《ITU-R S 1806-2008 Availability objectives for hypothetical reference digital paths in the fixed-satellite service operating below 15 GHz《运行在15 GHz以下卫星固定业务中的假设参考数字通道的可用性目标》.pdf》由会员分享,可在线阅读,更多相关《ITU-R S 1806-2008 Availability objectives for hypothetical reference digital paths in the fixed-satellite service operating below 15 GHz《运行在15 GHz以下卫星固定业务中的假设参考数字通道的可用性目标》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、 Rec. ITU-R S.1806 1 RECOMMENDATION ITU-R S.1806 Availability objectives for hypothetical reference digital paths in the fixed-satellite service operating below 15 GHz (Question ITU-R 73/4) (2008) Scope This Recommendation deals with availability objectives for hypothetical reference digital paths (
2、HRDPs) in the fixed-satellite service operating below 15 GHz. It is based on the availability objectives specified in relevant ITU-T Recommendations and complements availability and performance objectives contained in relevant ITU-R Recommendations, as listed under References. References ITU-T Recom
3、mendation G.827: Availability performance parameters and objectives for end-to-end international constant bit-rate digital paths. Recommendation ITU-R S.579: Availability objectives for a hypothetical reference circuits and hypothetical reference digital paths when used for telephony using pulse cod
4、e modulation, or as part of an integrated services digital network hypothetical reference connection, in the fixed-satellite service operating below 15 GHz. Recommendation ITU-R S.614: Allowable error performance for a satellite hypothetical reference digital path in the fixed-satellite service oper
5、ating below 15 GHz when forming part of an international connection in an integrated services digital network. Recommendation ITU-R S.1062: Allowable error performance for a satellite hypothetical reference digital path operating below 15 GHz. Recommendation ITU-R S.1424: Availability objectives for
6、 a hypothetical reference digital path when used for the transmission of B-ISDN asynchronous transfer mode in the fixed-satellite service by geostationary orbit satellite systems using frequencies below 15 GHz. The ITU Radiocommunication Assembly, considering a) that the hypothetical reference digit
7、al paths (HRDPs), as defined in Recommendation ITU-R S.521, in the fixed-satellite service (FSS) are intended as a guide to designers and planners; b) that the availability of an HRDP is determined by the combined effects of equipment and propagation availability; c) that the equipment availability
8、(including the space station) is dependent on reliability performance, maintainability and maintenance support performance; d) that unavailability due to propagation impairments is dependent on the exceedance of an attenuation level threshold, the frequency of these exceedances and the duration of s
9、uch exceedances; 2 Rec. ITU-R S.1806 e) that satellite systems are capable of offering availability performance similar to that of terrestrial paths under service level agreements (SLAs) or service quality agreements (SQAs) for individual links (see ITU-T Recommendation E.801); f) that the availabil
10、ity of a geostationary-satellite link is essentially independent of the distance between the origination and termination points of the link, recommends 1 that the availability of an HRDP in the FSS should be defined by the following formula: %lity)Unavailabi100(tyAvailabili = where: %100timeRequired
11、timeeUnavailabllityUnavailabi = where the required time is defined as the period of time during which the user requires the digital path to be in a condition to perform a required function, and unavailable time is the cumulative time of digital path interruptions within the required time (see also r
12、ecommends 5 for a discussion of unavailable time); 2 that the outage intensity should be defined as the number of outages (i.e. a period of unavailable time as defined in recommends 5) per measurement period, where the typical measurement period is one year (8 766 h) (see also Note 5); 3 that an HRD
13、P should meet the objectives of propagation-dependent availability given in Table 1: TABLE 1 Propagation-dependent availability objectives for an FSS digital satellite link Rate (Mbit/s) Up to primary rate 1.544 to 2.048 Above primary rate Parameter Availability Outage intensity(outages/year) Availa
14、bility Outage intensity (outages/year) Mean value for HRDP 99.9% 20 99.96% 20 4 that the additional unavailability of an HRDP in the FSS due to equipment should not be more than 0.11% of a year; 5 that a link in the FSS as defined between the ends of the HRDP in Recommendation ITU-R S.521 should be
15、considered unavailable if one or more of the conditions in 5.1 to 5.3 below exist at either of the receiving ends of the link for 10 consecutive seconds or more (see Note 3): 5.1 the digital signal is interrupted (i.e. alignment or timing is lost); 5.2 for a transmission below the primary rate (1.54
16、4 Mbit/s or 2.048 Mbit/s), the bit error ratio (BER), averaged over 1 s, exceeds 103; Rec. ITU-R S.1806 3 5.3 for a transmission at or above the primary rate (1.544 Mbit/s or 2.048 Mbit/s), each second is considered to be a severely errored second (SES) event, where an SES is defined consistently wi
17、th ITU-T Recommendation G.826 as a second which contains 30% or more errored blocks or at least one severely disturbed period (SDP); 6 that the following Notes should be regarded as part of this Recommendation: NOTE 1 A period of unavailable time begins when one of the conditions in 5.1 to 5.3 persi
18、sts for a period of 10 or more consecutive seconds. These 10 s are considered to be unavailable time. The period of unavailable time terminates when the same condition ceases for a period of at least 10 consecutive seconds. These 10 s are considered to be available time. Periods of degraded performa
19、nce lasting less than 10 consecutive seconds, during which conditions in recommends 5.1 to 5.3 exist, are considered available time. NOTE 2 All outages due to solar eclipses and interference from the Sun are included as part of the unavailable time in recommends 3 when they occur during the required
20、 time. The impact of solar interference during the required time can be minimized by operational measures since these events can be accurately predicted (see Recommendation ITU-R S.1525). NOTE 3 Availability calculations should explicitly take into account mean time between failures, mean time for r
21、esumption of service and precautions taken to mitigate interruptions and impairments of satellite performance including the use of reserve channels and back-up systems. NOTE 4 A percentage of unavailability, due to propagation, for any month is assumed to correspond to a period of any year by a conv
22、ersion factor of 5, i.e. 0.2% of any month would correspond to 0.04% of any year (referring to the term of “any year”, see Note 11 of Recommendation ITU-R S.353). This conversion factor is discussed in Annex 1 to Recommendation ITU-R S.614. NOTE 5 Outage intensity objectives in Table 1 are based on
23、a value of the “mean time to restore” (i.e. the average duration of unavailable service time intervals) of 4 h. Propagation impairments, giving rise to self-healing unavailability events, are usually much shorter. In this case, they should not be taken into account. NOTE 6 Additional information on
24、outage intensity objectives for digital satellite paths is given in Annex 1. Annex 1 The applicability of the availability ratio and outage intensity parameters of ITU-T Recommendation G.827 to satellite links 1 Introduction This Annex examines the availability objectives given in ITU-T Recommendati
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITURS18062008AVAILABILITYOBJECTIVESFORHYPOTHETICALREFERENCEDIGITALPATHSINTHEFIXEDSATELLITESERVICEOPERATINGBELOW15GHZ

链接地址:http://www.mydoc123.com/p-793577.html