NAVY UFGS-46 43 21-2011 CIRCULAR CLARIFIER EQUIPMENT《圆形澄清器设备》.pdf
《NAVY UFGS-46 43 21-2011 CIRCULAR CLARIFIER EQUIPMENT《圆形澄清器设备》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-46 43 21-2011 CIRCULAR CLARIFIER EQUIPMENT《圆形澄清器设备》.pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-46 43 21 (February 2011)-Preparing Activity: NAVFAC Replacing without changeUFGS-44 42 23 (November 2009)UFGS-44 42 23 (April 2006) UFGS-11338 (August 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE
2、 OF CONTENTSDIVISION 46 - WATER AND WASTEWATER EQUIPMENTSECTION 46 43 21CIRCULAR CLARIFIER EQUIPMENT02/11PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 SUBMITTALS1.4 DELIVERY, STORAGE, AND HANDLING1.5 MANUFACTURERS REPRESENTATIVE1.6 POSTED OPERATING INSTRUCTIONS1.7 QUALITY ASSURANCE1.7.1 Dr
3、awing RequirementsPART 2 PRODUCTS2.1 CIRCULAR CLARIFIER, GENERAL2.2 CLARIFIER MECHANISM2.2.1 Design2.2.2 Sludge Collector Assembly2.2.2.1 Scraper Arms2.2.2.2 Center Drive Cage/Drum2.2.2.3 Center Shaft2.2.2.4 Rapid Sludge Removal System2.2.3 Drive Assembly2.2.3.1 Motor2.2.3.2 Speed Reduction and Turn
4、table Gearing2.2.3.3 Gearmotor2.2.3.4 Turntable Bearing Assembly2.2.3.5 Drive Assembly Bearings2.2.3.6 Chain Drives and Belt Drives2.2.4 Scum Removal Assembly2.2.4.1 Skimmer Assembly2.2.4.2 Scum Trough2.2.5 Center Column2.2.6 Access Bridge, Walkway, and Operating Platform2.2.7 Supporting BridgeSECTI
5、ON 46 43 21 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.8 Influent Well2.2.9 Influent Skirt2.2.10 Effluent Trough and Weir Assembly2.2.11 Electrical Control System2.2.11.1 Control System Enclosure2.2.11.2 Circuit Breakers2.2.11.3 Motor
6、Starter , Contactors, and Pushbutton Station2.2.11.4 Overload Protection and Alarm Device2.2.11.5 Wiring2.2.12 Lubrication Fittings2.2.13 Key Mounted Connections2.2.14 Weir Plates and Scum Baffles2.3 CLARIFIER PIPING2.3.1 Pipe and Fittings2.3.2 Sleeves and Wall Castings2.4 ANCHOR AND CONNECTING BOLT
7、S, NUTS, AND WASHERS2.5 FIBERGLASS REINFORCED PLASTIC2.6 GROUT MATERIALS2.7 SPARE PARTS2.8 TOOLS2.9 MATERIALS PROTECTIONPART 3 EXECUTION3.1 GENERAL3.2 SURFACING OF CLARIFIER TANK FLOOR3.3 PIPING3.4 WEIRS3.5 REPAIR PAINTING3.6 FIELD TESTS AND INSPECTIONS3.6.1 General3.6.2 Tests- End of Section Table
8、of Contents -SECTION 46 43 21 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-46 43 21 (February 2011)-Preparing Activity: NAVFAC Replacing without changeUFGS-44 42 23 (November 2009)UFGS-44 42 23 (April 200
9、6) UFGS-11338 (August 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 46 43 21CIRCULAR CLARIFIER EQUIPMENT02/11*NOTE: This guide specification covers the requirements for circular clarifier for use in sewage treatment plants.Adhere to UFC 1-
10、300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable i
11、tems(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOT
12、E: This guide specification is for treatment of domestic sewage only. Special consideration must be given to sewage containing industrial wastes.*NOTE: The following information shall be shown on the project drawings or provided by the project designer:1. Type of clarifier: primary or secondary2. Di
13、mensions of clarifier tank3. Whether clarifier is of center feed/peripheral overflow type or peripheral feed/center overflow typeSECTION 46 43 21 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4. Whether influent enters through side of tank or
14、 through center column when clarifier is center feed/peripheral overflow type5. Whether rapid sludge removal system is to be used and the number and size of the sludge uptake pipes6. Size of influent well when clarifier is center feed/peripheral overflow type7. Size and section of effluent trough wh
15、en clarifier is peripheral feed/center overflow type8. Size and section of weirs and baffles; and anchorage details9. Electrical characteristics for motor10. Sizes of piping, points of connection to plant piping, and types of joints for wall castings and sleevesNAVFAC Definitive Designs, P-272, draw
16、ing number 1402886, “Primary and Final Settling Tanks, Circular up to 11 m 35 Feet Diameter“ and 1402887, “Primary and Final Settling Tanks, Circular More Than 11 m 35 Feet Diameter“ show the general layout and arrangement of components and may be used as design guides.This guide specification may b
17、e used to prepare specifications for either primary or secondary clarifiers; where both are used on a project, a separate section should be prepared for each type.*NOTE: Reliability and Maintainability (RAM) Data: A survey by the Naval Facilities Engineering Service Center (NFESC) collected RAM data
18、 on 278 collectors at 134 plants nationwide. The report of survey contains general statistical data rating manufacturers equipment in terms of the average time of operation between breakdowns. Information included in the report may be obtained by calling Dr. D. B. Chan, DSN 551-4191, or commercial (
19、805) 982-4191; or by writing to: Commanding Officer, Naval Facilities Engineering Service Center, Code 411, 560 Center Drive, Port Hueneme, CA 93043-4328.*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the SECTION 46 43 21 Page 4Provided by IHSNot for ResaleNo reproduction or netw
20、orking permitted without license from IHS-,-,-publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature
21、 when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project
22、 specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ALUMINUM ASSOCIATION (AA)AA DAF-45 (2003; Reaf
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS4643212011CIRCULARCLARIFIEREQUIPMENT 圆形 澄清 设备 PDF

链接地址:http://www.mydoc123.com/p-984876.html