro Ralph M. Showers Robert A. Soderman Frederick G. Timmel Leendert van Rooi.i Robert V. Wachter Bruno O. Weinschel William T. Wintringham Foreword (This
5、 foreword is not a part of IEEE Std 76-1974, IEEE Guide for Acceptance and Maintenance of Transformer Askarel in Equipment.) Originally published in 1958 as a trial-use guide for maintenance of transformer askarel, this stan dards document has been revised, updated, and approved as a full-status IEE
6、E Guide. The new edi tion not only reflects current practice, it also takes into consideration recent environmental con cerns about materials containing polychlorinated biphenyls. The standard was developed and ap proved by the Insulating Fluids Subcommittee of the IEEE Transformers Committee. At th
7、e time it approved this document, its membership was: P. G. Benignus G. L. Blenkle J. E. Dind J. A. Forster D. A. Gillies C. Keil A. H. Locke R. I. Lowe E. L. Raab, Chairman W. H. Meadet E. L. Morrison V. R. Mulhall J. C. Parkert P. S. Pugh W. C. Reinhardt R. L. Schwab T. K. Sloat t Deceased Followi
8、ng development and approval in the Insulating Fluids Subcommittee, this standard was reviewed and approved in the IEEE Transformers Committee. Membership in that committee was: G. W. Alexander, Vice Chairman J. H. Blake, Chairman L. C. Aicher R. Allustiarti R. J. Alton S. J. Antalis J. C. Arnold R.
9、R. Bast P. L. Bellaschi S. Bennon H. E. Bonheimer J. V. Bonucchi O. R. Compton J. E. Dind J. D. Douglass J. C. Dutton L. L. Dvorak H. P. Edler W. R. Farber S. L. Foster A. M. Fox E. R. Freitag C. R. French L. A. Gates R. F. Gilton A. Glassano8 A. W. Goldman J. C. Gorub R. W. Green W. F. Griffard E.
10、M. Gulachenski G. Gunnels G. H. Hall J. L. Harbell W. L. Hetherington K. R. Highton J. A. Hollowell E. L Hook G. W. Iliff W. D. Jordan G. K. Kallenbach C. P. Kappeler R. B. Kaufman C. Keil F.J.Kelly L. A. Kenoyer T. S. Lauber C. Lindsay A. H. Locke A. M. Lockie L. W. Long R. L. Macdonald H. B. Margo
11、lis D. E. Massey C. J. McMUlen C. H. Mock W. H. Mutschler P. Q. Nelson R. A. Nelson M. A. Oman S. Palmer A. F. Phillips L. L. Preston E. L. Raab D. A. Roach C. C. Honey, Secretary R. E. Russell L. J. Savio R. L. Schmid R. L. Schwab L. R. Smith A. L. Tanton R. C. Thomas D. E. Truax R. A. Veitch F.J.V
12、ogel J. P. Vora E. H. Wendt S. A. Wiencek G. C. Wilburn D. F. Winter J. R. Woodall W. E. Wrenn A. C. Wurdack F. S. Young L. R. Yule Contents SECTION PAGE 1. Scope and Introduction 5 2. General Characteristics of Askarel3. Evaluation of Askarel Received in New Equipment 6 4. Classification of Service
13、-Aged Askarel 6 5. Economic Factors 7 6. Sampling7. Askarel Tests and Their Significance 8 8. Testing Procedures 10 8.1 Field Screening8.2 Laboratory Screening9. Reconditioning and Reclaiming Service-Aged Askarel 10 9.1 General9.2 Treatment After Exposure to an Arc 19.3 Filtering Through Dry Blotter
14、 Paper to Remove Moisture and Extraneous Particles 1 9.4 Fullers Earth Treatment for Maximum Improvement of Power Factor and Volume Resistivity 19.5 Addition of Scavengers 110. Handling Materials11. Askarel Used Under Mild Arcing Conditions 12 12. Askarel Under Excessive Temperature or Fault Conditi
15、ons 113. Recommended Handling Precautions14. Storage, Handling, and Disposal 13 14.1 Drums 114.2 Tank Cars14.3 Sampling14.4 Effect of Light Exposure 13 14.5 Disposal15. Underwriters Laboratories ReportsAppendix: Results of Survey of United States and Canadian Users of Transformer Askarel 15 Al. Gene
16、ral 1A2. TestingA3. Reconditioning 6 A4. Frequence of Testing 1TABLES Table 1 Table 2 Acceptable Characteristics of Askarel in New Equipment Askarel Tests to Determine Classification 7 9 IEEE Guide for Acceptance and Maintenance of Transformer Askarel in Equipment 1. Scope and Introduction The term
17、askarel generally describes a wide ly used broad class of nonflammable synthetic halogenated hydrocarbon insulating liquids. In this guide, it applies solely to askarel in transformers, reactors, and accessory equip ment operated at power frequencies. Transformer askarels contain PCBs (poly-chlorina
18、ted biphenyls), which have been used in the United States and elsewhere over the past 40 years for many industrial and consum er applications. Recently, evidence has accu mulated to indicate that PCBs are widely dis persed throughout the environment and that they can have adverse ecological and tox-
19、icological effects. The Federal Interdepartmental Task Force report COM-72-10419, Poly chlorinated Bi phenyls and the Environment/* dated May 1972, has recommended restricting PCBs to use in transformers and capacitors. Methods for handling and disposal of ask arels and askarel-impregnated materials
20、 are given in Draft American National Standard, Guidelines for Handling and Disposal of Capacitor and Transformer-Grade Askar els Containing Polychlorinated Biphenyls, C107.1. This guide assists the power equipment op erator in evaluating askarel as received in transformers, reactors, and accessory
21、equip ment operated at power frequencies and in his efforts to maintain askarel in serviceable con dition. It recommends standardized tests and evaluation procedures. Methods are outlined for reconditioning and reclaiming askarel whenever necessary. 2. General Characteristics of Askarel Askarels of
22、various compositional types are used. Under arcing conditions the gases pro duced, while consisting of predominantly noncombustible hydrogen chloride, can yield varying amounts of combustible gases depend ing upon the askarel type. Insulation systems incorporating these ask arels and cellulosic or o
23、ther organic materials may, when arced, produce gaseous mixtures which are moderately flammable. As a pre caution, such gases should be removed from the askarel by bubbling dry nitrogen through the askarel and flushing the gas space with dry nitrogen before any work is performed on the apparatus. As
24、karel contained in apparatus as received from the manufacturer but prior to service op eration should exhibit certain properties in or der to insure satisfactory performance. It should be expected that askarel properly sam pled from such equipment usually exhibits characteristics somewhat different
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- IEEE761974IEEEGUIDEFORACCEPTANCEANDMAINTENANCEOFTRANSFORMERASKARELINEQUIPMENTPDF

链接地址:http://www.mydoc123.com/p-344748.html