NAVY MIL-R-85545 B-1990 ROCKET GTR-18A《GTR-18A火箭》.pdf
《NAVY MIL-R-85545 B-1990 ROCKET GTR-18A《GTR-18A火箭》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-85545 B-1990 ROCKET GTR-18A《GTR-18A火箭》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-R-85545B 33 W 9797906 0463909 7 W . -i - I INCH-POUND I MIL-R-85545B(AS) 30 November 1990 SUPERSEDING 4 April 1986 MIL-T-85545A(AS) MILITARY SPECIFICATION ROCKET, GTR-18A This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by
2、 all Departments and Agencies of the Department of Defense. 1. SCOPE 1 . 1 Scope. Thl s spec! fl cati on establ i shes the requi rements for the manufacture and inspection of the GTR-18A rocket referred to herein as the rocket. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1 . 1 Sgeci fi catio
3、ns. standards. and handbooks. The fol 1 owl ng specifications, standards, and handbooks form a part of this document to the extent spec! fi ed here1 n. documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (BODPSS) and supplement thereto, cited in
4、 the solicitation (see 6.2). Un1 ess otherwi se apeci fied, the l ssues of these SPECIFICATIONS MILITARY MIL-1-85549 STANDARDS MILITARY MIL-STB-129 MI L-SPB-81 O Envi ronmental Test Methods and Engineering MI L-STB-1169 Ammuni %ion Data Card MI L-STD-1168 Marking for Shipment and Storage Gui del i n
5、es Atnmunl ti on Lot Number! ng Igniter, PVU-3A/E and PVU-3B/E Beneficial comments (recommendations, addl ticans, deletions) and any pertinent data whlch may be of use ln improving this document should be addressed to: Naval A4 r Eng! neeri ng Center, Systems Eng1 neeri ng and Standardization Depart
6、ment. (Code 531, bakekurst, NJ 08933-5900, by using the Standardization Document Improvement Proposal (DB Form 1426) appearing at the end of this document or by letter. AMSC N/A FSC 1370 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Licensed by Information Handlin
7、g ServicesMI L-R-85545B(AS) (Unless otherwise indicated, copies of federal and military specifications, c tandards, and handbooks are avai 1 ab1 e from the Standardization Documents Order Desk,Building 4D, 700 Robbins Avenue, Philadelphia, Pa 1911-5094, 2.1 .2 Other Government documents, drawi nqs ,
8、 and pub1 i cations. The fol lowi ng Unless otherwise specified, the issues other Government documents, drawings, and publications form a part of this document to the extent specified herein. are those cited in the solicitation. DRAW I NGS NAVAL AIR SYSTEMS COMMAND (NAVAIR) (CAGE Code 30003) 1335AS2
9、75 1335AS280 1335AS285 1335AS289 1335AS290 1335AS380 1335AS390 1335AS700 Igni ter, PVU-3A/E Rocket, GTR-18A Decal, GTR-18A Smokey Sam Rocket Shipping Condi tion Packaging Assembly Launcher, Rocket LMU-23AIE Simulator, Surface-to-Air Missile SMU-l24/E (Smokey SAM Simulator) Launcher, Rocket LMU-24A/E
10、 (Un1 ess otherwi se indicated, Copi es of Naval Air Systems Command drawings are available from the Naval Air Technical Services Facility (NATSF) (Code 312) , 700 Robbins Avenue, Philadelphia, Pa 19111-5096. ) PUBLI CATIONS CODE OF FEDERAL REGULATIONS 49 CFR 100-1 99 Transportati on (Copies are ava
11、ilable from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402-0001 .) NAVAL AIR SYSTEMS COMMAND 1 1-75-63 Techni cal Manual for LMU-23A/E and LMU-24A/E (Copies are available from the Naval Publications and Forms Center (Code lOSl), 5801 Tabor Avenue, Philadelph
12、ia, PA 19111-5099,) 2.2 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. regulations unless a specific exemption has been obtained. Nothing in thi s document, however, supersedes appl i cab1
13、 e laws and 3. REQUIREMENTS 3.1 First article. When specified (see 6.21, a sample shall be subjected to first article inspection (see 6.4) in accordance with 4.4. 3.2 Desiqn and construction. accordance with Drawing 1335AS280. rocket, see Drawing 1335AS390. The rocket shall be fabricated and assemb
14、For the smokey SAM simulator, uti 1 izing 2 ed in the Licensed by Information Handling ServicesMIL-R-S5LI5B 13 I 77977Ob OLibLSLL 5 I f MI L-R-85545 B (AS 3.3 Environmental conditioninq. The rocket shall withstand exposure to vibration and shock without performance failure (see 4.6.2 and 4.6.3). 3.4
15、 Performance. The rocket shall meet the following requirements when launched at an angle of 80“ or 85“ (see 4.6.4): a. The rocket shall expel a visible flame and white smoke plume during powered flight (see 6.5.1). b. The rocket shall not impact the ground during powered flight. c. The rocket shall
16、attain an altitude of 1500 tl 500 ft. above launcher. 3.5 Marking. In addition to any special or other identification required by the contract (see 6.21, rockets shall be marked with lot numbers (see 4.5.3) on the designated area of the rocket decal, Drawing 1335AS285. 3.6 Data cards. Data cards sha
17、ll be prepared in accordance with MIL-STD-1167 and shall be furnished with each rocket lot (see 4.5.2). 3.7 WorkmanshiD. Workmanship and finish shall be in accordance with the highest grade practice used in manufacturing military weapons. Finished items and parts shall not exhibit poor material and
18、processing such as seams, laps, 1 ami nations, cracks, vi si ble steps, sharp edges, nicks, scratches, burrs, deformations, and missing operations which may affect serviceability, functioning, operation appearance, or safety. grease or any other foreign matter. materi al s on al 1 external surfaces.
19、 No part or assembly shall contain chips, dirt, 0 The rocket shall be free from explosive 4. QUALITY ASSURANCE PROVISIONS 4.1 Reseonsi bi 1 i ty for i nseection. Unless otherwi se specified in the contract or purchase order, the contractor is responsible for the performance of all inspection require
20、ments (examinations and tests) as specified herein. otherwise specified in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified here! n, unless di sapproved by the Government. Government reserves
21、the right to perform any of the inspections set forth in this specification where such inspections are deemed necessary to ensure suppl les and servi ces conform to prescribed requirements, Except as The 4.1.1 Reseonsi bi 1 i ty for compl lance. Al 1 i tems shall meet al 1 requi rements of section 3
22、 and 5. The inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsi bi 1 i ty of ensuring that al 1 products or sup
23、plies submitted to the Government for acceptance comply with all requirements of the contract. Sampling inspection, as part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, thi s does not authorize submission of known defective material, eithe
24、r indicated or actual, nor does it commit the Government to acceptance of defective material. 4.2 Classification of inspections. The inspection requirements specified herein are classified as follows: 3 Licensed by Information Handling Servicest . Cumulative Sample Sample size sample size Accept lot
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR85545B1990ROCKETGTR18AGTR18A 火箭 PDF

链接地址:http://www.mydoc123.com/p-981447.html