NACE SP0109-2009 Field Application of Bonded Tape Coatings for External Repair Rehabilitation and Weld Joints on Buried Metal Pipelines (Item No 21143)《埋设钢管外部维修 修复和焊接接头用胶粘带涂层的现场涂覆 .pdf
《NACE SP0109-2009 Field Application of Bonded Tape Coatings for External Repair Rehabilitation and Weld Joints on Buried Metal Pipelines (Item No 21143)《埋设钢管外部维修 修复和焊接接头用胶粘带涂层的现场涂覆 .pdf》由会员分享,可在线阅读,更多相关《NACE SP0109-2009 Field Application of Bonded Tape Coatings for External Repair Rehabilitation and Weld Joints on Buried Metal Pipelines (Item No 21143)《埋设钢管外部维修 修复和焊接接头用胶粘带涂层的现场涂覆 .pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、 Standard Practice Field Application of Bonded Tape Coatings for External Repair, Rehabilitation, and Weld Joints on Buried Metal Pipelines This NACE International standard represents a consensus of those individual members who have reviewed this document, its scope, and provisions. Its acceptance d
2、oes not in any respect preclude anyone, whether he or she has adopted the standard or not, from manufacturing, marketing, purchasing, or using products, processes, or procedures not in conformance with this standard. Nothing contained in this NACE International standard is to be construed as grantin
3、g any right, by implication or otherwise, to manufacture, sell, or use in connection with any method, apparatus, or product covered by Letters Patent, or as indemnifying or protecting anyone against liability for infringement of Letters Patent. This standard represents minimum requirements and shoul
4、d in no way be interpreted as a restriction on the use of better procedures or materials. Neither is this standard intended to apply in all cases relating to the subject. Unpredictable circumstances may negate the usefulness of this standard in specific instances. NACE International assumes no respo
5、nsibility for the interpretation or use of this standard by other parties and accepts responsibility for only those official NACE International interpretations issued by NACE International in accordance with its governing procedures and policies which preclude the issuance of interpretations by indi
6、vidual volunteers. Users of this NACE International standard are responsible for reviewing appropriate health, safety, environmental, and regulatory documents and for determining their applicability in relation to this standard prior to its use. This NACE International standard may not necessarily a
7、ddress all potential health and safety problems or environmental hazards associated with the use of materials, equipment, and/or operations detailed or referred to within this standard. Users of this NACE International standard are also responsible for establishing appropriate health, safety, and en
8、vironmental protection practices, in consultation with appropriate regulatory authorities if necessary, to achieve compliance with any existing applicable regulatory requirements prior to the use of this standard. CAUTIONARY NOTICE: NACE International standards are subject to periodic review, and ma
9、y be revised or withdrawn at any time in accordance with NACE technical committee procedures. NACE International requires that action be taken to reaffirm, revise, or withdraw this standard no later than five years from the date of initial publication. The user is cautioned to obtain the latest edit
10、ion. Purchasers of NACE International standards may receive current information on all standards and other NACE International publications by contacting the NACE International FirstService Department, 1440 South Creek Dr., Houston, Texas 77084-4906 (telephone +1-281-228-6200). Approved 2009-11-08 NA
11、CE International 1440 South Creek Drive Houston, Texas 77084-4906 +1 281-228-6200 ISBN: 1-57590-234-6 2009, NACE International NACE SP0109-2009Item No. 21143SP0109-2009 NACE International i _ Foreword This NACE standard practice provides the most current technology and industry practices for materia
12、l requirements and the use of field-applied tape coatings for external repair, rehabilitation, and weld joints on buried metal pipelines. This standard is intended for use by corrosion control personnel, design engineers, project managers, purchasing personnel, and construction engineers and manager
13、s. It is applicable to underground metal pipelines in the oil and gas gathering, distribution, and transmission industries as well as water and wastewater pipelines. This standard was prepared by NACE Task Group (TG) 251, “Coatings, Tape for External Repair, Rehabilitations, and Weld Joints on Pipel
14、ines.” This TG is administered by Specific Technology Group (STG) 03, “Coatings and Linings, Protective: Immersion and Buried Service.” It is sponsored by STG 04, “Coatings and Linings, Protective: Surface Preparation,” and STG 35, “Pipelines, Tanks, and Well Casings.” This standard is issued by NAC
15、E International under the auspices of STG 03. In NACE standards, the terms shall, must, should, and may are used in accordance with the definitions of these terms in the NACE Publications Style Manual. The terms shall and must are used to state a requirement, and are considered mandatory. The term s
16、hould is used to state something good and is recommended, but is not considered mandatory. The term may is used to state something considered optional. _ SP0109-2009 ii NACE International _ NACE International Standard Practice Field Application of Bonded Tape Coatings for External Repair, Rehabilita
17、tion, and Weld Joints on Buried Metal Pipelines Contents 1. General 1 2. Definitions 1 3. Bonded Tape Coating Systems 2 4. Tape Coating Materials for Field Coating Systems . 4 5. Cold-Applied Tape Coatings with Tension, Field Applied, Bonded Multilayer 12 6. Common Guidelines for Tape Coating Materi
18、als 14 7. Tape Coating SystemPipe Section and Weld Joint Tape Coating System Performance 15 8. Pipe Section and Weld Joint Tape Coating SystemSurface Preparation of Pipe . 16 9. Pipe Section and Weld Joint Tape Coating SystemCoating Application . 17 10. Pipe Section and Weld Joint Tape Coating Syste
19、mInspection, Repair, and Handling 19 References 20 TABLES Table 1: Tapes and Application . 3 Table 2: Accessory Materials . 4 Table 3: Hot-Applied Tape System Requirements . 7 Table 4: Hot-Applied Tape Liquid Adhesive or Primer Requirements 7 Table 5: Liquid Adhesive (Primer) Materials Requirement .
20、 8 Table 6: Cold-Applied Laminate Polymeric Tape Requirements 8 Table 7: Liquid Adhesive (Primer) Requirements . 11 Table 8: Reinforced Polymeric Tape Material Requirements . 11 Table 9: Optional Unbonded Outer-Layer Material Requirements . 11 Table 10: Cold-Applied Thin Backing Polymeric Tape Liqui
21、d Adhesive Requirements . 12 Table 11: Cold-Applied Thin Backing Polymeric Tape System Requirements . 12 Table 12: Liquid Adhesive (Primer) Material Requirements . 13 Table 13: Pipeline Section and Weld Joint Inner-Layer Tape Material Requirements . 13 Table 14: Pipeline Section and Weld Joint Mecha
22、nical Outer-Layer Material Requirements . 14 Table 15 Pipeline Section and Weld Joint Total Tape System Material Requirements . 14 _ SP0109-2009 NACE International 1 _ Section 1: General 1.1 This standard practice presents guidelines for establishing the minimum requirements to ensure the proper sel
23、ection, application, and performance of bonded tape coatings. These coatings are used as the external corrosion protection for new and existing pipe, girth welds, and fittings, and for repair and rehabilitation. The primary function of these tape coating systems is to prevent corrosion of the pipeli
24、ne when used with or without cathodic protection (CP). This standard provides guidelines for the proper pipeline surface preparation, tape coating system application, inspection, and tape coating damage repair to ensure long-term performance. 1.2 Bonded tape coatings can be applied in, over, or besi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NACESP01092009FIELDAPPLICATIONOFBONDEDTAPECOATINGSFOREXTERNALREPAIRREHABILITATIONANDWELDJOINTSONBURIEDMETALPIPELINESITEMNO21143

链接地址:http://www.mydoc123.com/p-835795.html