GPA RB-194-1994 Tentative NGL Loading Practices《试验性液化天然气装载实践》.pdf
《GPA RB-194-1994 Tentative NGL Loading Practices《试验性液化天然气装载实践》.pdf》由会员分享,可在线阅读,更多相关《GPA RB-194-1994 Tentative NGL Loading Practices《试验性液化天然气装载实践》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、 GPA RB-194 94 3824699 OOlbbb1 587 W GPA Reference Bulletin 194-94 TENTATIVE NGL LOADING PRACTICES RB-194-94 Approved as Reference Bulletin 1994 Gas Processors Association 6526 East 60th Street Tulsa, Oklahoma 741 45 GPA RB-394 94 382LI699 O036662 413 TABLE OF CO NTENn Eis Disclaimer . 3 Introductio
2、n and SCO pe . 3 Description of Products 3 Definitions 4 Measurement . 4 Layout and Spacing . 5 Equipment and Installation Siandards 5 General Design Consideratiom 7 Training of Personnel . 8 Carriers Responsibility 8 dorization 8 Product Specifications and Testing 8 Loading and Unloading Procedures
3、 8 Specific Considerations for Volume Transfer Systems 15 Specific Considerations for Weight Transfer Systems . 15 Safety 16 Bibliography . 18 2 GPA RB-194 94 W 3824699 0036663 35T GPA publications necessarily address problems of a general nature and may be used by anyone desiring to do so. Every ef
4、fort has been made by GPA to assure accuracy and reliability of the information contained m ils publications. With respect to particular circumstances, local, state, and federai laws and regulations should be reviewed. It is not the intent of GPA to assume the duties of employers, manufacturers, or
5、suppliers to warn and properly train employees, or others exposed, cmceming heaith and safety risks or precautions. GPA makes no representation, warranty, or guarantee in connection with this pubiicatim and bereby expressly disclaims any liability or responsibility for loss and damage resulting from
6、 its use or for the vioiatim of any federai, state, or municipai regulation with which this publication may conflict, or for any infringement of letters of patent regarding apparahis, equipment, or method so covered. This reference bulletin presents suggested safety practices and procedures pertaini
7、ng to the loading and unloading of NGL (Natural Gas Liquids) at gas processing plants, refineries, tank farms, and marine and pipeline terminais. Many existing codes, standards, regulations, and safety practices, as employed by a cross section of the indusq, have been used in preparing this document
8、. This reference bulletin is not intended to be a code or standard for loading or unloading procedures, or for NGL facility design, but is intended to be a guide for installations where the loading or unloading of NGL is performed. Included in this reference bulletin is a bibliography containing ref
9、erences to material that pertain to the design and operation of NGL installations. Although several states have regulations pertaining to the transfer of NGL into or out of tank tnicks, tank cars, and barges at loading facilities, references to individual state regulations have not been included. Th
10、e bibliography is referenced by numbers placed at the end of various paragraphs. DESCRIPTTON OF PRO DUCE NGL as used in this reference bulletin shall mean and include any product which is composed predominantly of any of the following hydrocarbons, or mixtures of them: propane, propylene, normal but
11、ane, isobutane, butylene, isopentane, normal pentane, and hexanes-plus. Quantities of ethane and ethylene may also be present. (36) 3 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. DEFINITIONS - Liquefied petroleum gas; also known as LE. This material is predominately propane or butane, separately o
12、r in mixtures, which is maintained in a liquid state under pressure within the confining vessel. Driver-attended loading - The loading procedure wherein the driver of the transport truck loads the NGL from the seliers equipment into the tank truck. Volume mfer system - A system wherein the loaded NG
13、L is measured by volurrie, usually in gallons. Ticket-printins meter - A volume meter which issues a “ticket“ containing information, including the identity and quantity of the material being transferred. Temuerature -comDensatd - Refers to a volume meter which measures the volume and automatically
14、corrects the volume to 60OF. Meter proving - A procedure for checking the accuracy of a meter. Overfilling - A load which exceeds the safe maximum volume for a particular material. The maximum filling volume allots space for expansion of the liquid caused by an increase in product temperature. Overl
15、oad - A load weighing more than that permitted by regulation or equipment raLing. Preset de vice - A device that allows a predetermined volume or weight of a product to be loaded on a transport truck. Permissive loading - Loading which is allowed or is initiated by an identifying key or card. Interl
16、ocks - Arrangements of electrical and/or mechanical equipment that prevent bypassing programmed steps, thereby ensuring a safe, permissible procedure for loading NGL from the sellers equipment. Static bonding - The electrical system permitting the dissipation of static electricity that may be contai
17、ned on the transport truck or generated by the loading procedure. Intrinsicallv safe - Safe because of its inherent characteristics or properties, as defined by the National Electrical Code (NEC). (20) Time delav - A device that delays a desired action for a finite period of time, thus delaying acti
18、on on conditions that may be self-correcting. 15. 16. 17. 18. 19. 20. 21. SDraV loaded - A system wherein the product being loaded is sprayed into the top of the tank to condense vapors within the iank. Excess flow valve - A fail-safe valve that prevents the flow rate from exceeding a preset maximum
19、. wine device - The equipment used to determine the level of liquid within the tank. Positive disdacement meter - A meter that determines volume by measuring the actual displacement volume of the liquid transferred. Weight pansfer system - A system to measure the loaded NGL by weight, usually in pou
20、nds. Total weight indicator - An accessory, either of the dial or optical projection type, that is usually incorporated in the ticket printing assembly. Printing register - A register used in conjunction with a transfer system which issues a ticket containing information that includes the identity a
21、nd quantity of the product being transferred. MEASUREMENT All measurement devices should be installed, operated, and proven in accordance with the API Manual of Petroleum Measurement Standards. A. TRUCKSCALES Platform scales may be used to weigh trucks before and after loading or unloading, using th
22、e difference in weight to calculate the volume transferred. 1. Ticket however, they are not normaily used for tank truck or tank car loading or unloading. (16,35) CONTAINERS Each cargo container should be equipped with temperature and pressure gauges. (14) Good spacing is essential for traffic contr
23、ol and control of emergencies. Facilities should be constructed entirely of noncombustible maierials. Proper drainage of the area is also important. A. MINIMUM DISTANCE F2EQUIEMENTS NGL loading and unloading facilities, including marine temiinal and barges, should be located with respect to other fa
24、cilities in accordance with applicable standards, niles, and regulations.(lO, 23, 29,30,33) B. TANK CAR LOADING RACK LAYOUT Tank car loading racks should be designed to meet local, state, and federal agency requirements and in accordance with raroad and industry standards. The layout must be level a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GPARB1941994TENTATIVENGLLOADINGPRACTICES 试验性 液化 天然气 装载 实践 PDF

链接地址:http://www.mydoc123.com/p-782315.html