GPA PLANT PROJECT-1997 Plant Project and Design Check List《工厂项目和设计检核表》.pdf
《GPA PLANT PROJECT-1997 Plant Project and Design Check List《工厂项目和设计检核表》.pdf》由会员分享,可在线阅读,更多相关《GPA PLANT PROJECT-1997 Plant Project and Design Check List《工厂项目和设计检核表》.pdf(172页珍藏版)》请在麦多课文档分享上搜索。
1、STD-GPA SRCH 3777-ENGL 3777 = 382qb77 0038553 533 GPA PLANT PROJECT AND DESIGN CHECK LIST Initial Publication 1970 Revised 1982, 1997 Gas Processors Association 6526 E. 60th St. Tulsa, Oklahoma 74145 FOREWORD In late 1970 Section “At undertook the development of a plant design check list based on th
2、e results of a questionnaire distributed in early 1970. A Task Force was assigned consisting of W. T. Lawler, Chairman, Sun Oil Company W. A. Haliburton, Cities Service Oil Co. D. R. Raney, Lone Star Gas Producing Co. Later additions to the Task Force were Messrs. E. C. Cramp, Atlantic Richfield Co.
3、 and W. H. Schulz, Mobil Oil Corp. Task Force members developed the check list format and prepared several of the sections. Others that participated in preparing individual sections were: Peter Leathard B. H. Williams M. D. Atkins J. E. Raley A. B. Richert Joseph Shutz C. O. Miller Allen Tarbutton W
4、. C. Hart O. P. Procter W. R. Fairchild W. L. Hamilton R. E. Porcher Marvin Miller Atlantic Richfield Co. Continental Oil Co. Cotton Valley Operating Co. Dorchester Gas Producing CO. Dresser Engineering Co. Exxon Co. U.S.A. Getty Oil Co. Mitchell Energy Corp. Phillips Petroleum Co. Phillips Petroleu
5、m Co. Shell Oil Co. Sun Oil Co. Union Texas Petroleum Xcel Products Co. The guidance and attention to details of Chairman Lawler, as well as the actual preparation of several sections, is particularly appreciated. In 1981 a major revision of this Check List was made by Section “A“ Task Force compose
6、d of the following: Hubert C. Daugherty, HNG Petrochemicals, Inc. Charles B. Wallace, Shell Oil Co. Melvin W. Noe, Chairman, Texas Gas Exploration Corp. Charles Hamilton, Texas Gas Exploration Corp. In 1996 another major revision to the Check List was made by a Section “A“ Task Force Chaired by Crai
7、g Wentworth and composed of the following people: Charles Coarsey, Chevroflarren Naomi Orbeck, Colorado Interstate Gas Co. Carl Soderman, PanEnergy Field Services, Inc. John Harryman, Shell E Vent Hare 10 STD-GPA SRCH L977-ENGL 1977 3824b97 00185b5 02b W M. Emergency; Vent Flare N. Protective Coatin
8、gs O. Cathodic Protection P. Layout, Spacing, and Maintenance Q. Workover Rig R. Helipad Quarters RESERVOIR AND PRODUCTION FORECAST A. Initial Reservoir Pressure B. Full Production Reservoir Pressure C. Abandonment Reservoir Pressure D. Shut-in Wellhead Pressure E. initial Wellhead Pressure F. Full
9、Production Wellhead Pressure G. Abandonment Wellhead Pressure H. Time Forecast Wellhead Pressure, Temperature, Flow, and Composition of Gas, Oil, and Brine (Table Temperature Flow, Oil Gas Brine Temperature Flow, Oil Gas Brine Temperature Flow, Oil Gas Brine Temperature Flow Temperature Flow Tempera
10、ture Flow or Charts Attached) III. OIL, GAS, AND PRODUCED BRINE SEPARATION A. Primary Separation and Test Methods and Conditions B. Primary Hydrate Inhibition C. Oil RW Requirement D. Oil H2S Removal Required E. Oil CO2 Removal Required Max BS & W F. Other IV. ELECTRIC GENERATORS A. TypeNo. Driver K
11、W Volts B. TypeNo. Driver KW Volts C. TypeNo. Driver KW Volts Phases HZ Fuel Phases Hz Fuel Phases Hz Fuel 11 STDOGPA SRCH 1777-ENGL 1777 = 382Lib77 00185bb Tb2 W D. UPS Electric System E. Waste Heat Recovery E Starting System * V. GAS COMPRESSION PHASES (Pressure Maintenance) A. Initiai Requirement
12、 B. 2nd Phase C. 3rdPhase D. Waste Heat Recovery E. Starting System VI. PRODUCED BRINE DISPOSAL Initial Full Protection Abandonment A. ToSea: B. Treatment: C. To Injection: D. Treatment: E. Pressure: F. Temperature: G. How: H. mimpDnvers: I. Effluent Max Hydrocarbon Content: VII. GASTREATMENT _ _ B.
13、 Hydrocarbon Dew Points Required 1. For Reinjection 2. ForFuel 3. For Pipeline Export C. Moisture Dew Point Required VIII. PLANTCOOLING A. Air B. (Sea) Water C. Treatment (In and Out) D. Closed Cycle 12 STD-GPA SRCH 1977-ENGL 1997 382Yb77 00185b7 7T7 IX. X. XI. PLANT HEATING A. Direct Fired B. Heat
14、Medium C. Waste Heat Recovery D. Winterizing, Hydrate Protection E. Other OUTLET STREAMS STORAGE, SURGE, DISPOSITION A. Stabilized Crude Oil to B. NGL to C. Residue Gas to D. Oily Waste to E. Sanitary Waste to F. BargeAanker Mooring and Loading Facilities G. Loading Rates H. Metering: CrudeOil NGL G
15、as Injection Seawater Coolant Seawater ANCILLARY SYSTEMS A. Storage, Transfer and Injection: 1. Methanol 2. Glycol 3. Solid Desiccant 4. Caustic 5. Bactericide 6. Pour Point Depressant 7. Oil Corrosion Inhibitor 8. Gas Corrosion Inhibitor 9. Demulsifier 10. Lubricants 11. Heat Medium Storage 12. Oth
16、er B. Produced Water Clarification C. Runoff Water Clarification 13 - . STD*GPA SRCH 1997-ENGL 1997 382Lib97 00185b8 835 D. Sump Disposal E. Sump Oil Skimming E (Heavy Oil) Pipeline Water Displacement G. Pipeline Corrosion Protection H. Structure (Jacket) Corrosion Protection I. Fire Detection J. Fi
17、re Fighting K. Personnel Evacuation L. Other Safety Systems and Zone (Area) Classifications _ 1 I Gas Detection 2. Hydrogen Sulfide Detection 3. Dry Chemical System M. Instrument Air Compression, Dehydration, Storage N. Starting Air Compression, Dehydration, Storage O. Communications 14 PART II SECT
18、ION 1 - PLANT START-UP Location Type I. DESIGN AND INITIAL CONSTRUCTION PHASE A. Assign Key Personnel 1. Supervisory 2. Engineering 3. Maintenance 4. Operations 5. 6. Process Hazard Analysis Team (PHA) Process Safety Management Team (PSM) 7. he-startup Safety Review (PSM) II. FULL CONSTRUCTION PHASE
19、 A. Select and Order 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Fire Fighting Equipment a. Cartridge b. SparePower Safety Equipment, Personnel Protection First Aid Supplies Shop Equipment Hand Tools Shop Supplies Laboratory Equipment and Supplies Office Furniture, Supplies, and Equipment Warehouse Bins/Shelving
20、 Spare Parts B. C. STDeGPA SRCH 1777-ENGL 1777 = 3824b77 0018570 473 11. Plant Vehicles Procedures, Manuals, and Logs 1. 2. 3. 4. 5. 6. 7. 8. Plant Start-up Procedures HAZOPPHA Review Schedule Operations Manual Preventive Maintenance Schedules and Guidelines Logs and Reports - Operational and Mainte
21、nance Pre-Start-up Inspection Check List a. Vessels b. Piping c. Rotating Equipment d. Control System Process Safety Management a. Piping and Instrumentation Drawings b. Material Safety Data Sheets c. Specification Sheets for all Tagged Equipment d. Management of Change Procedures e. Process How Dia
22、grams Assign Remainder of Plant Personnel 1. Operational 16 STD-GPA SRCH 1797-ENGL 1777 382Lib79 0018571 32T D D. E. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 2. Maintenance 3. Clerical 4. Technical 5. SafetyEnvironmental Initiate Training Programs 1. First Aid Course 2. Equipment Familiarization 3
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GPAPLANTPROJECT1997PLANTPROJECTANDDESIGNCHECKLIST 工厂 项目 设计 检核 PDF

链接地址:http://www.mydoc123.com/p-782312.html