NAVISTAR TMS 9545-2013 Cab Leakage - Testing Requirements.pdf
《NAVISTAR TMS 9545-2013 Cab Leakage - Testing Requirements.pdf》由会员分享,可在线阅读,更多相关《NAVISTAR TMS 9545-2013 Cab Leakage - Testing Requirements.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、This document is restricted and may not be sent outside International Truck and Engine Corporation or reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2013 by Navistar Inc. APRIL 2013 Page 1 of 5 NAVISTAR INC. TMS (TRUCK MATERIA
2、L SPECIFICATION) NUMBER: TMS-9545 TITLE: Cab Leakage Testing Requirements CURRENT REV No.: 1304 DATE: APRIL 2013 WRITTEN/EDITED BY: Materials Engineering APPROVED BY: Materials Engineering SUPERSEDES: August 2007 REV. C PRINTED COPIES OF THIS DOCUMENT MUST BE VERIFIED FOR CURRENT REVISION This speci
3、fication may involve hazardous materials, equipment, and procedures. This specification does not purport to address all of the safety issues associated with its use. The user is responsible to consult appropriate safety and health practices and to determine the applicability of regulatory limits pri
4、or to use. Change Notice: Water Leak Test Parameters Reference: File 30-1 Keywords: Leakage Requirements; Cab Leakage 1.0 APPLICATION This specification describes engineering requirements for the performance of air and water leakage testing of finished cabs assembled onto chassis. 2.0 SCOPE This spe
5、cification covers equipment and general testing procedures, repair procedures, and reporting of tests results. 2.1 Restricted Chemical Substances Effective January 1, 2007, all product supplied to the requirements of this specification must comply with the requirements of the CEMS B-50 specification
6、. 3.0 REFERENCE DOCUMENTS Unless otherwise specified, the latest issue of all referenced standards shall apply. The following standards, specifications and regulations are referenced in this specification. Quality System Standard ISO 9001 or TS-16949 NAVISTAR TMS-9543 NAVISTAR CEMS B-50 CFR Title 29
7、, Part 1910 NAVISTAR Manufacturing Standard D-13 4.0 GENERAL REQUIREMENTS Many methods of body leak detection are available. Two commonly used at Navistar facilities are listed below. All test methods suffer from various levels of test errors. Air leak methods have a tendency to have a high false-po
8、sitive rate shows more leaks than would be noticeable in use. And water leak methods suffer high false-negatives does not show leaks that can occur in the field. It is important that leaks are thoroughly investigated during development and corrected. It is also important that production processes ar
9、e regularly tested and monitored and that leaks identified are quickly communicated to parties responsible for correcting them. NUMBER: TMS-9545 TITLE: Cab Leakage Testing Requirements REVISION: 1304 This document is restricted and may not be sent outside International Truck and Engine Corporation o
10、r reproduced without permission from Corporate Technical Standards. Suppliers are required to assume all patent liability. 2013 by Navistar Inc. APRIL 2013 Page 2 of 5 4.1 Air Leak Test Method 4.1.1 Equipment 4.1.1.1 Blower motor calibrated on a flow bench, certified by Navistar Engineering, with an
11、 air flow rate vs voltage calibration curve at 0.25 kPa (1.0 inch water) pressure. 4.1.1.2 A window mounting plug suitable for the body being tested. It shall have a sealed mounting for the blower scroll and a pressure port. 4.1.1.3 A variable voltage, DC power source. 4.1.1.4 A digital voltmeter, a
12、ccurate to 0.01 volts in the range of 1 - 20 volts. 4.1.1.5 A pressure transducer with a digital readout, accurate to 0.0025 kPa (0.01 inches of water) at 0.25 kPa (1.0 inches) of water. 4.1.1.6 A solution of water and liquid detergent of approximately 20:1. 4.1.1.7 A suitable liquid spray apparatus
13、. 4.1.1.8 A vehicle diagram or picture for that cab model tested, showing exterior surfaces with seams and joints. 4.1.1.9 Masking tape. 4.1.1.10 A camera. 4.1.2 Procedure 4.1.2.1 Mount plug, blower and pressure transducer into door window opening. 4.1.2.2 Seal the mounting with the masking tape. 4.
14、1.2.3 Close the fresh air duct and check all other windows and vents to be sure that they are closed. 4.1.2.4 Turn on blower and adjust voltage to obtain a stable 0.25 kPa (1.0 inch of water) pressure. 4.1.2.5 Measure and record the voltage (initial) applied to the blower (measure at the blower). 4.
15、1.2.6 Spray exterior seams and joints with the water and detergent solution. 4.1.2.7 Record on the vehicle diagram areas where bubbles are generated and document with photograph. 4.1.2.8 Based on the rate of bubble generation, note whether each leak is minor, significant, or major. 4.1.2.9 Repair si
16、gnificant and major leak points to the extent practical and readjust blower voltage to obtain a stable reading of 0.25 kPa (1.0 inch of water) pressure and record voltage. (Use tape for test purposes and after test is complete, make permanent repairs.) 4.1.2.10 Report results of testing. Acceptant C
17、riteria = Reference applicable DRD for acceptance criteria. NUMBER: TMS-9545 TITLE: Cab Leakage Testing Requirements REVISION: 1304 This document is restricted and may not be sent outside International Truck and Engine Corporation or reproduced without permission from Corporate Technical Standards.
18、Suppliers are required to assume all patent liability. 2013 by Navistar Inc. APRIL 2013 Page 3 of 5 4.1.3 Air Leak - Test Report A report will be prepared, following the format described in TMS-9543, and submitted to engineering for inclusion in the engineering tracking system. (See Test Report Sect
19、ion). 4.2 Water Leak Test Method The water leak test should be performed on a regular basis to ensure that changes to the sealing processes do not create water leaks which may not be readily detected by the air leak test. It should also be used on units and/or in cases that require more extensive re
20、pair work as identified by the air leak test. 4.2.1 Equipment 4.2.1.1 Water test facility - The test facility may be set up differently at each assembly plant. The facility must be capable of applying large quantities of water over the entire exterior surface of the cab. The facility must be capable
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVISTARTMS95452013CABLEAKAGETESTINGREQUIREMENTSPDF

链接地址:http://www.mydoc123.com/p-963754.html