NAVY MIL-S-17849 E (2)-1995 STRAINERS SEDIMENT PIPELINE DUPLEX (WITH AND WITHOUT MAGNET)《全双工(和无磁铁)管道沉积物张紧器》.pdf
《NAVY MIL-S-17849 E (2)-1995 STRAINERS SEDIMENT PIPELINE DUPLEX (WITH AND WITHOUT MAGNET)《全双工(和无磁铁)管道沉积物张紧器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-S-17849 E (2)-1995 STRAINERS SEDIMENT PIPELINE DUPLEX (WITH AND WITHOUT MAGNET)《全双工(和无磁铁)管道沉积物张紧器》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-S-l7849E(SH) AMEHDMENT 2 22 June 1995 SOPEESEDIAXG HILITARY SPECIFICATION This STATEMENT A. Approved for public rrleasc; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MfL-S-l7849E(SH) AMEMDMENT 2 A 36 - Standard Speci
2、fication for Structural Steel. A 105 - Standard Specification for Forgings, Carbon Steel, for Piping A i06 - Stanciard Specifiatin far Smless Carboa Steel. Pipe Eigh A 285 - Standard Specification or Pressure Vessel Plates, Carbon Steel A 513 - Standard Specification for Electric Reeistsnce Welded C
3、arbon and A 516 - Standard Specification for Pressure Vessel Plates, Carbon Steel, Components. Temperature Service. Lou and Intermediate Tensile Strength. Alloy Steel Mechanical Tubing. for Moderate and Lower-Temperature Service. A 515 - q)ecifisatisR EU “7 “- “L“ DGUUCIJ bULUUl4 A:oT St=: ? Delete
4、and substitute: - Examination and Tests First article Quality Conformance POST-FOUNDRY PRODUCTION: Pilot Pressure Boundary Casting 4.7.11 -“ PRODUCTION: r 1 Eramina t ion 4+6 4.6 Shock 4.7.5 C“ Hydrostatic 4.7.1 4.7.1 1 Tightness (leakage) 4.7.2 4.7.2 Torque i 4.7.2.1 4.7.2.1 Operating Capacity 4.7.
5、3 -c- Pres sure Drop 4.7.4 “C Spray Deflector 4.7.7 “ Safety Interlock 4.7.9 4.7.9 Equalizing Flow Rate 4.7.13 4.7.13 Operational Cycling 4.7.12 -“ , Basket Tests: TABLE YI: Delete Maximum particle passedn and substitute “Filtration ratio Filter element efficiency)“. 7 Provided by IHSNot for ResaleN
6、o reproduction or networking permitted without license from IHS-,-,-MIL-S-l7844E(S?A) AMEMDMENT 2 PAGE 19 4.7.1: Delete end subsritute: “The test shall be an internal pressure test with water or system fluid at B viscosity aquivalenet to water. Where water is detrimental to the unit being tested. co
7、rrosion ihhibitors shall be added. Fach completely assembled strainer shall be “TGFted to a pressure equal to 150 percent of the design pressure for a duration of 60 minutes. Dbring this test, the changeover valve shall be positioned tQ allow flow to both basket compartments. Strainers not mintaizin
8、g zero leakage shall be rejected. 4.7.2: Delete .first sentence and substitute: “Each strainer shall be teated for a duration of 30 minutes to verify the seal tightness for each valve seat of the 3-way changeover valve at 100 percent of design pressure using test fluid a6 specified in 4.7.3. 1.7.3:
9、Add after first sentence: LUhen specified (see 6.21. a range of pressure drops at specified operating conditions (see 6.2) shall be developed.“ PAGE 20 Add new paragraph 4.3-1: “4.3.1 Assembly dravfnq. Assembly drawings shall be furnished with each RW filter basket assembly submitted far first artic
10、le tests. Prior to authorization for first article testing, two sets of assembly drawings, in accordance with MIL-STD-loo, shall be furnished with each new model filter basket assembly submitted for first article tests. Assembly drawing shall show a cutaway sectian of details in their noml assembly
11、positions and shall carry part numbers of details and eubassemblies. The following data shall be furnished on or together with, the assembly drawings: la) Outline dimensions of the cornplete assenMy. (b) Bill of material, listing specifications grade and condition Dr other c) General nates stating c
12、omplete performance data including rated flow data needed to identify the material proposed. capacity, pressure drop data, pressure rating, filtration rating, and dirt holding capacity. filter element drawings shall include a CrO6S-sectional view with each individual components identified. Proprieta
13、ry information, auch as number of equare inches of media or composftion of media is not required (d) Unless such information is provided in the first article test report, Dimensioning and tolerance on drawing shall be in accordsnce with ANSI Y14.5.“ 4.7.61 Delete two places “basket“ and substitute “
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILS17849E21995STRAINERSSEDIMENTPIPELINEDUPLEXWITHANDWITHOUTMAGNET 双工 磁铁 管道 沉积物 张紧器 PDF

链接地址:http://www.mydoc123.com/p-981506.html