1、MIL-S-5307 13 m 97777Ub 0439037 b I 6 MIL-S-85309(AS) . .- -6 3 January 1980 MILITARY SPECIFIC AT10 N Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: C-ommanding Officer, Naval Air Engineering C
2、enter, Engineering Specifications and Standards Department (ESSD), Code 93, Lakehurst, NJ 08733, by using the self-addrewed Standardization Document Improvement Proposal (DD form 1426) appearing at the end of this document, or by letter. - SQUIB, ELECTRIC, SINGLE BRIDGEWIRE This specification is app
3、roved for use by Naval Air Systems Command, Depart- ment of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE. 1.1 Scope. This specification establishes the requirements for manufacture and acceptance of a single bridgewire electric squib, refe
4、rred to herein as the squib. 2. APPLICABLE DOCUMENTS. 2.1 Issues of documents. The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this speci- fication to the extent specified herein. SPECIFICATIONS MILITAR Y M 1L-I- 2 3 6 5 9 initfa
5、tor, Electric, Design and Evaluation of MIL-C-45662 Calibration System Requirements. _. Licensed by Information Handling ServicesMIL-S-5309 L3 9999906 0434038 I 1 M IL-S-85309(AS) c STANDARDS FEDERAL F ED-STD-1 O 2 MILITARY MIL-STD-1 O 5 MIL-STD-129 M IL-STD-2 02 MIL-STD-331 MIL-STD-810 MIL-STD-831
6、DRAWINGS Naval Air Systems Command (Code Ident 30003) 1137AS225 OTHER PUBLICATIONS Naval Sea Systems Command (Code Ident 53711) NAVORD Report 2101 Preservation, Packaging, and Packing Levels. Sampling Procedures and Tables for inspection by Attributes. Marking for Shipment and Storage. Test Methods
7、for Electronic and Electrical Compo,nent Parts. Fuze and Fuze Components, Environmental and Performance Tests for. Environmental Test Methods. Test Reports, Preparation of. Squib, Electric, Single Bridgewire. Statistical Method Appropriate for Evaluation for Fuze Explosive Train and Reliability. (Co
8、pies of specifications, standards, drawings, and publications required by contractors in connection with specified procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2 Other publications. The following document forms a part of this spec
9、ification to the extent specified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids or request for proposal shall apply. 2 Licensed by Information Handling ServicesMIL-S-85309 13 W 997990b O434039 T I 1 MIL-S-85309(AS) U CODE OF FEDERAL REGULATIONS 49 CFR 171-178
10、 Transportation. (Application for copies should be addressed to the Superintendent of Documents, Government Printing Office, Washington, D.C. 20402.) 3. REQUIREMENTS. 3.1 Item definition. The squib is an electrically initiated pyrotechnic device designed to function as the first element in the firin
11、g train of a rocket motor. The squib is a single bridgewire type, Class A, as defined in MIL-1-23659. 3.2 Characteristics. 3.2.1 Performance. 3.2.1.1 Electrical. 3.2.1.1.1 Electrostatic discharge. The squib shall not function when sub- Dieletric strength. The squib shall not function with the appli-
12、 jected to an electrostatic discharge of 25,000 I500 volts (V). cation of 500 225 volts direct current (Vdc) between the shorted leads and the case for 60 seconds (s) minimum. 3.2.1.1.2 3.2.1.1.3 Bridgewire sensitivity. The squib shall not function with the appli- cation of 1 ampere direct current (
13、Adc) applied through the leads for 5 minutes over a temperature range from -80 to +200 degrees Fahrenheit (OF). 3.2.1.1.4 3.2.1.2 - Seal. The leak rate of the squib shall not exceed 1 x Bridgewire resistance. Squib bridgewire resistance shall be 1.0 50.1 ohm. atmospheric cubic centimeters per second
14、 (std atm cm 3/s) with one atmosphere differential pressure. standard 3.2.1.3 Radiographic. The squib shall show no evidence of loose powder, voids, or fissures in the charge or insulators. 3.2.1.4 Function. 3.2.1.4.1 All-fire sensi t ivit y. 3.2.1.4.1.1 All-fire, 3 amperes (A). The squib shall func
15、tion with the appli- cation of 3.0 kO.1 A to the leads, and shall produce a pressure output of 170 pounds per square inch (lb/in 2, in a 5 cubic centimeter (cm 3) pressure vessel within 5 milliseconds (ms) maximum after fire switch closure. Licensed by Information Handling ServicesM IL-S-85309( AS)
16、3.2.1.4.1.2 All-fire Bruceton. The squib shall have a calculated 3 A maximum, 3.2.1.4.2 No-f ir e sensit ivit p. 3.2.1.4.2.1 No-fire, 1 A/1 Watt (W), 5 minutes.) The squib shall not function with the application of 1 A of current and an associated power of 1 W minimum to the leads for 5 minutes mini
17、mum. 3.2.1,4.2.2 No-fire Bruceton. The squib shall have a calculated 1 A minimum, 1.0 percent no-fire point with a 95 percent confidence level. 3.2.2 Environmental. The squib shall not be damaged, nor shall safety or subsequent performance be degraded, by exposure to any natural combination of servi
18、ce use environments. These shall include, but shall not be limited to, the following environments. Test 103, Procedures 1 and 2, and shall be safe to handle and dispose of following the test. 3.2.2.2 Shock. The squib shall meet the shock requirements of MIL-1-23659, and shall function and output as
19、specified in 3.2.1.4.1.1 following the test. 3.2.2.3 Temperatur e-shock/humidit y/aiti tude. The squib shall meet the temperature-shock/humidity/altitude requirements of MIL-1-23659, and shall function and output as specified in 3.2.1.4.1.1 following the test. 3.2.2.4 Vibration. The squib shall meet
20、 the requiremnts of MIL-STD-810, Method 514.2, Procedure V, Part 2, Curve AH, and shall function and output as specified in 3.2.1.4.1.1 following the test. of MIL-1-23659, and shall function and output as specified in 3.2.1.4.1.1 following the test. 99 percent all-fire point with a 95 percent confid
21、ence level. 3.2.2.1 Forty-foot droe. The squib shall meet the requirements of MIL-STD-331, 3.2.2.5 Six-foot drop. The squib shall meet the six-foot drop requirements 3.3 Design and construction. 3.3.1 Production drawings. The squib shall be manufactured and assembled in accordance with Drawing 1137A
22、S225 and as specified herein. 3.3.2 Standards of manufacture. The squib shall be manufactured, inspected, and tested to meet the requirements specified herein. 3.3.3 Workmanshie. The requirement for first class workmanship shall not preclude the use of time- and labor-saving techniques, provided tha
23、t reliability and safety will in no way be jeopardized. 3.3.4 Test equipment calibration. Test equipment shall be calibrated and main- tained in accordance with a plan meeting the requirements of MIL-C-45662. When c specified in the contract or purchase order, the calibration plan shall be approved
24、by the Government prior to use (see 6.2.2). 4 Licensed by Information Handling ServicesMIL-S-85309 13 W 9797906 Oq3L1041 8 I MIL-S-85309( AS) 3.3.5 Test plan and test procedures. When specified in the contract or purchase order, the contractor shall prepare and submit to the Government for approval
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILS853091980SQUIBELECTRICSINGLEBRIDGEWIRE 单桥电 点火器 PDF

链接地址:http://www.mydoc123.com/p-981789.html