NAVY UFGS-08 34 19 10 20-2012 ROLLING SERVICE [AND FIRE] DOORS《旋转[和防火]门》.pdf
《NAVY UFGS-08 34 19 10 20-2012 ROLLING SERVICE [AND FIRE] DOORS《旋转[和防火]门》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-08 34 19 10 20-2012 ROLLING SERVICE [AND FIRE] DOORS《旋转[和防火]门》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-08 34 19.10 20 (February 2012)-Preparing Activity: NAVFAC SupersedingUFGS-08 34 19.10 20 (April 2006)UFGS-08331N (February 2004)UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated January 2012*SECTION TABLE OF CONTENTSDIVISION 08 - O
2、PENINGSSECTION 08 34 19.10 20ROLLING SERVICE AND FIRE DOORS02/12PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 DELIVERY AND STORAGEPART 2 PRODUCTS2.1 ROLLING SERVICE DOORS2.1.1 Operational Cycle Life2.2 FABRICATION2.2.1 Curtains2.2.2 Endlocks and Windlocks2.2.3 Bottom Bar2.2.4 Guides2.2.5 Barrel2.2.6
3、 Brackets2.2.7 Hoods2.2.8 Locking Device2.3 MANUAL OPERATION2.3.1 Manual Push-Up Operation2.3.2 Manual Hand-Chain Operation2.3.3 Manual Crank Operation2.4 ELECTRIC OPERATION2.4.1 Operator Features2.4.2 Motors2.4.3 Controls2.4.4 Safety Device2.4.5 Control Power Supply2.4.6 Electrical Work2.4.7 Hazard
4、ous Locations2.5 FINISHES2.5.1 Primed Finish2.5.2 Galvanized and Shop-Primed Finish2.6 ROLLING FIRE DOORSSECTION 08 34 19.10 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 3 EXECUTION3.1 INSTALLATION3.2 FINAL ADJUSTMENT- End of Section
5、 Table of Contents -SECTION 08 34 19.10 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-08 34 19.10 20 (February 2012)-Preparing Activity: NAVFAC SupersedingUFGS-08 34 19.10 20 (April 2006)UFGS-08331N (Fe
6、bruary 2004)UNIFIED FACILITIES GUIDE SPECIFICATIONReferences are in agreement with UMRL dated January 2012*SECTION 08 34 19.10 20ROLLING SERVICE AND FIRE DOORS02/12*NOTE: This guide specification covers the requirements for rolling service doors, rolling fire doors and minimum glazing requirements f
7、or antiterrorism force protection (ATFP) in accordance to UFC 4-010-01, “DoD Minimum Antiterrorism Standards for Buildings“.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edi
8、t this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments,
9、suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: On the drawings, show:1. Locations and sizes of door openings2. Side of wall where door is to be located3. Details of door openings and frames4. Method, type
10、, and spacing of frame anchors5. Electrical wiring, conduit, and devices for motor-operated doors; power characteristics; and location of controlsSECTION 08 34 19.10 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*PART 1 GENERAL1.1 REFERENC
11、ES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature w
12、hen you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project s
13、pecification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.ASTM INTERNATIONAL (ASTM)ASTM A123/A123M (2009)
14、Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel ProductsASTM A653/A653M (2011) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip ProcessASTM A780/A780M (2009) Standard Practice for Repair of Damage
15、d and Uncoated Areas of Hot-Dip Galvanized CoatingsASTM E84 (2011b) Standard Test Method for Surface Burning Characteristics of Building MaterialsDOOR AND ACCESS SYSTEM MANUFACTURERS ASSOCIATION (DASMA)ANSI/DASMA 108 (2005) Standard Method for Testing Sectional Garage Doors and Rolling Doors: Determ
16、ination of Structural Performance Under Uniform Static Air Pressure DifferenceSECTION 08 34 19.10 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA ICS 1 (2000; R 2005; R 2008) Standard
17、for Industrial Control and Systems: General RequirementsNEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 VNEMA ICS 6 (1993; R 2011) EnclosuresNEMA MG 1 (2009) Motors and GeneratorsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 70 (2011; TIA
18、11-1; Errata 2011; TIA 11-2; TIA 11-3; TIA 11-4) National Electrical CodeNFPA 80 (2010; TIA 10-2) Standard for Fire Doors and Other Opening Protectives1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect on
19、ly the submittals required for the project.The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a “G“. Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add
20、a “G” to an item, if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. C
21、odes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typic
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS08341910202012ROLLINGSERVICEANDFIREDOORS 旋转 防火门 PDF

链接地址:http://www.mydoc123.com/p-984737.html