GMW GMW14675-2012 Exhaust System Isolator Requirements and Tests Issue 3 English.pdf
《GMW GMW14675-2012 Exhaust System Isolator Requirements and Tests Issue 3 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW14675-2012 Exhaust System Isolator Requirements and Tests Issue 3 English.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW14675 Exhaust System Isolator Requirements and Tests Copyright 2012 General Motors Company All Rights Reserved August 2012 Originating Department: North American Engineering Standards Page 1 of 4 1 Introduction Note: Nothing in this standard
2、supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Scope. This General Specification contains the general requirements and associated tests regarding exhaust system isolators. Materials
3、 covered by this specification are divided into three types. 1.1.1 Type A. Ethylene propylene diene monomer (M-class) rubber (EPDM) for +125 C permanent temperatures. 1.1.2 Type B. Vinyl Methyl Silicone (VMQ) for +150 C permanent temperatures. 1.1.3 Type C. Drawing defined (e.g., using SAE J200 or A
4、STM D2000 line callout). 1.2 Mission/Theme. Exhaust system isolators are used to attach the exhaust system to the vehicle and provide isolation from exhaust system structure borne noise and vibration. 1.3 Classification. Not applicable. 2 References Note: Only the latest approved standards are appli
5、cable unless otherwise specified. 2.1 External Standards/Specifications. ASTM D2000 ISO 1431-1 ISO 23529 ISO 188 ISO 7619-1 SAE J200 2.2 GM Standards/Specifications. GMW3059 GMW14203 GMW14566 GMW14739 GMW3116 GMW14473 GMW14682 GMW16331 2.3 Additional References. Relevant Part Math Data Global Genera
6、l Assembly Manufacturing Bill of Process 3 Test Preparation and Evaluation 3.1 Resources. According to the relevant test procedure. 3.1.1 Calibration. The test facilities and equipment shall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facil
7、ities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with respect to their physical definition. 3.1.3 Facilities. According to the relevant test procedure. 3.1.4 Equipment. According to the relevant test procedure. 3.1.5 T
8、est Vehicle/Test Piece. According to the relevant test procedure. 3.1.6 Test Time. According to the relevant test procedure. 3.1.7 Test Required Information. According to the relevant test procedure. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM
9、 WORLDWIDE ENGINEERING STANDARDS GMW14675 Copyright 2012 General Motors Company All Rights Reserved August 2012 Page 2 of 4 3.1.8 Personnel/Skills. According to the relevant test procedure. 3.2 Preparation. According to the relevant test procedure. 3.3 Conditions. 3.3.1 Environmental Conditions. Acc
10、ording to the relevant test procedure. 3.3.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on component drawings, test certificates, reports, etc. 3.4 Instructions. According to the relevant test procedure. 3.5 Da
11、ta. According to the relevant test procedure. 3.6 Safety. This standard may involve hazardous materials, operations, and equipment. This standard does not propose to address all the safety problems associated with its use. It is the responsibility of the user of this standard to establish appropriat
12、e safety and health practices and determine the applicability of regulatory limitations prior to use. 3.7 Documentation. Samples of components or material released to this standard shall be tested for conformity with the requirements of this standard and approved by the responsible GM Department pri
13、or to the start of delivery of production level components or materials. Any change to the component or material, e.g., design, function, properties, manufacturing process and/or location of manufacture requires a new release of the product. It is the sole responsibility of the supplier to provide t
14、he customer, unsolicited, with documentation of any change or modification to the product/process, and to apply for a new release. If not otherwise agreed to, the entire verification test shall be repeated and documented by the supplier prior to start of delivery of the modified or changed product.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW146752012EXHAUSTSYSTEMISOLATORREQUIREMENTSANDTESTSISSUE3ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757526.html