1、中级系统集成项目管理工程师-专业英语(一)及答案解析(总分:98.00,做题时间:90 分钟)一、B单项选择题/B(总题数:3,分数:98.00)A project life cycle is a collection of generally sequential project _ whose name and number are determined by the control needs of the organization or organizations involved in the project. The life cycle provides the basic _
2、for managing the project, regardless of the specific work involveD.(分数:76.00)(1). A. phases B. processes C. segments D. pieces(分数:2.00)A.B.C.D.(2). A. plan B. fraction C. main D. framework(分数:2.00)A.B.C.D.(3).The project life-cycle can be described as_. A. project concept, project planning, project
3、execution, and project close-out B. project planning, work authorization, and project reporting C. project planning, project control, project definition, WBS development, and project termination D. project concept, project execution, and project reporting(分数:2.00)A.B.C.D.(4).The _ defines the phases
4、 that connect the beginning of a project to its enD. A. milestone B. schedule C. temporary D. project life cycle(分数:2.00)A.B.C.D.(5).The project maintains a current and approved set of requirements over the life of the project by doing the following: _ all changes to the requirements Maintaining the
5、 relationships among the requirements, the project plans, and the work products. A. Monitoring B. Managing C. Gathering D. Reducing(分数:2.00)A.B.C.D.(6)._ means that every project has a definite beginning and a definite end. A. Project phase B. Unique C. Closure D. Temporary(分数:2.00)A.B.C.D.(7)._ fro
6、m one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase. A. Deliverables B. Milestone C. Work D. Process(分数:2.00)A.B.C.D.(8)._ is ameasurable, verifiable work poduct such as specification feasibility study report, detail document, or working p
7、rototype. A. Deliverable B. Project charter C. Earned value D. Milestone(分数:2.00)A.B.C.D.(9)._ are individuals and organizations that are actively involved in the project, or whose interests may be affected as aresult of project execution or project completion; they may also exert influence over the
8、 project and its results. A. controls B. baselines C. project managers D. project stakeholders(分数:2.00)A.B.C.D.(10).The _ Process Group consists of the processes used to complete the work defined in the project management plan to accomplish the projects requirements. A. Planning B. Executing C. Moni
9、toring and Controlling D. Closing(分数:2.00)A.B.C.D.(11).Organizations perform work to achieve a set of objectives. Generally, work can becategorized as either projects or operations, although the two sometimes are _. A. confused B. same C. ovedap D. dissever(分数:2.00)A.B.C.D.(12).The inputs of develop
10、ing project management plan do not include _. A. project charter B. stakeholder management strategy C. project scope statement D. outputs from planning processes(分数:2.00)A.B.C.D.(13).The Develop Project Management Plan Process includes the actions necessary to define, prepare, integrate, and coordin
11、ate all constituent plans into a _. A. Project Scope Statement B. Project Management Plan C. Forecasts D. Project Charter(分数:2.00)A.B.C.D.(14).All of followings should be done by the project manager during project control except _ A. Determine the a change has occurred B. Ensure that a change is agr
12、eed C. Make sure all changes are approved by management D. Manage changes as they occur(分数:2.00)A.B.C.D.(15).The _ provides the project manager with the authority to apply organizational resources to project activities. A. project management plan B. project charter C. project human resource plan D.
13、project stakeholders(分数:2.00)A.B.C.D.(16).Most system development methodologies also provide _, whose purpose is to contain the various pieces of relevant information-feasibility assessments, schedules, needs analysis, and so forth-in a single place so that they can be presented to project clients a
14、nd other related parties. A. statement of work B. project planning C. baseline plan D. information system planning(分数:2.00)A.B.C.D.(17).Changes may be requested by any stakeholder involved with the project, but changes can be authorized only by _. A. executive IT manager B. project manger C. change
15、control board D. project sponsor(分数:2.00)A.B.C.D.(18).In the project management context, _ includes characteristics of unification, consolidation, articulation, and integrative actions that are crucial to project completion, successfully meeting customer and other stakeholder requirements, and manag
16、ing expectations. A. integration B. scope C. process D. charter(分数:2.00)A.B.C.D.(19)._ is primarily concerned with defining and controlling what is and is not included in the project. A. Project Time Management B. Project Cost Management C. Project Scope management D. Project Communications Manageme
17、nt(分数:2.00)A.B.C.D.(20).A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should _. A. assign change tasks to project members B. call a meeting of the configuration control board C. change the scope baseline D. po
18、stpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline(分数:2.00)A.B.C.D.(21).Which of the following Project Scope Management processes involves subdividing the major project deliverables into smaller, more manageable c
19、omponents? _. A. Scope Planning B. Scope Verification C. Scope Change Control D. Scope Definition(分数:2.00)A.B.C.D.(22).The work breakdown structure comprises several levels of decomposition of the total project. The lowest level of definition is always the _. A. planning element B. work package C. s
20、ubtask D. working interface(分数:2.00)A.B.C.D.(23).Project manager believes that modifying the project scope may provide added value for the customer. The project manager should _. A. change the scope baseline B. contact the customer to determine if the change adds value C. call a meeting of the chang
21、e control board D. change the projects objectives(分数:2.00)A.B.C.D.(24)._ describes, in detail, the projects deliverables and the work required to create those deliverables. A. Product scope description B. Project objectives C. Produce specification D, The project scope statement(分数:2.00)A.B.C.D.(25)
22、.To ensure the project team provide the functionality the customer expects in a new piece of software, the project manager asks the customer for sign-off on the design criteria. There documents are _. A. technical specifications B. performance specifications C. product descriptions D, quality assura
23、nce(分数:2.00)A.B.C.D.(26).The work that needs to be accomplished to deliver a product, service, or result with the specified features and functions is called _. A. Scope management B. Integrated management C. SOW D. PMO(分数:2.00)A.B.C.D.(27).Which of following is an important input to scope verificati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 计算机 职业资格 中级 系统集成 项目 管理 工程师 专业 英语 答案 解析 DOC