ITU-T L 38-1999 Use of Trenchless Techniques for the Construction of Underground Infrastructures for Telecommunication Cable Installation - Series L Construction Installation and Psi.pdf
《ITU-T L 38-1999 Use of Trenchless Techniques for the Construction of Underground Infrastructures for Telecommunication Cable Installation - Series L Construction Installation and Psi.pdf》由会员分享,可在线阅读,更多相关《ITU-T L 38-1999 Use of Trenchless Techniques for the Construction of Underground Infrastructures for Telecommunication Cable Installation - Series L Construction Installation and Psi.pdf(42页珍藏版)》请在麦多课文档分享上搜索。
1、INTERNATIONAL TELECOMMUNICATION UNION ITU=T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU L.38 (09/99) _- SERIES L: CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT Use of trenchless techniques for the construct ion of u nde rg rou nd i nf rastr uctu res for
2、telecommunication cable installation i ITU-T Recommendation L.38 (Previously CCITT Recommendation) ITU-T L-SERIES RECOMMENDATIONS CONSTRUCTION, INSTALLATION AND PROTECTION OF CABLES AND OTHER ELEMENTS OF OUTSIDE PLANT IlIII For further details, please refer to ITU-T List of Recommendations. - STDaIT
3、U-T RECMN L.38-ENGL L999 4862571, Obb5L35 5T2 ITU-T RECOMMENDATION L.38 USE OF TRENCHLESS TECHNIQUES FOR THE CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES FOR TELECOMMUNICATION CABLE INSTALLATION Summary This Recommendation describes the main techniques which allow installation of underground telecomm
4、unication network infrastructures minimizing or eliminating the need for excavation. These techniques, commonly known as trenchless or no-dig techniques, create a horizontal bore below the ground in which the underground infrastructure (ducts, pipes or direct buried cables) can be placed. Trenchless
5、 techniques can reduce environmental damage and social costs and at the same time, provide an economic alternative to open-trench methods of installation. After a description of the available techniques, this Recommendation examines the different kinds of work that are performed, the preliminary ope
6、ration that shall be carried out, the drilling operation and the installation procedure advising on general requirements. Source ITU-T Recommendation L.38 was prepared by ITU-T Study Group 6 (1997-2000) and was approved under the WTSC Resolution No. 1 procedure on the 24th of September 1999. Recomme
7、ndation L.38 (09/99) I FOREWORD ITU (International Telecommunication Union) is the United Nations Specialized Agency in the field of telecommunications. The ITU Telecommunication Standardization Sector (ITU-T) is a permanent organ of the ITU. The ITU-T is responsible for studying technical, operatin
8、g and tariff questions and issuing Recommendations on them with a view to standardizing telecommunications on a worldwide basis. The World Telecommunication Standardization Conference (WTSC), which meets every four years, establishes the topics for study by the ITU-T Study Groups which, in their tur
9、n, produce Recommendations on these topics. The approval of Recommendations by the Members of the ITU-T is covered by the procedure laid down in WTSC Resolution No. 1. In some areas of information technology which fall within ITU-Ts purview, the necessary standards are prepared on a collaborative ba
10、sis with IS0 and IEC. NOTE In this Recommendation the term recognized operating agency (ROA) includes any individual, company, corporation or governmental organization that operates a public correspondence service. The terms Administration, ROA and public correspondence are defined in the Constituti
11、on of the ITU (Geneva, 1992). INTELLECTUAL PROPERTY RIGHTS The ITU draws attention to the possibility that the practice or implementation of this Recommendation may involve the use of a claimed Intellectual Property Right. The ITU takes no position concerning the evidence, validity or applicability
12、of claimed Intellectual Property Rights, whether asserted by ITU members or others outside of the Recommendation development process. As of the date of approval of this Recommendation, the ITU had not received notice of intellectual property, protected by patents, which may be required to implement
13、this Recommendation. However, implementors are cautioned that this may not represent the latest information and are therefore strongly urged to consult the TSB patent database. O ITU 1999 All rights reserved. No part of this publication may be reproduced or utilized in any form or by any means, elec
14、tronic or mechanical, including photocopying and microfilm, without permission in writing from the ITU. ii Recommendation L.38 (09/99) _ STDmITU-T RECMN L-38-ENGL 1999 H 486259% 0bb5337 375 CONTENTS Page 1 2 3 3.1 3.2 3.3 4 5 5.1 5.2 6 6.1 6.2 6.3 6.4 7 8 8.1 8.2 8.3 8.4 9 9.1 9.2 9.3 9.4 Scope Avai
15、lable techniques Kinds of work . Long sections Crossings Urban environment . Site investigation Preparatory steps Use of trenchless techniques not requiring the excavation of a launch pit Use of trenchless techniques that require the excavation of a launch pit . 5.2.1 Impact moling . 5.2.2 Pipe ramm
16、ing 5.2.3 Microtunnelling and pipejacking Drilling operations Guided boring/directional drilling 6.1.1 Pilot bore creation . 6.1.2 Reaming and pullback . 6.1.3 Duct inspection . Impact moling . Pipe ramming . Pipejacking and microtunnelling Record keeping and documentation . Ground conditions Guided
17、 boring/directional drilling Impact moling . Pipe ramming . Pipejacking and microtunnelling Applications . Guided boring/directional drilling Impact moling . Pipe ramming . Pipejacking and microtunnelling Recommendation L.38 (09/99) 1 1 2 5 9 9 9 10 10 11 12 12 13 13 13 . 111 STD-ITU-T RECMN L.3B-EN
18、GL It999 H 4862593 Obb5338 20s 10 Conclusion 11 Glossary Appendix I - Available techniques Guided boring and directional drilling . 1.1.1 Methods . I . 1.2 Drilling machines I . 1.3 Drill pipes I . 1.4 Drilling fluids I . 1.5 Tracking and guidance systems . I . 1.6 Ancillary equipment 1.2.1 Monitori
19、ng I . 1 1.2 Impact moling . 1.2.2 Head types . 1.3 Pipe ramming . 1.3.1 Set-up 1.3.2 Bore options 1.4 Pipejacking and microtunnelling 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.4.7 1.4.8 1.4.9 1.4.10 1.4.1 1 1.4.12 Planning Excavation and spoil removal in pipejacking . Excavation and spoil removal in mi
20、crotunnelling Microtunnelling work method classification Position detecting methods . Soil improvement methods . Jacking frames . Shafts . Pipes Lubrication Interj acks . Jacking loads . Page 13 14 14 14 15 16 18 18 19 20 20 21 22 22 22 23 23 24 25 25 29 30 31 32 32 32 33 34 34 iv Recommendation L.3
21、8 (09199) Recommendation L.38 Guided boring/directional drilling USE OF TRENCHLESS TECHNIQUES FOR THE CONSTRUCTION OF UNDERGROUND INFRASTRUCTURES FOR TELECOMMUNICATION CABLE INSTALLATION (Geneva, 1999) Fluid-assisted boring Dry boring 1 Scope This Recommendation: e makes a classification of differen
22、t kind of works that are performed; describes the drilling operation and installation procedures requirements; describes situations where trenchless techniques are recommended. e describes the preliminary operations; e Microtunnelling 2 Available techniques A broad classification of the available tr
23、enchless techniques is given in Table 1. A more detailed description of each technique is reported in Appendix I. High strength pipe method * Penetrating method * Auger excavation method * Slurry method * Slurry pressure balanced method * Boring method * Auger excavation method * Slurry method * Slu
24、rry pressure balanced method * Boring method Low strength pipe method * Penetrating method I Piperamming 3 Kinds of work The following work classification is performed in order to give advice on the best equipment to use, depending on the different operational needs. 3.1 Long sections Trenchless tec
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTL381999USEOFTRENCHLESSTECHNIQUESFORTHECONSTRUCTIONOFUNDERGROUNDINFRASTRUCTURESFORTELECOMMUNICATIONCABLEINSTALLATIONSERIESLCONSTRUCTIONINSTALLATIONANDPSIPDF

链接地址:http://www.mydoc123.com/p-799490.html