GME GMI L-6X01-5-1998 Camshaft Wear Test (English German Includes Appendix 1-18 ITDC Release Draft for Harmonization).pdf
《GME GMI L-6X01-5-1998 Camshaft Wear Test (English German Includes Appendix 1-18 ITDC Release Draft for Harmonization).pdf》由会员分享,可在线阅读,更多相关《GME GMI L-6X01-5-1998 Camshaft Wear Test (English German Includes Appendix 1-18 ITDC Release Draft for Harmonization).pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、Camshaft Wear Test File name: 65068-.doc DM GMB HOLDEN ISUZU SAAB ITDC Prepared: Kr Krmme1 i Nockenwellen - Verschleitest Approved GM do Brasil Approved Saab Approved ISUZU Approved Delta Motor Approved Holden Approved Dr. H. K. Kemmann Dr. G. Reinheimer R. Schneider ITDC July 1998 Page 1 of 31 6 a
2、E- LBSP GMI TP l 03/96 GM INTERNATIONAL ENGINEERING STANDARD Draft GMI L-6x014 Revisions nderungen Date Paragraph Datum Abschnitt 07.98 ITDC Release 07.98 ITEZ - Freigabe Replacement for GME L-XOl-5 Ersatz fr GME L-XOl-5 Page 2 of 31 July 1998 LBSP GMI 2 11195 GM INTERNATIONAL ENGINEERING STANDARD D
3、raft GMI L-6x01-5 I Introduction 1.1 Purpose Testing wear characteristics for tribological system elements, camshafts (cams), cam follower, tappet, tappet bridge, and roller-type cam follower while paying special attention to the finish quality and the materials or material combinations. 1.2 Forewor
4、d In conjunction with the test oil, the camshaft wear test shall investigate the wear behaviour of the tribo- logical system elements, cams and cam followers in operating engines with heavily polluted gasoline engine oil under defined operating conditions after a specified operation period and compa
5、red with alter- native system element characteristics (materials, component geometry, surface roughness, etc.). 1.3 Applicability Camshafts (cams), cam followers, taDpets, tappet bridges and roller-type cam followers for all gasoline an8 diesel engines 1.4 Definitions N.a. 1.5 References 1 S.1 Order
6、 of Precedence In the event of a conflict between the text of the test procedure and the documents cited herein, the text of the test procedure takes precedence. Nothing in the test procedure, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Remark:
7、In the event of a conflict between the Eng- lish and the domestic language, the English lan- guage shall take precedence. 1.5.2 Government Documents N.a. I Einleitung 1.1 Zweck Erprobung des Verschleiverhaitens von tribotech- nischen Cystemelementen Nockenwellen (Nocken), Schlepphebel, Stel, Stelbrc
8、ken und Rollen- schlepphebel bei besonderer Beachtung der Bear- beitungsqualitt und der Werkstoffe bzw. Werkstoff- Paarungen. 1.2 Vorwort Mit dem Nockenwellen-Verschleitest in Verbindung mit dem Testl soll in befeuerten Motoren nach festgelegten Laufzeiten das Verschleiverhalten der tribotechnischen
9、 Systemelemente Nocken und Nok- kenfolger unter definierten Betriebsbedingungen mit stark verschmutztem Otto-Motorenl untersucht und mit Varianten der Systemelemente-Eigenschaften (Werkstoffe, Bauteilgeometrie, Oberflchenrauheit, pir ,.) verglichen werden. i ,3 Anwendbarkeit Nockenwellen (Nocken), S
10、chlepphebel, Stel, S;rlbrcken unc Rollenschlepphebel von allen Seo- una Dieselmotoren. i .4 Definitionen N.a. 1.5 Referenzen 1 S. Rangfolge der Dokumente lm Falle eines Widerspruchs vom Text dieses Priif- verfanrens und den Dokumenten, die in dem Prf- verfanren enthalten sind. hat der Text des Prfve
11、r- fahrens Vorrang. Falls keine Ausnahmen vereinbart wurden, darf cas Prfverfahren keine anzuwenden- cen Gesetze und Regelungen auer Kraft setzen. Hinweis: Im Falle von Unstimmigkeiten zwischen aem englischen und dem landessprachlichen Text, ist der englische Text ausschlaggebend. 1.5.2 Staatliche D
12、okumente N.a. July 1998 Page 3 of 31 I LBSP GMI 2 11 /95 -STD-OPEL GUI L-bXUL-5-GERM 1998 8597338 0U2421b 1T8 6 GM INTERNATIONAL ENGINEERING STANDARD Draft GMI L-6x014 1 S.3 General Motors Documents 1.5.3.1 GMIO B 0401013 First Fill Oil for Otto Engines B 0401055 Maximum Pressure Lubricating Oil LBC
13、H02-03 Test Procedure for Insolubles in Used Lubricating Oils 1.5.3.2 NAO N.a. I .5.4 Industry Documents N.a. 1.5.5 Supplier Documents N.a. I S.6 Other Documents N.a. 2 Resources 2.1 Facilities N.a. 2.2 Equipment 2.2.1 All types of gasoline and diesel engines. 2.2.2 Surface measurement equipment (e.
14、g., Perthen Perthometer including feed equipment). 2.2.3 Form measurement machine (e.g., FAG - FMS 21 00). 2.2.4 Roundness measuring instrument (e.g., Perthen MMK 2). 2.2.5 Recording instrument (e.g., Perthen Macrograph). 1.5.3 General Motorc Dokumente 1.5.3.1 GMIO B 0401013 ErstbefIII fr Ottomotore
15、n B 0401055 Hchstdruckschmierl LBCH02-03 Bestimmung der festen Fremdstoffe in gebrauchten Motorien 1.5.3.2 NAO N.a. 1 S.4 Industrie Dokumente N.a. 1.5.5 Lieferanten Dokumente N.a. 1 S.6 Andere Dokumente N.a. 2 Gerte und Einrichtungen 2.1 Einrichtung N.a. 2.2 Ausrstung 2.2.1 Alle Otto- und Diesel-Mot
16、or-Typen. 2.2.2 Oberfichenmegert (z.B. Perthen Perthometer) inkl. Vorschubeinrtchtung. 2.2.3 Formmemaschine (2.B. FAG - FMS 2100). 2.2.4 Rundheitsmeeinrichtung (Z.B. Perthen MMK 2). 2.2.5 Auzeichnungsgert (z.B. Perthen Macrograph). i. Page 4 of 31 July 1998 LBSP GMI 2 11/95 STD-OPEL GMI L-bXDL-5-GER
17、M 1998 8577338 0024237 O34 E GM INTERNATIONAL ENGINEERING STANDARD Draft GMI L-6x01-5 2.2.6 Mixture of 50 % used diesel oil + 50 % unused oil (B 0401013, with SAE lOW30). The sedimentary content of the test oil shall be determined to LBCH02-03 and shall be (0.8 to 1.2) % by mass. The sedimentary con
18、tent of every test oil fill shall be checked using laboratory oil testing. The test oil and oil filter shall be replaced following an operating period of 200 h. 2.3 Test VehiclelTest Piece Camshafts (cams), cam followers, tappets, tappet bridges and roller-type cam followers. 3 Procedure 3.1 Prepara
19、tion The cam, cam follower, tappet, tappet bridge and roller contact surfaces shall be lighted coated with hypoid oil as specified in B O401055 prior to instaila- tion. The contact surfaces of the parts shall be coated with :he test oil during installation after intermediate measurements. 3.2 Condit
20、ions Deviations from the requirements of this :es: proce- dure shall have been agreed upon. Such require- ments shall be specified on component drawings, test certificates, reports etc. 3.3 Instructions 3.3.1 Measurement of Camshaft, Cam Follower, Tappet, Tappet Bridge and Roller-type Cam Follower T
21、he cam height, cam transverse profiles and the contact surface contours of the cam follower as well of the diameter of the tappets shall be measured before testing is commenced. In addition, the component roughness measure- ments shall be measured as specified in the drawings and checked for complia
22、nce with the drawing tolerances (measurement system e.g., S6P Perthen). 2.2.6 Mischung aus 50 % Diesel Altl + 50 % Frischl (6 0401013, mit SAE 10W30). Der Sedirnentgehalt des Testls ist nach LBCH02-03 ZU ermitteln und mu (0,8 bis 1,2) Gew. % betragen. Der Sediment- gehalt jeder Testl-Charge St anhan
23、d von Labor- Olproben ZU kontrollieren. Nach einer Laufzeit von 200 h sind Testl und Olfilter ZU wechseln. 2.3 VersuchsfahrzeuglProbekrper Nockenwellen (Nocken), Schlepphebel, Stel, Stelbrijcken und Rollenschlepphebel. 3 Durchfhrung 3.1 Vorbereitung Vor dem Einbau sind die Nocken und die Schlepp- he
24、bel-, Stel-, Stelbrcken- und Rollen- Laufflchen leicht mit Hypoid-Ol nach 8 0401055 einzstreichen. Beim EinSac nach Zwischenmessungen sind die Lauflchen der Teiie mit dem Testol einzustreichen. 3.2 Prfbedingungen AbWeichunsen von den Bedingungen dieses Prf- Verfahrens mssen vereinbart werden. Diese
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMEGMIL6X0151998CAMSHAFTWEARTESTENGLISHGERMANINCLUDESAPPENDIX118ITDCRELEASEDRAFTFORHARMONIZATIONPDF

链接地址:http://www.mydoc123.com/p-755469.html